I want to search for...
Permit #2026020523
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7028-00480-0060 |
| CONDITIONED SPACE: 2265 sqft |
| GARAGE: 479 sqft |
| OPENED PORCH (WITH ROOF) : 242 sqft |
| Total Square Footage: 2986 sqft |
| Block: 00480 |
| Subdivision: 7028 - |
| Job Phone: 386-254-5081 |
| Location Address: 75 PORT ROYAL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/23/2026 |
| NOC: RECORDED |
| Applicant name: WILLIAM BRYAN ADAMS SR |
| Owner: ADAMS HOMES OF NORTHWEST FLORIDA INC |
|
Address 100 W GARDEN STREET PENSACOLA, FL 32502 |
|
Address SECOND FLOOR PENSACOLA, FL 32502 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤205,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ADAMS HOMES OF NORTHWEST FLORIDA, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 GULF BREEZE PARKWAY GULD BREEZE, FL 32563 |
CRC1330146 (Exp: 08/31/2026) | 386-254-5081 |
Sub Contractors
MICHAEL THACKABERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
18115 DEMKO RD ALTOONA, FL 32702 |
CCC1336911 (Exp: 08/31/2026) | 517-499-5016 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2026 | APPROVED | JSTEWART |
| Note: 6/5/2026 - PREVIOUS INSPECTION NOTES 6/5/26: Incomplete inspection due to missing plans and no stamped approved plans in box or on site. No truss layout plan on site. 1). Did a preliminary framing/tie down inspection. See un-stamped plans for deficiencies marked. (Only Roof Sheathing checked and approved). A FULL INSPECTION WILL STILL NEED TO BE PERFORMED. Please verify all items required on approved plans are completed prior to scheduling re-inspection. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 5/19/2026 12:21:04 PM *** 5/19/26: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26: *** There are still numerous areas where dirt cave in has reduced rebar clearance to less than the 3" minimum required by FBC-R404.1.3.3.7.4 Column footer at front left side is still flooded. FBC-R404.1.3.3.7.4 / FBC [A] 110.3 5/15/2026 - PREVIOUS INSPECTION NOTES R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Column footing flooded 5/13/2026 - PREVIOUS INSPECTION NOTES 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| ROOF VALLEY & METAL | 06/09/2026 | APPROVED | JSTEWART |
| WALL SHEATHING | 06/05/2026 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 5/19/2026 12:21:04 PM *** 5/19/26: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26: *** There are still numerous areas where dirt cave in has reduced rebar clearance to less than the 3" minimum required by FBC-R404.1.3.3.7.4 Column footer at front left side is still flooded. FBC-R404.1.3.3.7.4 / FBC [A] 110.3 5/15/2026 - PREVIOUS INSPECTION NOTES R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Column footing flooded 5/13/2026 - PREVIOUS INSPECTION NOTES 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/05/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/5/2026 9:54:51 AM *** 6/5/26: Incomplete inspection due to missing plans and no stamped approved plans in box or on site. No truss layout plan on site. 1). Did a preliminary framing/tie down inspection. See un-stamped plans for deficiencies marked. (Only Roof Sheathing checked and approved). A FULL INSPECTION WILL STILL NEED TO BE PERFORMED. Please verify all items required on approved plans are completed prior to scheduling re-inspection. Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 5/19/2026 12:21:04 PM *** 5/19/26: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26: *** There are still numerous areas where dirt cave in has reduced rebar clearance to less than the 3" minimum required by FBC-R404.1.3.3.7.4 Column footer at front left side is still flooded. FBC-R404.1.3.3.7.4 / FBC [A] 110.3 5/15/2026 - PREVIOUS INSPECTION NOTES R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Column footing flooded 5/13/2026 - PREVIOUS INSPECTION NOTES 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| MONOLITHIC SLAB | 05/19/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/19/2026 12:21:04 PM *** 5/19/26: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 5/18/2026 - PREVIOUS INSPECTION NOTES 5/18/26: *** There are still numerous areas where dirt cave in has reduced rebar clearance to less than the 3" minimum required by FBC-R404.1.3.3.7.4 Column footer at front left side is still flooded. FBC-R404.1.3.3.7.4 / FBC [A] 110.3 5/15/2026 - PREVIOUS INSPECTION NOTES R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Column footing flooded 5/13/2026 - PREVIOUS INSPECTION NOTES 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| MONOLITHIC SLAB | 05/18/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/18/2026 10:04:17 AM *** 5/18/26: *** There are still numerous areas where dirt cave in has reduced rebar clearance to less than the 3" minimum required by FBC-R404.1.3.3.7.4 Column footer at front left side is still flooded. FBC-R404.1.3.3.7.4 / FBC [A] 110.3 5/15/2026 - PREVIOUS INSPECTION NOTES R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Column footing flooded 5/13/2026 - PREVIOUS INSPECTION NOTES 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| MONOLITHIC SLAB | 05/15/2026 | Disapproved - NO FEE | KSANDOE |
| Note: R404.1.3.3.7.4 Steel reinforcement in concrete cast against the earth shall have a minimum cover of 3 inches (75 mm). Column footing flooded 5/13/2026 - PREVIOUS INSPECTION NOTES 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| MONOLITHIC SLAB | 05/13/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/13/2026 3:13:09 PM *** 5/13/26: Cancelled by Applicant via text at @ 0839. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/11/2026 | APPROVED | HCAMACHO |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 05/08/2026 | APPROVED | PFLANAGAN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/29/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 04/10/2026 | APPROVED | ISANDERSON |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/10/2026 | 06/10/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/10/2026 | 06/10/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/08/2026 | 05/08/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/08/2026 | 05/08/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/29/2026 | 04/29/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/16/2026 | 04/16/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/09/2026 | 03/11/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/09/2026 | 03/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/02/2026 | 03/03/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM No revised grading plan attached addressing comments. | |||
| BLD | COMPLETE | 03/02/2026 | 03/06/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/25/2026 | 02/25/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM The elevations provided for the adjacent FFEs dont agree with their respective 10' shots. Additionally, based on the information provided by our survey crew, both adjacent lots have incorrect FFEs. Please reshoot the adjacent FFEs and revise grading plan as needed. | |||
| BLD | HOLD | 02/24/2026 | 03/02/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Truss layout for different address. 2ND REQUEST | |||
| SWALE | COMPLETE | 02/17/2026 | 03/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/13/2026 | 02/23/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Truss layout for different address. | |||
| CUSVC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/13/2026 | 02/18/2026 |
| LOCATE | COMPLETE | 02/13/2026 | 02/19/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/23/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/23/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/23/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/23/2026 |
| PEP TANK INSTALL | ¤756.74 | 03/23/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/23/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/23/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/23/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/23/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/23/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/23/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/23/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/23/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/23/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/23/2026 |
| SURCHARGE FS 533.721 | ¤15.76 | 03/23/2026 |
| SURCHARGE - FS 468.631 | ¤23.64 | 03/23/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/23/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/23/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤8,539.05 | 03/23/2026 |
| SEWER CREDIT | (¤2,465.75) | 03/23/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/23/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/23/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/23/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/23/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/23/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/23/2026 |
| SITE PLAN 30 | ¤30.00 | 03/23/2026 |
| WATER- TURN ON | ¤50.00 | 03/23/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/23/2026 |
| INSPECTION - RESIDENTIAL | ¤1,204.50 | 03/23/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤341.64 | 03/23/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤80.00 | Total Paid: ¤33,061.77 |