Permit #2026020278
Permit Details
Status: FINAL
| Parcel Id: 03-12-31-1125-00000-1060 |
| Subdivision: 2112 - COLBERT LANDINGS PH 1 |
| Job Phone: 386-898-3419 |
| Location Address: 22 ARARAT DR |
| Type: DR - DRIVEWAY |
| Issue Date: 02/26/2026 |
| NOC: Unknown |
| Applicant name: PAULO JM DOS SANTOS |
| Owner: BAYER JOHANNES KONRAD & ULRIKE H&W |
|
Address 22 ARARAT DRIVA PALM COAST, FL 32137 |
| Lot: 106 |
| Contracted Stated Job Value: ¤2,000.00 |
| Job Description: Extend both sides 3' of existing paver driveway with pavers. |
| Type: CN |
Contractor
C & P CONCRETE INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
1 WESTROCK LANE PALM COAST, FL 32164 |
386-898-3419 | 386-446-9206 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 03/24/2026 | APPROVED | FSLADISH |
| Note: 3/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 03/24/2026 | APPROVED | FSLADISH |
| Note: 3/24/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/24/2026 | FINAL APPROVED | BHAINES |
| ROW- PRE-APRON (PRE-POUR) | 03/04/2026 | APPROVED | FSLADISH |
| Note: 3/4/26 YOU ARE APPROVED TO LAY PAVERS AS OF THIS INSPECTION. _____________________________________________________________________________________________________________________________ 3/2/2026 - PREVIOUS INSPECTION NOTES 3/2/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 03/02/2026 | APPROVED | FSLADISH |
| Note: 3/2/26 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/02/2026 | PARTIALLY APPROVED | FSLADISH |
| Note: 3/2/26 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 02/12/2026 | 02/12/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/09/2026 | 02/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 02/09/2026 | 02/11/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM MUST HAVE A FOOTER ALONG OUT SIDE EDGE OF DRIVEWAY MINIMUM 4"X8" FOR PAVER FOOTER. | |||
| UTL | COMPLETE | 02/09/2026 | 02/09/2026 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/09/2026 | 02/09/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Provide a right of way agreement: Please have the owners on the deed sign and notarize a Right of way agreement exactly as the deed reads. Please use the new form I emailed to you directly as it was recently updated. There are three pages to this document. Once completed please submit through the portal first for review, once approved I will request the originals be brought to our office for processing. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/26/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 02/26/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 02/26/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 02/26/2026 |
| RSI SITE PLAN REVIEW | ¤16.25 | 02/26/2026 |
| SITE PLAN 15 | ¤15.00 | 02/26/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤126.25 |