I want to search for...
Permit #2026020502
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7035-00270-0290 |
| CONDITIONED SPACE: 1849 sqft |
| OPENED PORCH (WITH ROOF) : 168 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| GARAGE: 480 sqft |
| Total Square Footage: 2577 sqft |
| Block: 00270 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 631-929-5500 |
| Location Address: 36 BURNSIDE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/10/2026 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: ASZ HOMES LLC |
|
Address 45 NEW YORK 25A SHOREHAM, NY 11786 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤170,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Inspection History
| Type | Request Date | Result | Inspector |
| DRYWALL NAILING | 06/09/2026 | APPROVED | JSTEWART |
| Note: 6/8/2026 - PREVIOUS INSPECTION NOTES 1. Porch Gypsum board requires Corrosian resistant fasteners (Standard drywall screws not approved). R702.3.1 Materials. 2. Please repair Butt Joint fasteners, required min 3/8" from seem. (multiple thru out are either breaking the edge or center of seam, which doesnt maintain fastening spaceing). FBC-R Table R702.3.5 | |||
| DRYWALL NAILING | 06/08/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Porch Gypsum board requires Corrosian resistant fasteners (Standard drywall screws not approved). R702.3.1 Materials. 2. Please repair Butt Joint fasteners, required min 3/8" from seem. (multiple thru out are either breaking the edge or center of seam, which doesnt maintain fastening spaceing). FBC-R Table R702.3.5 | |||
| U-CROSS CONNECTION | 06/08/2026 | APPROVED | BWRIGHT |
| PEP TANK INSTALLATION REQUEST | 06/05/2026 | APPROVED | ISANDERSON |
| INSULATION | 06/03/2026 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 1. Missing nail plates in master bath top plate. Marked. 2. Missing nail plate at top plate and outlet next to closet in back bedroom. Marked. See Plans. 3. Will need to check A/C layout because no A/C layout or Energy Calcs onsite. *Will check at Insulation. | |||
| LATH/BRICK/ WATER BARRIER | 05/27/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 1. Missing nail plates in master bath top plate. Marked. 2. Missing nail plate at top plate and outlet next to closet in back bedroom. Marked. See Plans. 3. Will need to check A/C layout because no A/C layout or Energy Calcs onsite. *Will check at Insulation. | |||
| ALL ROUGH | 05/26/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Missing nail plates in master bath top plate. Marked. 2. Missing nail plate at top plate and outlet next to closet in back bedroom. Marked. See Plans. 3. Will need to check A/C layout because no A/C layout or Energy Calcs onsite. *Will check at Insulation. | |||
| ELECTRIC-TUG | 05/22/2026 | APPROVED | RMARTIN |
| WALL SHEATHING | 05/15/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/15/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Please post address that is visible from the road. FBCR 319.1 | |||
| ROOF VALLEY & METAL | 05/15/2026 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 05/01/2026 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2250 It will be the responsibility of the Builder to maintain the 3" min Clearence of reinforcement from soil (wash outs/cave ins) before pour. (Weather at time of approval). 4/6/2026 - PREVIOUS INSPECTION NOTES FBC R318 NOTICE OF TERMITE INSPECTION/TREATMENT | |||
| MONOLITHIC SLAB | 04/07/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: It will be the responsibility of the Builder to maintain the 3" min Clearence of reinforcement from soil (wash outs/cave ins) before pour. (Weather at time of approval). 4/6/2026 - PREVIOUS INSPECTION NOTES FBC R318 NOTICE OF TERMITE INSPECTION/TREATMENT | |||
| MONOLITHIC SLAB | 04/06/2026 | Disapproved - NO FEE | JSTEWART |
| Note: FBC R318 NOTICE OF TERMITE INSPECTION/TREATMENT | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/01/2026 | APPROVED | JSTEWART |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/31/2026 | APPROVED | PFLANAGAN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/26/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/13/2026 | APPROVED | ISANDERSON |
| BLD - BUILDING FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/12/2026 | 05/13/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/12/2026 | 05/12/2026 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/08/2026 | 05/11/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Fees already paid on this permit and meter already installed. No additonal fees owed at this time. | |||
| SW1 | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/30/2026 | 03/30/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2026 | 03/26/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2026 | 02/24/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/17/2026 | 03/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/13/2026 | 02/18/2026 |
| LOCATE | COMPLETE | 02/13/2026 | 02/19/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: Driveway approval will based on inspector's pre-pour field inspection | |||
| ZON | HOLD | 02/13/2026 | 02/18/2026 |
| Note: Held By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM submit current color sheet . Link to sheet below: https://copc-strapi-production.s3.amazonaws.com/Color_and_Materials_Sheet_FILLABLE_Rev_9_2_25_12ba781d37.pdf banding missing from garage door |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/10/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/10/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/10/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/10/2026 |
| PEP TANK INSTALL | ¤756.74 | 03/10/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/10/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/10/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/10/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/10/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/10/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/10/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/10/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/10/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/10/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/10/2026 |
| SURCHARGE FS 533.721 | ¤13.26 | 03/10/2026 |
| SURCHARGE - FS 468.631 | ¤19.88 | 03/10/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/10/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/10/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,970.73 | 03/10/2026 |
| SEWER CREDIT | (¤1,342.00) | 03/10/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/10/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/10/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/10/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/10/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/10/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/10/2026 |
| SITE PLAN 30 | ¤30.00 | 03/10/2026 |
| WATER- TURN ON | ¤50.00 | 03/10/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/10/2026 |
| INSPECTION - RESIDENTIAL | ¤1,009.25 | 03/10/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤286.26 | 03/10/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | |
| Fees | Total Due: ¤32.50 | Total Paid: ¤32,360.31 |