Permit #2026020457
Permit Details
Status: INSPECT
| Parcel Id: 04-11-30-5570-00000-2660 |
| CONDITIONED SPACE: 2239 sqft |
| GARAGE: 416 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| OPENED PORCH (WITH ROOF) : 130 sqft |
| Total Square Footage: 2845 sqft |
| Subdivision: 2326 - SOMERSET SUBDIVISION PH 1 |
| Job Phone: 904-596-6645 |
| Location Address: 15 TEA OLIVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/12/2026 |
| NOC: RECORDED |
| Applicant name: MICHAEL T HOLDER |
| Owner: KB HOME JACKSONVILLE LLC |
|
Address 10475 FORTUNE PARKWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 100 JACKSONVILLE, FL 32256 |
| Lot: 266 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: NEW SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
KB HOME JACKSONVILLE, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
10475 FORTUNE PKWY JACKSONVILLE, FL 32256 |
SUITE 100 JACKSONVILLE, FL 32256 |
CGC1509034 (Exp: 08/31/2026) | 904-596-6645 |
Sub Contractors
BOBBY WAYNE CAMPBELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
117 GUTHRIE ROAD GREEN COVE SPRINGS, FL 32043 |
CCC1326752 (Exp: 08/31/2026) | 904-200-1600 |
LARRY WILLIAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1750 EMERSON ST JACKSONVILLE, FL 32207 |
LI45034 (Exp: 08/31/2026) | 904-721-5431 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
COREY MICHAEL TENNANT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3370 AGRICULTURAL CNETER DR ST AUGUSTINE, FL 32092 |
CAC1819063 (Exp: 08/31/2026) | 904-829-8898 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/12/2026 | JSTEWART | |
| U-CROSS CONNECTION | 06/03/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No CC. IRR with reuse water. | |||
| ELECTRIC - EARLY POWER | 06/03/2026 | APPROVED | JSTEWART |
| Note: 5/29/2026 - PREVIOUS INSPECTION NOTES Not ready, trim out not started. Inspector Notes from Inspection 2200 Authorize release of email | |||
| ELECTRIC - EARLY POWER | 05/29/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Not ready, trim out not started. Inspector Notes from Inspection 2200 Authorize release of email | |||
| ROW- PRE-APRON (PRE-POUR) | 05/19/2026 | APPROVED | PFLANAGAN |
| Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| DRYWALL NAILING | 05/04/2026 | APPROVED | JSTEWART |
| INSULATION | 05/01/2026 | APPROVED | JSTEWART |
| Note: 4/30/2026 - PREVIOUS INSPECTION NOTES Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 ****(on the right side 16 of 29 spaces, on the left side12 out of 26 spaces do not meet the min of 1"). 4/29/2026 - PREVIOUS INSPECTION NOTES 4/27/2026 - PREVIOUS INSPECTION NOTES Previous Notes not rectified.....insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Roof sheathing and ties inspection.....See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.)......****Please refer to Plans Detail A pg S4 (one of the braces is to a jack truss needs to be fastened to the bottom chord of the gable truss, and only 2 installed****** 4/24/2026 - PREVIOUS INSPECTION NOTES Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. (FBCR M1601.4.1) 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). (FBCR P2605.1) **All will need repaired prior to insulation inspection approval. Insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Inspector Notes from Inspection 2420 Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 1. No water preassure test. 2. 5ft head test is empty. 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). **All will need repaired prior to insulation inspection approval. | |||
| INSULATION | 04/30/2026 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 ****(on the right side 16 of 29 spaces, on the left side12 out of 26 spaces do not meet the min of 1"). 4/29/2026 - PREVIOUS INSPECTION NOTES 4/27/2026 - PREVIOUS INSPECTION NOTES Previous Notes not rectified.....insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Roof sheathing and ties inspection.....See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.)......****Please refer to Plans Detail A pg S4 (one of the braces is to a jack truss needs to be fastened to the bottom chord of the gable truss, and only 2 installed****** 4/24/2026 - PREVIOUS INSPECTION NOTES Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. (FBCR M1601.4.1) 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). (FBCR P2605.1) **All will need repaired prior to insulation inspection approval. Insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Inspector Notes from Inspection 2420 Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 1. No water preassure test. 2. 5ft head test is empty. 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). **All will need repaired prior to insulation inspection approval. | |||
| INSULATION | 04/29/2026 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 4/27/2026 - PREVIOUS INSPECTION NOTES Previous Notes not rectified.....insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Roof sheathing and ties inspection.....See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.)......****Please refer to Plans Detail A pg S4 (one of the braces is to a jack truss needs to be fastened to the bottom chord of the gable truss, and only 2 installed****** 4/24/2026 - PREVIOUS INSPECTION NOTES Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. (FBCR M1601.4.1) 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). (FBCR P2605.1) **All will need repaired prior to insulation inspection approval. Insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Inspector Notes from Inspection 2420 Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 1. No water preassure test. 2. 5ft head test is empty. 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). **All will need repaired prior to insulation inspection approval. | |||
| LATH/BRICK/ WATER BARRIER | 04/29/2026 | APPROVED | JSTEWART |
| INSULATION | 04/27/2026 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Previous Notes not rectified.....insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Roof sheathing and ties inspection.....See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.)......****Please refer to Plans Detail A pg S4 (one of the braces is to a jack truss needs to be fastened to the bottom chord of the gable truss, and only 2 installed****** 4/24/2026 - PREVIOUS INSPECTION NOTES Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. (FBCR M1601.4.1) 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). (FBCR P2605.1) **All will need repaired prior to insulation inspection approval. Insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Inspector Notes from Inspection 2420 Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 1. No water preassure test. 2. 5ft head test is empty. 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). **All will need repaired prior to insulation inspection approval. | |||
| INSULATION | 04/24/2026 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. (FBCR M1601.4.1) 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). (FBCR P2605.1) **All will need repaired prior to insulation inspection approval. Insulation inspection: Please repair Air baffles, baffles are blocking the flow of air at the eave, required min 1" clearence from roof deck. FBC R806.3 Inspector Notes from Inspection 2420 Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 1. No water preassure test. 2. 5ft head test is empty. 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). **All will need repaired prior to insulation inspection approval. | |||
| ELECTRIC-TUG | 04/24/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email | |||
| ALL ROUGH | 04/21/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Previous Note not rectified..... See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* (only 2 diagonal braces installed plan calls for 3, and the 2 installed are to the shadow gable bottom chord, per detail should be to the exterior gable with the shed roof attached. also blocking at roof panel edges missing per detail.) 1. No water preassure test. 2. 5ft head test is empty. 3. need to install mechanical fasteners at bath exhaust duct to fan assembly. 4. Hose Bibb plumbing in master bedroom exterior wall needs secured to framing member (currently conflicting with a receptacle outlet). **All will need repaired prior to insulation inspection approval. | |||
| WALL SHEATHING | 04/20/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2250 Footing from FF to soil is set at 26", to maintain 12" below finish grade. Based off of Grade and drainage plan. 3/31/2026 - PREVIOUS INSPECTION NOTES According to the grade and drainage plan the Min depth of footing will require 24" from top of form board to maintain the required 12" below grade. footing is aproximate 20/21". R403.1.4 Minimum depth. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/20/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. See Gable End Detail A/S4, missing 2x4 blocking, Tbracing. *Will look at Rough Inspection.* Inspector Notes from Inspection 2250 Footing from FF to soil is set at 26", to maintain 12" below finish grade. Based off of Grade and drainage plan. 3/31/2026 - PREVIOUS INSPECTION NOTES According to the grade and drainage plan the Min depth of footing will require 24" from top of form board to maintain the required 12" below grade. footing is aproximate 20/21". R403.1.4 Minimum depth. | |||
| ROOF VALLEY & METAL | 04/20/2026 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2250 Footing from FF to soil is set at 26", to maintain 12" below finish grade. Based off of Grade and drainage plan. 3/31/2026 - PREVIOUS INSPECTION NOTES According to the grade and drainage plan the Min depth of footing will require 24" from top of form board to maintain the required 12" below grade. footing is aproximate 20/21". R403.1.4 Minimum depth. | |||
| GRAVITY SEWER TEST | 04/02/2026 | APPROVED | JSTEWART |
| Note: Main water line installed from house shut off to utility location, snubbed up. | |||
| SEWER TIE IN | 04/02/2026 | APPROVED | JSTEWART |
| Note: Main water line installed from house shut off to utility location, snubbed up. | |||
| MONOLITHIC SLAB | 04/01/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Footing from FF to soil is set at 26", to maintain 12" below finish grade. Based off of Grade and drainage plan. 3/31/2026 - PREVIOUS INSPECTION NOTES According to the grade and drainage plan the Min depth of footing will require 24" from top of form board to maintain the required 12" below grade. footing is aproximate 20/21". R403.1.4 Minimum depth. | |||
| MONOLITHIC SLAB | 03/31/2026 | Disapproved - NO FEE | JSTEWART |
| Note: According to the grade and drainage plan the Min depth of footing will require 24" from top of form board to maintain the required 12" below grade. footing is aproximate 20/21". R403.1.4 Minimum depth. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/25/2026 | APPROVED | JSTEWART |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/24/2026 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 03/24/2026 | APPROVED | ISANDERSON |
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/23/2026 | 03/24/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/23/2026 | 03/23/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/20/2026 | 03/23/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboard survey shall be signed and sealed. | |||
| ZON | COMPLETE | 03/20/2026 | 03/20/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/09/2026 | 03/10/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/06/2026 | 03/06/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Previous comment not addressed: - The FFE for both lots are not "Proposed". The adjacent lots have been COED and are no longer proposed. Please revise. Please feel free to call me if there are any questions or concerns. | |||
| SW1 | HOLD | 02/25/2026 | 02/25/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Both adjacent lots are COED these are not proposed elevations. There was a modification done in this subdivision without properly identifying what lots have already been COED.These two adjacent lots specifically have different proposed FFE's that does not match As-built conditions. Please ensure to capture the proper information the these grading plans, it can lead to hold and issues later if not done correctly. | |||
| ENGIN1 | COMPLETE | 02/25/2026 | 02/25/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/23/2026 | 02/25/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM No revised grading plan attached. Please submit revised grading plan addressing previous comments. | |||
| MECH | COMPLETE | 02/23/2026 | 02/24/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/23/2026 | 02/23/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/12/2026 | 02/19/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/12/2026 | 02/20/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/12/2026 | 02/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/12/2026 | 02/12/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 02/12/2026 | 02/17/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/12/2026 | 02/19/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | HOLD | 02/12/2026 | 02/17/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State card is page with preparers signature. Upload this page only. Use drop down menu state card and file name state card | |||
| SW1 | HOLD | 02/12/2026 | 02/17/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM A minimum 0.3' fall to the rear yard drainage swale is required at all correlating elevations. The proposed plan shows only 0.2' fall. Revise and resubmit to demonstrate compliance (= 0.3') to the rear yard drainage swale. | |||
| ZON | HOLD | 02/12/2026 | 02/18/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape 4 shrubs to wrap the corners of each side of the home and 8 along the front. Sod planted and if it will need irrigation | |||
| URB | COMPLETE | 02/12/2026 | 02/13/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/12/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/12/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/12/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/12/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 03/12/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/12/2026 |
| RECLAIM WATER PERMIT INSPECTIO | ¤40.00 | 03/12/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/12/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/12/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/12/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/12/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/12/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/12/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/12/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/12/2026 |
| SURCHARGE FS 533.721 | ¤15.30 | 03/12/2026 |
| SURCHARGE - FS 468.631 | ¤22.95 | 03/12/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤8,441.03 | 03/12/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/12/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/12/2026 |
| SEWER CAPITAL FACILITY | ¤3,737.90 | 03/12/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,161.82 | 03/12/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/12/2026 |
| SITE PLAN 30 | ¤30.00 | 03/12/2026 |
| WATER-METER | ¤874.47 | 03/12/2026 |
| WATER- TURN ON | ¤50.00 | 03/12/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/12/2026 |
| INSPECTION - RESIDENTIAL | ¤1,168.75 | 03/12/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤331.50 | 03/12/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤120.00 | Total Paid: ¤29,330.25 |