I want to search for...
Permit #2026020513
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7024-00250-0020 |
| CONDITIONED SPACE: 2265 sqft |
| GARAGE: 479 sqft |
| OPENED PORCH (WITH ROOF) : 242 sqft |
| Total Square Footage: 2986 sqft |
| Block: 00250 |
| Subdivision: - |
| Job Phone: 386-254-5081 |
| Location Address: 13 PRINCETON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/04/2026 |
| NOC: RECORDED |
| Applicant name: WILLIAM BRYAN ADAMS SR |
| Owner: ADAMS HOMES OF NORTHWEST FLORIDA INC |
|
Address 100 WEST GARDEN STREET PENSACOLA, FL 32502 |
|
Address SECOND FLOOR PENSACOLA, FL 32502 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤205,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ADAMS HOMES OF NORTHWEST FLORIDA, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 GULF BREEZE PARKWAY GULD BREEZE, FL 32563 |
CRC1330146 (Exp: 08/31/2026) | 386-254-5081 |
Sub Contractors
MICHAEL THACKABERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
18115 DEMKO RD ALTOONA, FL 32702 |
CCC1336911 (Exp: 08/31/2026) | 517-499-5016 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| ALL ROUGH | 06/12/2026 | RSIMS | |
| LATH/BRICK/ WATER BARRIER | 06/11/2026 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 1. Engineering missing on A11 highlighted in packet. 2. Roof sheathing not nailed down in master bedroom. Sheathing and truss marked with orange paint. Check at next inspection. | |||
| DRYWALL NAILING | 06/11/2026 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 1. Engineering missing on A11 highlighted in packet. 2. Roof sheathing not nailed down in master bedroom. Sheathing and truss marked with orange paint. Check at next inspection. | |||
| WALL SHEATHING | 05/26/2026 | APPROVED | PKNAPIK |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/26/2026 | APPROVED - AS NOTED | PKNAPIK |
| Note: 1. Engineering missing on A11 highlighted in packet. 2. Roof sheathing not nailed down in master bedroom. Sheathing and truss marked with orange paint. Check at next inspection. | |||
| ROOF VALLEY & METAL | 05/26/2026 | APPROVED | PKNAPIK |
| MONOLITHIC SLAB | 05/05/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/5/2026 2:16:21 PM *** Approved | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/01/2026 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/1/2026 2:45:32 PM *** Approved | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/30/2026 | APPROVED | PKNAPIK |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/24/2026 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 03/24/2026 | APPROVED | ISANDERSON |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| INSULATION | |||
| LATH/BRICK/ WATER BARRIER | |||
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 1. Engineering missing on A11 highlighted in packet. 2. Roof sheathing not nailed down in master bedroom. Sheathing and truss marked with orange paint. Check at next inspection. | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| DRYWALL NAILING | |||
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 1. Engineering missing on A11 highlighted in packet. 2. Roof sheathing not nailed down in master bedroom. Sheathing and truss marked with orange paint. Check at next inspection. | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/30/2026 | 04/30/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/28/2026 | 04/28/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/28/2026 | 04/28/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please upload Geotech cert. letter. | |||
| SW1 | COMPLETE | 04/24/2026 | 04/24/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/24/2026 | 04/24/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2026 | 03/26/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2026 | 02/24/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SWALE | PENDING | 02/17/2026 | |
| BLD | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/13/2026 | 02/18/2026 |
| LOCATE | COMPLETE | 02/13/2026 | 02/19/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/13/2026 | 02/20/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/13/2026 | 02/18/2026 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. SUBMIT UPDATED COLOR MATERIAL SHEET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 03/04/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/04/2026 |
| INSPECTION - RESIDENTIAL | ¤1,204.50 | 03/04/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤341.64 | 03/04/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 03/04/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/04/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/04/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/04/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/04/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/04/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/04/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/04/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/04/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/04/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/04/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/04/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/04/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/04/2026 |
| SURCHARGE FS 533.721 | ¤15.76 | 03/04/2026 |
| SURCHARGE - FS 468.631 | ¤23.64 | 03/04/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/04/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/04/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤8,539.05 | 03/04/2026 |
| SEWER CREDIT | (¤2,465.75) | 03/04/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/04/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/04/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/04/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/04/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/04/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/04/2026 |
| SITE PLAN 30 | ¤30.00 | 03/04/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤32,305.03 |