I want to search for...

Permit #2026020903

Permit Details

Status: INSPECT

Parcel Id: 04-11-30-5571-00000-3050
CONDITIONED SPACE: 1541 sqft
GARAGE: 435 sqft
OPENED PORCH (WITH ROOF) : 37 sqft
OPENED PORCH (WITH ROOF) : 220 sqft
Total Square Footage: 2233 sqft
Subdivision: 2366 - SOMERSET SUBDIVISION PH 2
Job Phone: 904-596-6645
Location Address: 105 TEA OLIVE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/18/2026
NOC: RECORDED
Applicant name: MICHAEL T HOLDER
Owner: KB HOME JACKSONVILLE LLC

Address

10475 FORTUNE PARKWAY

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 305
Contracted Stated Job Value: ¤14,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

KB HOME JACKSONVILLE, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

10475 FORTUNE PKWY

JACKSONVILLE, FL 32256

SUITE 100

JACKSONVILLE, FL 32256

CGC1509034 (Exp: 08/31/2026) 904-596-6645

Sub Contractors

BOBBY WAYNE CAMPBELL
Status Location Address State License Number Phone
ACTIVE

117 GUTHRIE ROAD

GREEN COVE SPRINGS, FL 32043

CCC1326752 (Exp: 08/31/2026) 904-200-1600
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272
LARRY WILLIAMS
Status Location Address State License Number Phone
ACTIVE

1750 EMERSON ST

JACKSONVILLE, FL 32207

LI45034 (Exp: 08/31/2026) 904-721-5431
COREY MICHAEL TENNANT
Status Location Address State License Number Phone
ACTIVE

3370 AGRICULTURAL CNETER DR

ST AUGUSTINE, FL 32092

CAC1819063 (Exp: 08/31/2026) 904-829-8898
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/11/2026 FINAL APPROVED JSTEWART
Note: 6/8/2026 - PREVIOUS INSPECTION NOTES 1. Please raise AC pad min 3" above surrounding ground. FBCR M1305.1.4.1 2. Spare bath Lav drain plug is stuck closed. FBCR P2705.1 – 4
BLD - BUILDING FINAL 06/08/2026 Disapproved - NO FEE JSTEWART
Note: 1. Please raise AC pad min 3" above surrounding ground. FBCR M1305.1.4.1 2. Spare bath Lav drain plug is stuck closed. FBCR P2705.1 – 4
U-CROSS CONNECTION 06/03/2026 APPROVED - AS NOTED BWRIGHT
Note: No CC. IRR with reuse water.
ELECTRIC - EARLY POWER 05/18/2026 APPROVED JSTEWART
ROW- PRE-APRON (PRE-POUR) 05/05/2026 APPROVED - AS NOTED EMADISON
Note: ** 05/05/26 ** READY TO POUR ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ______________________________________________________________________________________________________________________ 5/4/2026 - PREVIOUS INSPECTION NOTES 05-04-26 TPOLACEK** POUR AREA UNDER WATER. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 05/04/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: 05-04-26 TPOLACEK** POUR AREA UNDER WATER. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
DRYWALL NAILING 04/28/2026 APPROVED JSTEWART
INSULATION 04/24/2026 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings.
INSULATION 04/23/2026 Disapproved -FEE REQUIRED JSTEWART
Note: Previous Notes from All rough not rectified... 1. No water preassure test. FBCR P2503.7 2. Re seal bath exhaust duct at roof penetration. FBCR M1601.4.1 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Per Plan Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2420 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings.
LATH/BRICK/ WATER BARRIER 04/23/2026 APPROVED - AS NOTED JSTEWART
Note: Inspector Notes from Inspection 2420 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings.
ALL ROUGH 04/21/2026 APPROVED - AS NOTED JSTEWART
Note: 1. No water preassure test. 2. Re seal bath exhaust duct at roof penetration. 3. Fridgerator water supply is not trimmed out (Box and shut off valve). Will need repaired prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings.
SEWER TIE IN 04/21/2026 APPROVED JSTEWART
Note: 4/2/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
GRAVITY SEWER TEST 04/21/2026 APPROVED JSTEWART
Note: 4/2/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
ELECTRIC-TUG 04/20/2026 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/20/2026 APPROVED - AS NOTED HCAMACHO
Note: 1. Roof Overframing in the rear is missing H3 clips or Screws. See Plans detail A/S-4. 2. Trusses A2, A3, and A7 Missing eng. See plans. *Will check at Rough* 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite FBC [A]107.3.1 No truss drawings.
ROOF VALLEY & METAL 04/20/2026 APPROVED HCAMACHO
Note: 4/16/2026 - PREVIOUS INSPECTION NOTES Roof sheathing /braces/and ties need approval prior.
ROOF VALLEY & METAL 04/16/2026 Disapproved - NO FEE JSTEWART
Note: Roof sheathing /braces/and ties need approval prior.
WALL SHEATHING 04/16/2026 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/16/2026 Disapproved - NO FEE JSTEWART
Note: No plans onsite FBC [A]107.3.1 No truss drawings.
GRAVITY SEWER TEST 04/02/2026 CANCELLED BY APPLICANT JSTEWART
Note: Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
SEWER TIE IN 04/02/2026 CANCELLED BY APPLICANT JSTEWART
Note: Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
MONOLITHIC SLAB 03/30/2026 APPROVED JSTEWART
Note: 3/27/2026 - PREVIOUS INSPECTION NOTES Footing reinforcement does not meet min 3" clearence from soil in Multiple locations (Crushed chairs, rebar not on chair laying on soil). FBC R404.1.3.3.7.4 Please repair main water line sleeve, currently half way thru the footing (Foundation), and rebar laying on soil and the main water line. FBCR P2603.4
MONOLITHIC SLAB 03/27/2026 Disapproved - NO FEE JSTEWART
Note: Footing reinforcement does not meet min 3" clearence from soil in Multiple locations (Crushed chairs, rebar not on chair laying on soil). FBC R404.1.3.3.7.4 Please repair main water line sleeve, currently half way thru the footing (Foundation), and rebar laying on soil and the main water line. FBCR P2603.4
PLUMBING 1ST ROUGH UNDERGROUND 03/24/2026 APPROVED - AS NOTED JSTEWART
Note: Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
WATER METER INSTALLATION REQUEST 03/24/2026 APPROVED ISANDERSON
FORMBOARD SURVEY (OFFICE USE ONLY) 03/23/2026 APPROVED RRICKS
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/04/2026 06/04/2026
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM report is missing address of the home and all its information
SW1 COMPLETE 03/20/2026 03/23/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/20/2026 03/20/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
URB COMPLETE 03/04/2026 03/09/2026
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
ZON COMPLETE 03/04/2026 03/04/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 03/02/2026 03/02/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM need notarized manuel application with the correct estimated value - not 14,000
BLD COMPLETE 02/24/2026 03/02/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 02/24/2026 02/27/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 02/24/2026 03/02/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/24/2026 02/25/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS COMPLETE 02/24/2026 02/25/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 02/24/2026 02/25/2026
Note: Released By: IVAN SANDERSON - -
MECH COMPLETE 02/24/2026 02/26/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/24/2026 03/02/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 02/24/2026 02/25/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscap plan: Provide the grass being proposed and if it will need irrigation Residential homes shall provide a foundation planting consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there.
URB HOLD 02/24/2026 02/25/2026
Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM Need to indicate the type of Sod / irrigation at 100% coverage. Need to add 2 shrubs @ 3 gallon size, both right and left sides. The code requires 4 shrubs on each sides of the foundation.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 03/18/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/18/2026
FC IMPACT FEE LIBRARY ¤268.00 03/18/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 03/18/2026
WATER METER W/OUT TAP ¤965.03 03/18/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 03/18/2026
RECLAIM WATER PERMIT INSPECTIO ¤40.00 03/18/2026
RSI DRIVEWAY AFTER POUR ¤16.25 03/18/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 03/18/2026
RSI FIELD SURVEY INSPECTION ¤48.75 03/18/2026
RSI FORMBOARD REVIEW ¤16.25 03/18/2026
RSI PLAN REVIEW NEW ¤48.75 03/18/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 03/18/2026
RSI ROW FINAL INSPECTION ¤16.25 03/18/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 03/18/2026
SURCHARGE FS 533.721 ¤11.31 03/18/2026
SURCHARGE - FS 468.631 ¤16.97 03/18/2026
TRANSP RES IMPACT FEE 10-25 ¤5,809.57 03/18/2026
WASTEWATER PERM INSPECTION ¤80.00 03/18/2026
WASTEWATER PERM REVIEW ¤25.00 03/18/2026
SEWER CAPITAL FACILITY ¤3,628.86 03/18/2026
WATER CAPITAL FACILITY FEE ¤3,091.14 03/18/2026
WATER PERMIT REVIEW ¤25.00 03/18/2026
SITE PLAN 30 ¤30.00 03/18/2026
WATER-METER ¤874.47 03/18/2026
WATER- TURN ON ¤50.00 03/18/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/18/2026
INSPECTION - RESIDENTIAL ¤858.00 03/18/2026
PLAN REVIEW - RESIDENTIAL ¤243.36 03/18/2026
REINSPECTION RESIDENTIAL ¤40.00
RSI REINSPECTION 1 ¤35.00
Fees Total Due: ¤75.00 Total Paid: ¤26,110.21