I want to search for...

Permit #2026020832

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7016-00120-0780
Block: 00120
Subdivision: 7016 -
Job Phone: 386-931-6577
Location Address: 17 CUNNINGHAM LN
Type: SW - SEAWALL
Issue Date: 03/24/2026
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: GONCALVES VICTOR M & IDELVANI SILVA GONCALVES H&W

Address

91 CHAMBERS STREET FL #3

NEWARK, NJ 07105

Lot: 0780
Contracted Stated Job Value: ¤20,000.00
Job Description: GREY VINYL SEAWALL WITH CONCRETE CAP - & 10' RETURN
Type: CN

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone Fax
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CGC1519145 (Exp: 08/31/2026) 386-931-6577 386-263-3331

Inspection History

Type Request Date Result Inspector
SEAWALL DEADMAN CAP 05/21/2026 APPROVED MCONTRYMAN
ROW -TURBIDITY BARRER 03/25/2026 APPROVED TPOLACEK
Note: TURBIDITY BARRIER MUST STAY IN PLACE UNTIL THE END OF PROJECT, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL
ROW - FINAL INSPECTION
SEAWALL FINAL

Review History

Department Status Date In Date Out
ZON COMPLETE 03/09/2026 03/09/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/09/2026 03/10/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 02/23/2026 02/24/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), CITY OF PALM COAST LAND DEVELOPMENT CODE, CITY OF PALM COAST TECHNICAL MANUAL (COPCTM), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC), AND AUTHORITY HAVING JURISDICTION (AHJ). Add General Note (or similarly titled) section titled “City of Palm Coast Seawalls, Bulkheads and Revetments Construction Standards” conspicuously displayed on the plans and add the following general notes: 1. Seawall and revetment construction shall conform to the City of Palm Coast Technical Manual Engineering Design Standards Section 1100.09 Seawalls / Bulkheads and Revetments and the City of Palm Coast Unified Land Development Code Chapter 4, Section 4.01.06. In the event of conflict between seawall and revetment design plans and The City of Palm Coast Technical Manual Engineering Design Standards Section 1100.09, the City of Palm Coast Technical Manual Engineering Design Standards Section 1100.09 and the Unified Land Development Code Chapter 4, Section 4.01.06 shall be controlling. 2. Turbidity barriers shall be installed and maintained in accordance with the City of Palm Coast Technical Manual Engineering Design Standards Section 1200 Erosion Control, Section 1200.01 and Drawing # 1200 B Floating Turbidity Barrier Example. 3. Turbidity barriers shall be installed prior to construction, removal of turf and landscaping and disturbance and removal of any part of the seawall. 4. Turbidity barriers shall be installed and maintained and shall remain in place for the duration of construction and shall not be removed until collected sediment and debris have been removed to the original canal depth or approved plan elevation. 5. Turbidity barriers shall remain in place until all upland areas have been restored and all landscaping and final lot improvements have been completed and the ROW Final Inspection is approved by the City. 6. Turbidity barriers shall not be anchored or otherwise attached to any seawall. 7. Existing seawall panels, bulkhead cap, restraints / deadman, seawall panels shall be completely removed from the City of Palm Coast Right-of-Way and lawfully disposed of in accordance with Florida Statutes and Department of Environmental Protection regulations. Exceptions for partial seawall reconstruction projects may be accepted by the City of Palm Coast at its discretion and with prior coordination and approval before commencement of seawall removal / deconstruction. 8. The new seawall shall be installed entirely within private property and in vertical and horizontal alignment with existing, adjacent seawalls. If no adjacent seawalls exist then seawall panels are to be installed within private property. Not more than one-half of the bulkhead cap may project into the City Right-of-Way provided no part of the seawall panels project into the Right of Way. 9. The top of the seawall bulkhead cap shall be a maximum of elevation of 2.5 feet based on the NAVD 88. 10. The top of the seawall bulkhead cap may be increased in elevation when connection to an existing bulkhead at the end of the canal is necessary but in no case can the new seawall cap be at a higher elevation than the bulkhead at the end of the canal. The maximum allowed transition in elevation is the width of one (1) seawall panel. 11. Upon completion of the seawall, backfill and grading disturbed areas shall be immediately sodded. Erosion control devices shall be maintained until the site is sodded. PLAN REVIEW COMMENTS 1. Add note on seawall engineering plans indicating the elevation of the seawall bulkhead cap to be not more than 2.5 NAVD. Show note at both ends of seawall. COPCTM Section1100.09 E. 2. Provide structural connection of seawall cap and panels ro adjacent seawall cap and panels or provide a seawall return. Seawall returns to extend a minimum of 10 Feet into the property and constructed in the same manner as other parts of the seawall. The seawall return may need to extend further into the lot a sufficient distance to ensure the completed post-construction grading can be completedin a manner so that the lot stormwater drainage remains on the lot until it flows over the seawall and does not top or circumvent the return and impact adjacent lot owner. COPCTM SECTION 1100.09, DRAWING #1100.G. 3. Engineer to provide erosion proof and watertight seawall panel connection detail to existing seawalls on adjacent properties using one-half inch expansion joint material or other approved means of sealing panel connections. COPCTM Section 1100.09 Drawing # 1100.G 4. Plan Page 3- need to update building code year in notes
ENGIN1 COMPLETE 02/23/2026 02/24/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 02/23/2026 02/23/2026
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please provide note that the seawall will be gray in color.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/24/2026
INSPECTION - RESIDENTIAL ¤60.00 03/24/2026
PLAN REVIEW - MISC 32.50 ¤32.50 03/24/2026
RSI GENERAL INSPECTION 16.25 ¤16.25 03/24/2026
RSI ROW FINAL INSPECTION ¤16.25 03/24/2026
RSI ROW STORMWATER FINAL INSP ¤32.50 03/24/2026
SURCHARGE FS 533.721 ¤2.00 03/24/2026
SURCHARGE - FS 468.631 ¤2.00 03/24/2026
SITE PLAN 15 ¤15.00 03/24/2026
Fees Total Due: ¤0.00 Total Paid: ¤206.50