I want to search for...
Permit #2026020126
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7003-00070-0150 |
| Block: 00070 |
| Subdivision: 2190 - SECTION 3-COUNTRY CLUB COVE |
| Job Phone: 386-566-6359 |
| Location Address: 27 CLINTON CT S |
| Type: SW - SEAWALL |
| Issue Date: 02/18/2026 |
| NOC: RECORDED |
| Applicant name: THAD RAYMOND ADAMEK |
| Owner: ADAMS STEVEN L & IDA T TROSKIE-ADAMS H&W |
|
Address 27 CLINTON CT S PALM COAST, FL 32137 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤20,000.00 |
| Job Description: replace 54 lf of existing seawall |
| Type: CN |
Contractor
HALIFAX MARINE CONSTRUCTION, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
945 DUNCAN ROAD SOUTH DAYTONA, FL 32119 |
CRC1330178 (Exp: 08/31/2026) | 386-767-4972 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEAWALL FINAL | 05/15/2026 | FINAL APPROVED | MCONTRYMAN |
| ROW - STORMWATER FINAL | 05/07/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL INSPECTION | 05/07/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| SEAWALL DEADMAN CAP | 04/07/2026 | APPROVED | MCONTRYMAN |
| ROW -TURBIDITY BARRER | 02/20/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 02-20-26 TPOLACEK*** AT THE TIME OF THIS INSPECTION THERE IS NOT A TURBIDITY BARRIWER ON SITE OR IN PLACE | |||
| ROW -TURBIDITY BARRER | 02/20/2026 | APPROVED | TPOLACEK |
| Note: TURBIDITY BARRIER IS IN PLACE AND MUST REMAIN THROUGHOUT ENTIRE BUILD PROCESS. 2/20/2026 - PREVIOUS INSPECTION NOTES 02-20-26 TPOLACEK*** AT THE TIME OF THIS INSPECTION THERE IS NOT A TURBIDITY BARRIWER ON SITE OR IN PLACE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 02/16/2026 | 02/17/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/16/2026 | 02/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/04/2026 | 02/09/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Add General Note (or similarly titled) section titled “City of Palm Coast Seawalls, Bulkheads and Revetments Construction Standards” conspicuously displayed on the plans and add the following general notes: 1. Seawall and revetment construction shall conform to the City of Palm Coast Technical Manual Engineering Design Standards Section 1100.09 Seawalls / Bulkheads and Revetments and the City of Palm Coast Unified Land Development Code Chapter 4, Section 4.01.06. In the event of conflict between seawall and revetment design plans and The City of Palm Coast Technical Manual Engineering Design Standards Section 1100.09, the City of Palm Coast Technical Manual Engineering Design Standards Section 1100.09 and the Unified Land Development Code Chapter 4, Section 4.01.06 shall be controlling. 2. Turbidity barriers shall be installed and maintained in accordance with the City of Palm Coast Technical Manual Engineering Design Standards Section 1200 Erosion Control, Section 1200.01 and Drawing # 1200 B Floating Turbidity Barrier Example. 3. Turbidity barriers shall be installed prior to construction, removal of turf and landscaping and disturbance and removal of any part of the seawall. 4. Turbidity barriers shall be installed and maintained and shall remain in place for the duration of construction and shall not be removed until collected sediment and debris have been removed to the original canal depth or approved plan elevation. 5. Turbidity barriers shall remain in place until all upland areas have been restored and all landscaping and final lot improvements have been completed and the ROW Final Inspection is approved by the City. 6. Turbidity barriers shall not be anchored or otherwise attached to any seawall. 7. Existing seawall panels, bulkhead cap, restraints / deadman, seawall panels shall be completely removed from the City of Palm Coast Right-of-Way and lawfully disposed of in accordance with Florida Statutes and Department of Environmental Protection regulations. Exceptions for partial seawall reconstruction projects may be accepted by the City of Palm Coast at its discretion and with prior coordination and approval before commencement of seawall removal / deconstruction. 8. The new seawall shall be installed entirely within private property and in vertical and horizontal alignment with existing, adjacent seawalls. If no adjacent seawalls exist then seawall panels are to be installed within private property. Not more than one-half of the bulkhead cap may project into the City Right-of-Way provided no part of the seawall panels project into the Right of Way. 9. The top of the seawall bulkhead cap shall be a maximum of elevation of 2.5 feet based on the NAVD 88. 10. The top of the seawall bulkhead cap may be increased in elevation when connection to an existing bulkhead at the end of the canal is necessary but in no case can the new seawall cap be at a higher elevation than the bulkhead at the end of the canal. The maximum allowed transition in elevation is the width of one (1) seawall panel. 11. Upon completion of the seawall, backfill and grading disturbed areas shall be immediately sodded. Erosion control devices shall be maintained until the site is sodded. | |||
| ENGIN1 | COMPLETE | 02/04/2026 | 02/04/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/04/2026 | 02/04/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please show on the site plan where you are replacing the seawall include the color and the materials. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/18/2026 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 02/18/2026 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 02/18/2026 |
| RSI GENERAL INSPECTION 16.25 | ¤16.25 | 02/18/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 02/18/2026 |
| RSI ROW STORMWATER FINAL INSP | ¤32.50 | 02/18/2026 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/18/2026 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/18/2026 |
| SITE PLAN 15 | ¤15.00 | 02/18/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤206.50 |