Permit #2026020351

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7025-00150-0360
CONDITIONED SPACE: 2067 sqft
GARAGE: 597 sqft
OPENED PORCH (WITH ROOF) : 157 sqft
Total Square Footage: 2821 sqft
Block: 00150
Subdivision: 2189 - SECTION 25-PINE GROVE
Job Phone: 407-476-8195
Location Address: 14 PERROTTI LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/01/2026
NOC: RECORDED
Applicant name: CARLETTE RENE WITTE
Owner: INB BFS LAND LLC

Address

7380 WEST SAND LAKE ROAD

ORLANDO, FL 32819

Address

SUITE 600

ORLANDO, FL 32819

Lot: 0360
Contracted Stated Job Value: ¤250,000.00
Job Description: Construction of New SFR
Type: CN

Contractor

INNOVATIVE NATIONWIDE BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD #220

,

CRC1330026 (Exp: 08/31/2026) 855-694-6634

Sub Contractors

JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
TIE BEAM / LINTEL 06/10/2026 APPROVED HCAMACHO
MONOLITHIC SLAB 05/28/2026 APPROVED JSTEWART
PLUMBING 1ST ROUGH UNDERGROUND 05/26/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/26/2026 10:48:24 AM *** 5/26/26: 1). Need portable toilet on site prior to next inspection. FBCR-P311.1 NOTE: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS Inspector Notes from Inspection 2075 *** NOTES ADDED BY RSIMS 5/22/2026 9:49:55 AM *** 5/22/26: NOTE: The gravity sewer test piping ends @ 25ft from the front property marker ( or @ 42ft from the blacktop street edge / 6ft back from house front). *** The trench from the connection at that point through the Sewer tie in connection will need to remain exposed for Inspection 2095
GRAVITY SEWER TEST 05/22/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/22/2026 9:49:55 AM *** 5/22/26: NOTE: The gravity sewer test piping ends @ 25ft from the front property marker ( or @ 42ft from the blacktop street edge / 6ft back from house front). *** The trench from the connection at that point through the Sewer tie in connection will need to remain exposed for Inspection 2095
FORMBOARD SURVEY (OFFICE USE ONLY) 05/22/2026 APPROVED PFLANAGAN
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/18/2026 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 05/01/2026 APPROVED ISANDERSON
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
LATH/BRICK/ WATER BARRIER
SEWER TIE IN
Note: 5/22/26: NOTE: The gravity sewer test piping ends @ 25ft from the front property marker ( or @ 42ft from the blacktop street edge / 6ft back from house front). *** The trench from the connection at that point through the Sewer tie in connection will need to remain exposed for Inspection 2095
ELECTRIC - EARLY POWER
ALL ROUGH
Note: 5/26/26: Main underground water service piping is installed from house to meter valve (meter installed). Inspected and approved. RS
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
DRYWALL NAILING
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/21/2026 05/22/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/21/2026 05/21/2026
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 05/18/2026 05/18/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
MECH COMPLETE 02/24/2026 02/25/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 02/24/2026 02/25/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 02/24/2026 02/27/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 02/24/2026 03/02/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 02/24/2026 03/02/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 02/11/2026 02/19/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD COMPLETE 02/10/2026 02/17/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 02/10/2026 02/19/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 02/10/2026 02/17/2026
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need proper counter top outlet spacing to left of the stove. NEC 2020 210.52 (B)
ENGIN1 COMPLETE 02/10/2026 02/11/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 02/10/2026 02/12/2026
LOCATE COMPLETE 02/10/2026 02/17/2026
Note: Released By: IVAN SANDERSON - -
MECH HOLD 02/10/2026 02/12/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location heatload needs to be Daytona Beach
SW1 COMPLETE 02/10/2026 02/13/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 02/10/2026 02/13/2026
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the width and material of walkway on site plan Cannot have an office in a single family residence. Please change to a study or den Front corners must be wrapped with foundation plantings

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 04/01/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/01/2026
INSPECTION - RESIDENTIAL ¤1,116.50 04/01/2026
PLAN REVIEW - RESIDENTIAL ¤316.68 04/01/2026
FC IMPACT FEE EMS ¤62.00 04/01/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/01/2026
FC IMPACT FEE LIBRARY ¤268.00 04/01/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 04/01/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 04/01/2026
RSI DRIVEWAY AFTER POUR ¤16.25 04/01/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 04/01/2026
RSI FIELD SURVEY INSPECTION ¤48.75 04/01/2026
RSI FORMBOARD REVIEW ¤16.25 04/01/2026
RSI PLAN REVIEW NEW ¤48.75 04/01/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 04/01/2026
RSI ROW FINAL INSPECTION ¤16.25 04/01/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 04/01/2026
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 04/01/2026
SURCHARGE FS 533.721 ¤14.63 04/01/2026
SURCHARGE - FS 468.631 ¤21.95 04/01/2026
SW ENG RES REVIEW 240 ¤240.00 04/01/2026
WATER METER W/ TAP ¤2,326.93 04/01/2026
TRANSP RES IMPACT FEE 10-25 ¤7,792.59 04/01/2026
SEWER CREDIT (¤958.00) 04/01/2026
WASTEWATER PERM INSPECTION ¤80.00 04/01/2026
WASTEWATER PERM REVIEW ¤25.00 04/01/2026
SEWER CAPITAL FACILITY ¤4,415.00 04/01/2026
WATER CAPITAL FACILITY FEE ¤3,790.49 04/01/2026
WATER PERMIT REVIEW ¤25.00 04/01/2026
WATER MAIN EXTENSION IMPACT ¤917.27 04/01/2026
SITE PLAN 30 ¤30.00 04/01/2026
Fees Total Due: ¤0.00 Total Paid: ¤32,950.54