I want to search for...
Permit #2026020903
Permit Details
Status: INSPECT
| Parcel Id: 04-11-30-5571-00000-3050 |
| CONDITIONED SPACE: 1541 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| OPENED PORCH (WITH ROOF) : 220 sqft |
| Total Square Footage: 2233 sqft |
| Subdivision: 2366 - SOMERSET SUBDIVISION PH 2 |
| Job Phone: 904-596-6645 |
| Location Address: 105 TEA OLIVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/18/2026 |
| NOC: RECORDED |
| Applicant name: MICHAEL T HOLDER |
| Owner: KB HOME JACKSONVILLE LLC |
|
Address 10475 FORTUNE PARKWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 100 JACKSONVILLE, FL 32256 |
| Lot: 305 |
| Contracted Stated Job Value: ¤14,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
KB HOME JACKSONVILLE, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
10475 FORTUNE PKWY JACKSONVILLE, FL 32256 |
SUITE 100 JACKSONVILLE, FL 32256 |
CGC1509034 (Exp: 08/31/2026) | 904-596-6645 |
Sub Contractors
BOBBY WAYNE CAMPBELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
117 GUTHRIE ROAD GREEN COVE SPRINGS, FL 32043 |
CCC1326752 (Exp: 08/31/2026) | 904-200-1600 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
LARRY WILLIAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1750 EMERSON ST JACKSONVILLE, FL 32207 |
LI45034 (Exp: 08/31/2026) | 904-721-5431 |
COREY MICHAEL TENNANT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3370 AGRICULTURAL CNETER DR ST AUGUSTINE, FL 32092 |
CAC1819063 (Exp: 08/31/2026) | 904-829-8898 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/11/2026 | FINAL APPROVED | JSTEWART |
| Note: 6/8/2026 - PREVIOUS INSPECTION NOTES 1. Please raise AC pad min 3" above surrounding ground. FBCR M1305.1.4.1 2. Spare bath Lav drain plug is stuck closed. FBCR P2705.1 – 4 | |||
| BLD - BUILDING FINAL | 06/08/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Please raise AC pad min 3" above surrounding ground. FBCR M1305.1.4.1 2. Spare bath Lav drain plug is stuck closed. FBCR P2705.1 – 4 | |||
| U-CROSS CONNECTION | 06/03/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No CC. IRR with reuse water. | |||
| ELECTRIC - EARLY POWER | 05/18/2026 | APPROVED | JSTEWART |
| ROW- PRE-APRON (PRE-POUR) | 05/05/2026 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/05/26 ** READY TO POUR ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 5/4/2026 - PREVIOUS INSPECTION NOTES 05-04-26 TPOLACEK** POUR AREA UNDER WATER. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/04/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05-04-26 TPOLACEK** POUR AREA UNDER WATER. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| DRYWALL NAILING | 04/28/2026 | APPROVED | JSTEWART |
| INSULATION | 04/24/2026 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings. | |||
| INSULATION | 04/23/2026 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: Previous Notes from All rough not rectified... 1. No water preassure test. FBCR P2503.7 2. Re seal bath exhaust duct at roof penetration. FBCR M1601.4.1 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Per Plan Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2420 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings. | |||
| LATH/BRICK/ WATER BARRIER | 04/23/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2420 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings. | |||
| ALL ROUGH | 04/21/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings. | |||
| SEWER TIE IN | 04/21/2026 | APPROVED | JSTEWART |
| Note: 4/2/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in. | |||
| GRAVITY SEWER TEST | 04/21/2026 | APPROVED | JSTEWART |
| Note: 4/2/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in. | |||
| ELECTRIC-TUG | 04/20/2026 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/20/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings. | |||
| ROOF VALLEY & METAL | 04/20/2026 | APPROVED | HCAMACHO |
| Note: 4/16/2026 - PREVIOUS INSPECTION NOTES Roof sheathing /braces/and ties need approval prior. | |||
| ROOF VALLEY & METAL | 04/16/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Roof sheathing /braces/and ties need approval prior. | |||
| WALL SHEATHING | 04/16/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/16/2026 | Disapproved - NO FEE | JSTEWART |
| Note: No plans onsite FBC [A]107.3.1 No truss drawings. | |||
| GRAVITY SEWER TEST | 04/02/2026 | CANCELLED BY APPLICANT | JSTEWART |
| Note: Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in. | |||
| SEWER TIE IN | 04/02/2026 | CANCELLED BY APPLICANT | JSTEWART |
| Note: Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in. | |||
| MONOLITHIC SLAB | 03/30/2026 | APPROVED | JSTEWART |
| Note: 3/27/2026 - PREVIOUS INSPECTION NOTES Footing reinforcement does not meet min 3" clearence from soil in Multiple locations (Crushed chairs, rebar not on chair laying on soil). FBC R404.1.3.3.7.4 Please repair main water line sleeve, currently half way thru the footing (Foundation), and rebar laying on soil and the main water line. FBCR P2603.4 | |||
| MONOLITHIC SLAB | 03/27/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Footing reinforcement does not meet min 3" clearence from soil in Multiple locations (Crushed chairs, rebar not on chair laying on soil). FBC R404.1.3.3.7.4 Please repair main water line sleeve, currently half way thru the footing (Foundation), and rebar laying on soil and the main water line. FBCR P2603.4 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/24/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in. | |||
| WATER METER INSTALLATION REQUEST | 03/24/2026 | APPROVED | ISANDERSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 03/23/2026 | APPROVED | RRICKS |
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/04/2026 | 06/04/2026 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM report is missing address of the home and all its information | |||
| SW1 | COMPLETE | 03/20/2026 | 03/23/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2026 | 03/20/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 03/04/2026 | 03/09/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/04/2026 | 03/04/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/02/2026 | 03/02/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM need notarized manuel application with the correct estimated value - not 14,000 | |||
| BLD | COMPLETE | 02/24/2026 | 03/02/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/24/2026 | 02/27/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/24/2026 | 03/02/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/24/2026 | 02/25/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 02/24/2026 | 02/25/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/24/2026 | 02/25/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/24/2026 | 02/26/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/24/2026 | 03/02/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/24/2026 | 02/25/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscap plan: Provide the grass being proposed and if it will need irrigation Residential homes shall provide a foundation planting consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. | |||
| URB | HOLD | 02/24/2026 | 02/25/2026 |
| Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM Need to indicate the type of Sod / irrigation at 100% coverage. Need to add 2 shrubs @ 3 gallon size, both right and left sides. The code requires 4 shrubs on each sides of the foundation. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/18/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/18/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/18/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/18/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 03/18/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/18/2026 |
| RECLAIM WATER PERMIT INSPECTIO | ¤40.00 | 03/18/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/18/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/18/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/18/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/18/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/18/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/18/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/18/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/18/2026 |
| SURCHARGE FS 533.721 | ¤11.31 | 03/18/2026 |
| SURCHARGE - FS 468.631 | ¤16.97 | 03/18/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤5,809.57 | 03/18/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/18/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/18/2026 |
| SEWER CAPITAL FACILITY | ¤3,628.86 | 03/18/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,091.14 | 03/18/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/18/2026 |
| SITE PLAN 30 | ¤30.00 | 03/18/2026 |
| WATER-METER | ¤874.47 | 03/18/2026 |
| WATER- TURN ON | ¤50.00 | 03/18/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/18/2026 |
| INSPECTION - RESIDENTIAL | ¤858.00 | 03/18/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤243.36 | 03/18/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤75.00 | Total Paid: ¤26,110.21 |