I want to search for...
Permit #2026020190
Permit Details
Status: INSPECT
| Parcel Id: 20-12-31-5562-00000-1830 |
| CONDITIONED SPACE: 1962 sqft |
| GARAGE: 514 sqft |
| OPENED PORCH (WITH ROOF) : 281 sqft |
| Total Square Footage: 2757 sqft |
| Subdivision: 2362 - SEMINOLE PALMS SUBDIVISION PHASE 2 |
| Job Phone: 904-422-5276 |
| Location Address: 320 FISHTAIL PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/17/2026 |
| NOC: RECORDED |
| Applicant name: MATTHEW JAMES HENSON |
| Owner: PULTE HOME COMPANY LLC |
|
Address 12724 GRAN BAY PARKWAY WEST JACKSONVILLE, FL 32258 |
|
Address SUITE 200 JACKSONVILLE, FL 32258 |
| Lot: 183 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PULTE HOME COMPANY LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
12724 GRAN BAY DRIVE PKWAY W , |
SUITE 140 JACKSONVILLE, FL 32258 |
CGC1514865 (Exp: 08/31/2026) | 904-422-5276 |
Sub Contractors
PHILLIP F GABY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 56726 JACKSONVILLE, FL 32256 |
CCC1330190 (Exp: 08/31/2026) | 904-424-4665 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PRE-APRON (PRE-POUR) | 06/05/2026 | APPROVED | FSLADISH |
| Note: 6/5/26 PREPOUR NOW MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION PREPOUR AREA IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD REMOVE ALL WATER AND CHECK COMPACTION BEFORE POURING CONCRETE. 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED IS REQUIRED. PLEASE REVIEW CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. NO EXPANSION JOINTS ALLOWED. ______________________________________________________________________________________________________________________________ 6/4/2026 - PREVIOUS INSPECTION NOTES 6/4/26 THIS IS NEWER BUILDER AND AS A COURTESY WENT OVER THE COPC REQUIREMENTS FOR SUBDIVISION NO CULVERT DRIVEWAYS, AS THE DRIVEWAY PREPOUR DID NOT MEET COPC STANDARDS AT THE TIME OF THIS INSPECTION. I LET CM KNOW THAT I WOULD CANCEL THIS PREPOUR AS A ONE TIME COURTESY AND TO RESUBMIT OR CALL FOR ASSISTANCE SHOULD THEY REQUIRE IT BEFORE RESUBMITTING FOR INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 06/04/2026 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 6/4/26 THIS IS NEWER BUILDER AND AS A COURTESY WENT OVER THE COPC REQUIREMENTS FOR SUBDIVISION NO CULVERT DRIVEWAYS, AS THE DRIVEWAY PREPOUR DID NOT MEET COPC STANDARDS AT THE TIME OF THIS INSPECTION. I LET CM KNOW THAT I WOULD CANCEL THIS PREPOUR AS A ONE TIME COURTESY AND TO RESUBMIT OR CALL FOR ASSISTANCE SHOULD THEY REQUIRE IT BEFORE RESUBMITTING FOR INSPECTION | |||
| DRYWALL NAILING | 06/01/2026 | APPROVED | RSIMS |
| GRAVITY SEWER TEST | 06/01/2026 | APPROVED | RSIMS |
| Note: Approved on site. | |||
| SEWER TIE IN | 06/01/2026 | APPROVED | RSIMS |
| Note: Approved on site. | |||
| SEWER TIE IN | 05/29/2026 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 05/29/2026 | CANCELLED BY APPLICANT | WEB |
| GRAVITY SEWER TEST | 05/29/2026 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 05/27/2026 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2420 5/19/26: Check at Insulation Inspection. 1). Phase out wires in breaker panel. Water heater and ODU. NEC 200.6(B) 2). Missing 5ftg head pressure. FBC-P2503.5.1 Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS - 4/13/26. | |||
| LATH/BRICK/ WATER BARRIER | 05/19/2026 | APPROVED | RSIMS |
| ALL ROUGH | 05/19/2026 | APPROVED - AS NOTED | RSIMS |
| Note: 5/19/26: Check at Insulation Inspection. 1). Phase out wires in breaker panel. Water heater and ODU. NEC 200.6(B) 2). Missing 5ftg head pressure. FBC-P2503.5.1 Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS - 4/13/26. | |||
| ROOF VALLEY & METAL | 05/06/2026 | APPROVED | KSANDOE |
| WALL SHEATHING | 05/01/2026 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/01/2026 | APPROVED | RSIMS |
| MONOLITHIC SLAB | 04/16/2026 | APPROVED | RSIMS |
| Note: 4/15/2026 - PREVIOUS INSPECTION NOTES Clear minor cave in near back porch. Ensure proper clearance of steel to earth R404.1.3.3.7.4 Support and cover. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches. | |||
| MONOLITHIC SLAB | 04/15/2026 | Disapproved - NO FEE | KSANDOE |
| Note: Clear minor cave in near back porch. Ensure proper clearance of steel to earth R404.1.3.3.7.4 Support and cover. Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/13/2026 | APPROVED | RSIMS |
| Note: 4/13/26: NOTE: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS 4/9/2026 - PREVIOUS INSPECTION NOTES 4/9/26: Rain has caused significant dirt cave in preventing completion of the inspection. Please expose drain lines and water lines so that the required inspection can be completed. FBC-[A] 110.1 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/09/2026 | Disapproved - NO FEE | RSIMS |
| Note: 4/9/26: Rain has caused significant dirt cave in preventing completion of the inspection. Please expose drain lines and water lines so that the required inspection can be completed. FBC-[A] 110.1 | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/08/2026 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 04/01/2026 | APPROVED | ISANDERSON |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| BLD - BUILDING FINAL | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/08/2026 | 04/08/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/08/2026 | 04/08/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2026 | 04/01/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/30/2026 | 03/30/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/09/2026 | 03/10/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/09/2026 | 03/16/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/27/2026 | 02/27/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide a site planits missing with the correct rear setbacks | |||
| BLD | COMPLETE | 02/27/2026 | 03/05/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/05/2026 | 02/10/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Roofing Worksheet FL# 1932.1 not valid | |||
| CUSVC | COMPLETE | 02/05/2026 | 02/13/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/05/2026 | 02/09/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/05/2026 | 02/06/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/05/2026 | 02/09/2026 |
| LOCATE | COMPLETE | 02/05/2026 | 02/11/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/05/2026 | 02/10/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/05/2026 | 02/11/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| ZON | HOLD | 02/05/2026 | 02/09/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation plan: please label the elevation sides on the plans correctly. | |||
| URB | COMPLETE | 02/05/2026 | 02/09/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤874.47 | 03/17/2026 |
| WATER- TURN ON | ¤50.00 | 03/17/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/17/2026 |
| INSPECTION - RESIDENTIAL | ¤1,075.25 | 03/17/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤304.98 | 03/17/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 03/17/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/17/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/17/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/17/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 03/17/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/17/2026 |
| RECLAIM WATER PERMIT INSPECTIO | ¤40.00 | 03/17/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/17/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/17/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/17/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/17/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/17/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/17/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/17/2026 |
| SURCHARGE FS 533.721 | ¤14.10 | 03/17/2026 |
| SURCHARGE - FS 468.631 | ¤21.15 | 03/17/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,396.74 | 03/17/2026 |
| TRANSP RES IMPACT FEE 10-25 | (¤7,396.74) | 03/17/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/17/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/17/2026 |
| SEWER CAPITAL FACILITY | ¤2,368.69 | 03/17/2026 |
| WATER CAPITAL FACILITY FEE | ¤1,744.18 | 03/17/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/17/2026 |
| SITE PLAN 30 | ¤30.00 | 03/17/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,529.35 |