I want to search for...
Permit #2026020662
Permit Details
Status: INSPECT
| Parcel Id: 23-11-30-6061-00000-0590 |
| CONDITIONED SPACE: 1891 sqft |
| GARAGE: 427 sqft |
| GARAGE: 50 sqft |
| OPENED PORCH (WITH ROOF) : 163 sqft |
| Total Square Footage: 2531 sqft |
| Subdivision: 2332 - WHITEVIEW VILLAGE SUBDIVISION PHASE 2 |
| Job Phone: 904-596-6645 |
| Location Address: 120 WAVERLY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/04/2026 |
| NOC: RECORDED |
| Applicant name: MICHAEL T HOLDER |
| Owner: KB HOME JACKSONVILLE, LLC |
|
Address 10475 FORTUNE PKWY, STE 100 JACKSONVILLE, FL 32256 |
| Lot: 59 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: NEW SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
KB HOME JACKSONVILLE, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
10475 FORTUNE PKWY JACKSONVILLE, FL 32256 |
SUITE 100 JACKSONVILLE, FL 32256 |
CGC1509034 (Exp: 08/31/2026) | 904-596-6645 |
Sub Contractors
BOBBY WAYNE CAMPBELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
117 GUTHRIE ROAD GREEN COVE SPRINGS, FL 32043 |
CCC1326752 (Exp: 08/31/2026) | 904-200-1600 |
LARRY WILLIAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1750 EMERSON ST JACKSONVILLE, FL 32207 |
LI45034 (Exp: 08/31/2026) | 904-721-5431 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
COREY MICHAEL TENNANT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3370 AGRICULTURAL CNETER DR ST AUGUSTINE, FL 32092 |
CAC1819063 (Exp: 08/31/2026) | 904-829-8898 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF VALLEY & METAL | 06/15/2026 | HCAMACHO | |
| Note: Inspector Notes from Inspection 2460 1. Back bedroom right wall calls for (3) 2x4 post, missing a 2x4. See Plans. 2. Need to remove all shinners from roof decking before installing shingles. FBC R803.2.3 | |||
| WATER METER INSTALLATION REQUEST | 06/12/2026 | ||
| WALL SHEATHING | 06/08/2026 | APPROVED | HCAMACHO |
| Note: 6/2/2026 - PREVIOUS INSPECTION NOTES 1. Several areas around the house marked in orange needs to be nailed and shiners removed per plan. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/08/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Back bedroom right wall calls for (3) 2x4 post, missing a 2x4. See Plans. 2. Need to remove all shinners from roof decking before installing shingles. FBC R803.2.3 | |||
| WALL SHEATHING | 06/02/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Several areas around the house marked in orange needs to be nailed and shiners removed per plan. | |||
| MONOLITHIC SLAB | 05/20/2026 | APPROVED | HCAMACHO |
| Note: 5/18/2026 - PREVIOUS INSPECTION NOTES 1. Footers in the front of the house and garage side measure 22", 21", 20" in certain areas. -The footers in the front of the house, front right to about 10' back and the whole garage side need to be at 24" deep from the top of the form, per the grading plan, and the notes that Stormwater issued. In order to meet the correct depth of footer in the ground according to Building Code. FBC R403.1.3.4 2. The steel in the front footer is not supported off the ground and is not tied up. FBC R404.1.3.3.7.4 | |||
| MONOLITHIC SLAB | 05/18/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Footers in the front of the house and garage side measure 22", 21", 20" in certain areas. -The footers in the front of the house, front right to about 10' back and the whole garage side need to be at 24" deep from the top of the form, per the grading plan, and the notes that Stormwater issued. In order to meet the correct depth of footer in the ground according to Building Code. FBC R403.1.3.4 2. The steel in the front footer is not supported off the ground and is not tied up. FBC R404.1.3.3.7.4 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/14/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: Note- water service is not connected yet. | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 05/13/2026 | APPROVED | RRICKS |
| Note: 5/13/2026 RRicks Approved as noted: At the front on both side of the home, there shall be a minimum of 24 inches from the top of the formboard to the bottom of the footer. The footers shall gradually transition along adjacent sides of the home to accommodate the proposed grading and ensure compliance. | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/13/2026 | 05/13/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: At the front on both side of the home, there shall be a minimum of 24 inches from the top of the formboard to the bottom of the footer. The footers shall gradually transition along adjacent sides of the home to accommodate the proposed grading and ensure compliance. | |||
| ZON | COMPLETE | 05/13/2026 | 05/13/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/04/2026 | 03/10/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/18/2026 | 02/24/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/18/2026 | 02/25/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/18/2026 | 02/23/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/18/2026 | 02/19/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 02/18/2026 | 02/19/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/18/2026 | 02/19/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/18/2026 | 02/23/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/18/2026 | 02/25/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please provide proposed elevations on the grading plan, additionally there shall be a legend depicting existing and proposed elevations. | |||
| ZON | COMPLETE | 02/18/2026 | 02/20/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 05/04/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/04/2026 |
| INSPECTION - RESIDENTIAL | ¤1,012.00 | 05/04/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤287.04 | 05/04/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 05/04/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/04/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/04/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 05/04/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 05/04/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 05/04/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 05/04/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 05/04/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 05/04/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 05/04/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 05/04/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 05/04/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 05/04/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 05/04/2026 |
| SURCHARGE FS 533.721 | ¤13.29 | 05/04/2026 |
| SURCHARGE - FS 468.631 | ¤19.94 | 05/04/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤7,129.07 | 05/04/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 05/04/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 05/04/2026 |
| SEWER CAPITAL FACILITY | ¤3,741.76 | 05/04/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,164.80 | 05/04/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 05/04/2026 |
| SITE PLAN 30 | ¤30.00 | 05/04/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤26,904.43 |