I want to search for...
Permit #2026020167
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7003-00050-0180 |
| SCREEN PORCH (SOLID ROOF) : 851 sqft |
| PATIO/DECK (NO ROOF) : 216 sqft |
| Total Square Footage: 1067 sqft |
| Block: 00050 |
| Subdivision: 2190 - SECTION 3-COUNTRY CLUB COVE |
| Job Phone: 385-793-2815 |
| Location Address: 21 CLARENDON CT S |
| Type: BA - BUILDING ADDITION |
| Issue Date: 02/17/2026 |
| NOC: RECORDED |
| Applicant name: RUDOLF F WOHLFARTH |
| Owner: PO DEE JAY & CHRISTINE H&W |
|
Address 21 CLARENDON CT S PALM COAST, FL 32137 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤54,500.00 |
| Job Description: screen enclosure w/ solid elite roof w/ new concrete footers w/ paver walkway do |
| Type: CN |
Contractor
COURTESY SCREENING INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 350 171 BUNNELL , FL 32110 |
SCC131152889 (Exp: 08/31/2026) | 386-793-2815 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/11/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 06-11-26 TPOLACEK*** THE NEWEST FINAL SURVEY IS STILL MISSING THE 10' OFF SHOTS ON ADJOINING PROPERTIES TO DETERMINE IF THERE IS ANY NEGATIVE IMPACT. THERE ARE ALSO CONTRADICTING ARROWS TO SHOTS. ELEVATION SHOTS INDICATE DRAINAGE WILL FALL TO REAR AND ARROWS SHOW ALL DRAINAGE WILL FLOW TO THE STRUCTURE. ARROWS ARE NOT REQUIRED AND CAN BE REMOVED FROM THE SURVEY. PLEASE ADD 10' OFFSHOTS 6/1/2026 - PREVIOUS INSPECTION NOTES ** 06/01/26 YOUR FINAL SURVEY DOES NOT HAVE ANY ELEVATION NUMBERS AS REQUIRED THE DRAINAGE FOR THIS PROPERTY WAS NOT CAPTURED BY THE SURVEYOR. ** YOU NEED TO PROVIDE FFE OF THE NEW PAVER PATIO AND WALKWAY ** YOU ARE REQUIRED TO SHOW THERE IS POSITIVE FALL AWAY FROM THE STRUCTURE ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" **4) The elevations at 20-foot intervals along all property lines. There must be sufficient elevation shots to indicate the proposed drainage pattern.Section 300.01 B(4) V-15 ** "5) The interior elevations at no greater than a 20-foot grid. Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** 2) The elevations on all adjacent properties must be at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern- Section 300.01 D(2) V-17 ** 8) All hard elevations are to be expressed to nearest 0.01 foot, all soft/ground elevations may be expressed to the nearest 0.1 of a foot.Section 300.01 B(8) V-15 ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/01/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/01/26 YOUR FINAL SURVEY DOES NOT HAVE ANY ELEVATION NUMBERS AS REQUIRED THE DRAINAGE FOR THIS PROPERTY WAS NOT CAPTURED BY THE SURVEYOR. ** YOU NEED TO PROVIDE FFE OF THE NEW PAVER PATIO AND WALKWAY ** YOU ARE REQUIRED TO SHOW THERE IS POSITIVE FALL AWAY FROM THE STRUCTURE ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" **4) The elevations at 20-foot intervals along all property lines. There must be sufficient elevation shots to indicate the proposed drainage pattern.Section 300.01 B(4) V-15 ** "5) The interior elevations at no greater than a 20-foot grid. Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** 2) The elevations on all adjacent properties must be at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern- Section 300.01 D(2) V-17 ** 8) All hard elevations are to be expressed to nearest 0.01 foot, all soft/ground elevations may be expressed to the nearest 0.1 of a foot.Section 300.01 B(8) V-15 ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| MONOLITHIC SLAB | 03/12/2026 | APPROVED | MCONTRYMAN |
| BLD - BUILDING FINAL | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| Note: 6/11/2026 - PREVIOUS INSPECTION NOTES 06-11-26 TPOLACEK*** THE NEWEST FINAL SURVEY IS STILL MISSING THE 10' OFF SHOTS ON ADJOINING PROPERTIES TO DETERMINE IF THERE IS ANY NEGATIVE IMPACT. THERE ARE ALSO CONTRADICTING ARROWS TO SHOTS. ELEVATION SHOTS INDICATE DRAINAGE WILL FALL TO REAR AND ARROWS SHOW ALL DRAINAGE WILL FLOW TO THE STRUCTURE. ARROWS ARE NOT REQUIRED AND CAN BE REMOVED FROM THE SURVEY. PLEASE ADD 10' OFFSHOTS 6/1/2026 - PREVIOUS INSPECTION NOTES ** 06/01/26 YOUR FINAL SURVEY DOES NOT HAVE ANY ELEVATION NUMBERS AS REQUIRED THE DRAINAGE FOR THIS PROPERTY WAS NOT CAPTURED BY THE SURVEYOR. ** YOU NEED TO PROVIDE FFE OF THE NEW PAVER PATIO AND WALKWAY ** YOU ARE REQUIRED TO SHOW THERE IS POSITIVE FALL AWAY FROM THE STRUCTURE ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" **4) The elevations at 20-foot intervals along all property lines. There must be sufficient elevation shots to indicate the proposed drainage pattern.Section 300.01 B(4) V-15 ** "5) The interior elevations at no greater than a 20-foot grid. Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** 2) The elevations on all adjacent properties must be at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern- Section 300.01 D(2) V-17 ** 8) All hard elevations are to be expressed to nearest 0.01 foot, all soft/ground elevations may be expressed to the nearest 0.1 of a foot.Section 300.01 B(8) V-15 ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/31/2026 | 03/31/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 03/23/2026 | 03/26/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/23/2026 | 03/24/2026 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan missing width of paver walkway. | |||
| BLD | COMPLETE | 02/11/2026 | 02/17/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 02/05/2026 | 02/05/2026 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan and FEMA FIRMs, the addition will not fall inside the SFHA. | |||
| BLD | HOLD | 02/04/2026 | 02/09/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please add landings to site plan as per FBCR 311.3 | |||
| ELEC | CANCEL | 02/04/2026 | 02/09/2026 |
| ENGIN1 | COMPLETE | 02/04/2026 | 02/11/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/04/2026 | 02/06/2026 |
| MECH | CANCEL | 02/04/2026 | 02/06/2026 |
| PLUM | CANCEL | 02/04/2026 | 02/06/2026 |
| RSI | COMPLETE | 02/04/2026 | 02/11/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THIS PERMIT NEEDED A FINAL SURVEY DUE TO PATIO IS 300SQFT OR GREATER | |||
| ZON | COMPLETE | 02/04/2026 | 02/05/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Zoning implementation: Rolled roofing or shingles to match the house is needed for low pitched roofs in salt water canal or facing the right of way. Please adjust plans accordingly. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/17/2026 |
| INSPECTION - RESIDENTIAL | ¤206.25 | 02/17/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 02/17/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 02/17/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 02/17/2026 |
| SURCHARGE FS 533.721 | ¤3.01 | 02/17/2026 |
| SURCHARGE - FS 468.631 | ¤4.52 | 02/17/2026 |
| SITE PLAN 30 | ¤30.00 | 02/17/2026 |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤35.00 | Total Paid: ¤403.78 |