I want to search for...
Permit #2026020524
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7030-00790-0100 |
| CONDITIONED SPACE: 1368 sqft |
| GARAGE: 422 sqft |
| OPENED PORCH (WITH ROOF) : 133 sqft |
| Total Square Footage: 1923 sqft |
| Block: 00790 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 386-254-5081 |
| Location Address: 87 RAMBLEWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/04/2026 |
| NOC: RECORDED |
| Applicant name: WILLIAM BRYAN ADAMS SR |
| Owner: ADAMS HOMES OF NORTHWEST FLORIDA INC |
|
Address 100 WEST GARDEN STREET PENSACOLA, FL 32502 |
|
Address SECOND FLOOR PENSACOLA, FL 32502 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤155,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ADAMS HOMES OF NORTHWEST FLORIDA, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 GULF BREEZE PARKWAY GULD BREEZE, FL 32563 |
CRC1330146 (Exp: 08/31/2026) | 386-254-5081 |
Sub Contractors
MICHAEL THACKABERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
18115 DEMKO RD ALTOONA, FL 32702 |
CCC1336911 (Exp: 08/31/2026) | 517-499-5016 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| DRYWALL NAILING | 06/11/2026 | APPROVED | CVANSTRAHLEN |
| INSULATION | 06/09/2026 | APPROVED | CVANSTRAHLEN |
| Note: 6/4/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Missing fire stopping on master bedroom top entrance , exterior closet wall top , dryer vent have only 3/4 fire stop foam around Item # 1 from previous inspection still pending Inspector Notes from Inspection 2420 Please fix items before early power inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items #2-All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #3-FBCR P2503.5-NEEDS PRESSURE TEST ON WATER LINES #4-All opening required to be closet on electrical panels, main or meter base (one slot is open & empty on meter base) Inspector Notes from Inspection 2467 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2460 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2450 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| PEP TANK INSTALLATION REQUEST | 06/09/2026 | APPROVED | ISANDERSON |
| INSULATION | 06/04/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Missing fire stopping on master bedroom top entrance , exterior closet wall top , dryer vent have only 3/4 fire stop foam around Item # 1 from previous inspection still pending Inspector Notes from Inspection 2420 Please fix items before early power inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items #2-All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #3-FBCR P2503.5-NEEDS PRESSURE TEST ON WATER LINES #4-All opening required to be closet on electrical panels, main or meter base (one slot is open & empty on meter base) Inspector Notes from Inspection 2467 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2460 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2450 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| ALL ROUGH | 06/01/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before early power inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items #2-All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #3-FBCR P2503.5-NEEDS PRESSURE TEST ON WATER LINES #4-All opening required to be closet on electrical panels, main or meter base (one slot is open & empty on meter base) Inspector Notes from Inspection 2467 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2460 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2450 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| LATH/BRICK/ WATER BARRIER | 06/01/2026 | APPROVED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2467 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2460 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2450 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| ROOF VALLEY & METAL | 05/13/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2460 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2450 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2450 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| WALL SHEATHING | 05/13/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing Inspector Notes from Inspection 2250 Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| MONOLITHIC SLAB | 05/13/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before all rough inspection #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items 4/13/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| MONOLITHIC SLAB | 04/13/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1- rebars must have 3" from soil ( right side garage wall ) #2-removed roots front footing , front garage door footing | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/07/2026 | APPROVED | CVANSTRAHLEN |
| Note: 4/6/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBCR P2503.5-NEEDS 5 FOOT HEAD TEST ON DWV ( need water to the top ) #2-Pressure gauge do not work properly ( leaking on time of testing ) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/06/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBCR P2503.5-NEEDS 5 FOOT HEAD TEST ON DWV ( need water to the top ) #2-Pressure gauge do not work properly ( leaking on time of testing ) | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/06/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/30/2026 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 03/13/2026 | APPROVED | ISANDERSON |
| ELECTRIC - EARLY POWER | |||
| Note: #1- dig 2' down under grown on garage fotters and have a engineering letter for recomments items | |||
| SEWER TIE IN | |||
| GRAVITY SEWER TEST | |||
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | PENDING | 06/12/2026 | |
| BLD | HOLD | 06/10/2026 | 06/12/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Letter submitted is a chango order receipt not the report/letter required by inspector. | |||
| SW1 | COMPLETE | 04/02/2026 | 04/02/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/02/2026 | 04/02/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/27/2026 | 03/30/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/20/2026 | 03/20/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/17/2026 | 03/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/13/2026 | 02/23/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/13/2026 | 02/18/2026 |
| LOCATE | COMPLETE | 02/13/2026 | 02/19/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/13/2026 | 02/18/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/13/2026 | 02/17/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/13/2026 | 02/19/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/04/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/04/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/04/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/04/2026 |
| PEP TANK INSTALL | ¤756.74 | 03/04/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/04/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/04/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/04/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/04/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/04/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/04/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/04/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/04/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/04/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/04/2026 |
| SURCHARGE FS 533.721 | ¤9.94 | 03/04/2026 |
| SURCHARGE - FS 468.631 | ¤14.91 | 03/04/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/04/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/04/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤5,157.36 | 03/04/2026 |
| SEWER CREDIT | (¤1,342.00) | 03/04/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/04/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/04/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/04/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/04/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/04/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/04/2026 |
| SITE PLAN 30 | ¤30.00 | 03/04/2026 |
| WATER- TURN ON | ¤50.00 | 03/04/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/04/2026 |
| INSPECTION - RESIDENTIAL | ¤750.75 | 03/04/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤212.94 | 03/04/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤40.00 | Total Paid: ¤30,206.83 |