Permit #2026020377
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7011-00070-0300 |
| CONDITIONED SPACE: 1615 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| Total Square Footage: 2110 sqft |
| Block: 00070 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 407-476-8195 |
| Location Address: 30 BECKNER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/02/2026 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LAND LLC |
|
Address 7380 WEST SAND LAKE ROAD ORLANDO, FL 32819 |
|
Address SUITE 600 ORLANDO, FL 32819 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/27/2026 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2450 FBC 3302.2 NEEDS DUMPSTER | |||
| ROOF VALLEY & METAL | 05/27/2026 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2450 FBC 3302.2 NEEDS DUMPSTER | |||
| ROOF SHEATHING | 05/21/2026 | APPROVED | HCAMACHO |
| WALL SHEATHING | 05/21/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: FBC 3302.2 NEEDS DUMPSTER | |||
| TIE BEAM / LINTEL | 05/06/2026 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 04/28/2026 | APPROVED | JSTEWART |
| Note: New inspection due to canceled inspection 4/24/2026 - PREVIOUS INSPECTION NOTES Garage area slab appears to contain excess vegetation which calls to question the entire slab area. R506.2 Site preparation. The area within the foundation walls shall have all vegetation, top soil and foreign material removed. R506.2.1Fill material shall be free of vegetation and foreign material. Clear cave in areas and ensure 3' minimum required coverage for steel throughout | |||
| MONOLITHIC SLAB | 04/27/2026 | CANCELLED BY APPLICANT | WEB |
| Note: 4/24/2026 - PREVIOUS INSPECTION NOTES Garage area slab appears to contain excess vegetation which calls to question the entire slab area. R506.2 Site preparation. The area within the foundation walls shall have all vegetation, top soil and foreign material removed. R506.2.1Fill material shall be free of vegetation and foreign material. Clear cave in areas and ensure 3' minimum required coverage for steel throughout | |||
| SEWER TIE IN | 04/27/2026 | APPROVED - AS NOTED | RSIMS |
| Note: Inspection completed previously on 4/23/26: Virtually approved via FaceTime video/audio phone app at @ 1438. 4/24/2026 - PREVIOUS INSPECTION NOTES Connection is underwater. Please pump out and reschedule a virtual inspection when workers are on site. Inspector Notes from Inspection 2060 1. There are allot of roots/vegetation in the garage area. The dirt needs to be clean fill. Will look at Monoslab. FBC R318.6.2 REMOVE ALL VEGETATION | |||
| MONOLITHIC SLAB | 04/24/2026 | Disapproved - NO FEE | KSANDOE |
| Note: Garage area slab appears to contain excess vegetation which calls to question the entire slab area. R506.2 Site preparation. The area within the foundation walls shall have all vegetation, top soil and foreign material removed. R506.2.1Fill material shall be free of vegetation and foreign material. Clear cave in areas and ensure 3' minimum required coverage for steel throughout | |||
| GRAVITY SEWER TEST | 04/24/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/23/2026 3:36:17 PM *** 4/23/26: Virtually approved via FaceTime video/audio phone app at @ 1438 Inspector Notes from Inspection 2060 1. There are allot of roots/vegetation in the garage area. The dirt needs to be clean fill. Will look at Monoslab. FBC R318.6.2 REMOVE ALL VEGETATION | |||
| SEWER TIE IN | 04/24/2026 | Disapproved - NO FEE | KSANDOE |
| Note: Connection is underwater. Please pump out and reschedule a virtual inspection when workers are on site. Inspector Notes from Inspection 2060 1. There are allot of roots/vegetation in the garage area. The dirt needs to be clean fill. Will look at Monoslab. FBC R318.6.2 REMOVE ALL VEGETATION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/17/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. There are allot of roots/vegetation in the garage area. The dirt needs to be clean fill. Will look at Monoslab. FBC R318.6.2 REMOVE ALL VEGETATION | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/14/2026 | APPROVED | PFLANAGAN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/13/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 04/01/2026 | APPROVED | ISANDERSON |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL | |||
| ELECTRIC - EARLY POWER | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/13/2026 | 04/13/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/13/2026 | 04/14/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/13/2026 | 04/13/2026 |
| Note: Released By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/11/2026 | 02/18/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/11/2026 | 02/19/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/11/2026 | 02/17/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/11/2026 | 02/11/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/11/2026 | 02/13/2026 |
| LOCATE | COMPLETE | 02/11/2026 | 02/17/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/11/2026 | 02/13/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/11/2026 | 02/13/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/11/2026 | 02/12/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/11/2026 | 02/23/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 03/02/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/02/2026 |
| INSPECTION - RESIDENTIAL | ¤855.25 | 03/02/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤242.58 | 03/02/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 03/02/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/02/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/02/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/02/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/02/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/02/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/02/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/02/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/02/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/02/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/02/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/02/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/02/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/02/2026 |
| SURCHARGE FS 533.721 | ¤11.28 | 03/02/2026 |
| SURCHARGE - FS 468.631 | ¤16.92 | 03/02/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/02/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/02/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,088.55 | 03/02/2026 |
| SEWER CREDIT | (¤1,147.00) | 03/02/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/02/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/02/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/02/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/02/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/02/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/02/2026 |
| SITE PLAN 30 | ¤30.00 | 03/02/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,713.77 |