Permit #2026020175
Permit Details
Status: INSPECT
| Parcel Id: 28-10-30-4240-00000-0460 |
| CONDITIONED SPACE: 2078 sqft |
| GARAGE: 477 sqft |
| OPENED PORCH (WITH ROOF) : 38 sqft |
| Total Square Footage: 2593 sqft |
| Subdivision: 2327 - MATANZAS COVE SUBDIVISION |
| Job Phone: 386-445-9009 |
| Location Address: 21 MATANZAS COVE DR |
| Type: BR55 - BUILDING RESIDENTIAL 55+ |
| Issue Date: 02/20/2026 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: MATANZAS COVE LLC |
|
Address 185 CYPRESS POINT PKWY PALM COAST, FL 32164 |
| Lot: 46 |
| Contracted Stated Job Value: ¤254,060.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC - EARLY POWER | 06/08/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email | |||
| ROW- PRE-APRON (PRE-POUR) | 05/28/2026 | APPROVED | TPOLACEK |
| Note: READY FOR PAVERS, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/20/2026 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 05/20/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/20/2026 | PARTIALLY APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| GRAVITY SEWER TEST | 05/12/2026 | APPROVED | JSTEWART |
| Note: Onsite inspection. | |||
| SEWER TIE IN | 05/12/2026 | APPROVED | JSTEWART |
| Note: Onsite inspection. | |||
| DRYWALL NAILING | 05/01/2026 | APPROVED | MCONTRYMAN |
| Note: 4/30/2026 - PREVIOUS INSPECTION NOTES Front porch gypsum fasteners appear to be standard screws, required to be corrosian resistant (high Humidity / Moisture location) 2508.2 Limitations. / ASTM C1280 | |||
| DRYWALL NAILING | 04/30/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Front porch gypsum fasteners appear to be standard screws, required to be corrosian resistant (high Humidity / Moisture location) 2508.2 Limitations. / ASTM C1280 | |||
| INSULATION | 04/28/2026 | APPROVED | KSANDOE |
| ALL ROUGH | 04/24/2026 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 04/24/2026 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 04/14/2026 | APPROVED | JSTEWART |
| WALL SHEATHING | 04/07/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/07/2026 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 03/24/2026 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 03/13/2026 | APPROVED | KSANDOE |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/10/2026 | APPROVED | LRAYBURN |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/10/2026 | APPROVED | KSANDOE |
| Note: *** NOTES ADDED BY KSANDOE 3/10/2026 11:14:18 AM *** Checked supply | |||
| WATER METER INSTALLATION REQUEST | 02/27/2026 | ||
| U-CROSS CONNECTION | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - STORMWATER FINAL | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| FINAL LOT GRADING & DRAINAGE CERTIFICATE | |||
| BLD - BUILDING FINAL | |||
| FINAL LOT GRADING/DRAINAGE CERTIFICATE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/14/2026 | 04/15/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/09/2026 | 03/10/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/09/2026 | 03/10/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/27/2026 | 02/27/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/16/2026 | 02/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/16/2026 | 02/17/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2026 | 02/18/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/05/2026 | 02/10/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/05/2026 | 02/13/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/05/2026 | 02/09/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/05/2026 | 02/05/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/05/2026 | 02/09/2026 |
| LOCATE | COMPLETE | 02/05/2026 | 02/10/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | HOLD | 02/05/2026 | 02/10/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide state card | |||
| RSI | CANCEL | 02/05/2026 | 02/05/2026 |
| SW1 | HOLD | 02/05/2026 | 02/11/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please provide appoved proposed elevation for vacant lots - Please provide on-site benchmark | |||
| ZON | COMPLETE | 02/05/2026 | 02/06/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 02/05/2026 | 02/05/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 02/20/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/20/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/20/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 02/20/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 02/20/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 02/20/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 02/20/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 02/20/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 02/20/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 02/20/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 02/20/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 02/20/2026 |
| SURCHARGE FS 533.721 | ¤14.10 | 02/20/2026 |
| SURCHARGE - FS 468.631 | ¤21.15 | 02/20/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 02/20/2026 |
| TRANSP SENIOR IMPACT FEE 10-25 | ¤7,295.86 | 02/20/2026 |
| WASTEWATER PERM INSPECTION | ¤40.00 | 02/20/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 02/20/2026 |
| SEWER CAPITAL FACILITY | ¤989.14 | 02/20/2026 |
| WATER CAPITAL FACILITY FEE | ¤684.54 | 02/20/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 02/20/2026 |
| SITE PLAN 30 | ¤30.00 | 02/20/2026 |
| WATER- TURN ON | ¤50.00 | 02/20/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/20/2026 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 02/20/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 02/20/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤16,655.30 |