Permit #2026030005

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7058-00790-0020
CONDITIONED SPACE: 2396 sqft
GARAGE: 660 sqft
OPENED PORCH (WITH ROOF) : 242 sqft
Total Square Footage: 3298 sqft
Block: 00790
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 386-445-9009
Location Address: 12 SECOND PATH
Type: DU - DUPLEX
Issue Date: 03/24/2026
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PARKWAY

PALM COAST, FL 32164

Address

SUITE 7

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤297,700.00
Job Description: Duplex
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
ROOF VALLEY & METAL 06/12/2026 CVANSTRAHLEN
FIREWALL DRYWALL NAILING 06/09/2026 APPROVED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2440 Please fix items before next inspection #1-(2) HTS20 required to be connected or nail to 3-1/2x 3-1/2 PSL post ( not to the plate )( side A and B )
FIREWALL FRAMING 06/04/2026 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-(2) HTS20 required to be connected or nail to 3-1/2x 3-1/2 PSL post ( not to the plate )( side A and B )
WALL SHEATHING 06/03/2026 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/03/2026 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-(2) HTS20 required to be connected or nail to 3-1/2x 3-1/2 PSL post ( not to the plate )( side A and B )
TIE BEAM / LINTEL 05/20/2026 APPROVED CVANSTRAHLEN
MONOLITHIC SLAB 05/07/2026 APPROVED CVANSTRAHLEN
PLUMBING 1ST ROUGH UNDERGROUND 05/05/2026 APPROVED CVANSTRAHLEN
FORMBOARD SURVEY (OFFICE USE ONLY) 05/04/2026 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/04/2026 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 03/31/2026 APPROVED ISANDERSON
WILDLIFE CHECK - ENVIRONMENTAL 03/03/2026 APPROVED DRODRIGUEZ
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
LATH/BRICK/ WATER BARRIER
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
ALL ROUGH
FIREWALL FINAL
INSULATION
DRYWALL NAILING
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/04/2026 05/04/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/04/2026 05/04/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 05/04/2026 05/04/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 03/10/2026 03/11/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 03/10/2026 03/10/2026
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
SW1 COMPLETE 03/10/2026 03/11/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
BLD COMPLETE 03/10/2026 03/17/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 03/03/2026 03/11/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD HOLD 03/02/2026 03/06/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
CUSVC COMPLETE 03/02/2026 03/04/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 03/02/2026 03/04/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/02/2026 03/03/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 03/02/2026 03/03/2026
LOCATE COMPLETE 03/02/2026 03/02/2026
Note: Released By: IVAN SANDERSON - -
MECH HOLD 03/02/2026 03/03/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide state card for both sides of duplex
SW1 HOLD 03/02/2026 03/05/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Lot 11 is negatively impacting this lot. Please revise as needed.
ZON HOLD 03/02/2026 03/04/2026
Note: Held By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM SURVEY HAS INCORRECT FLOOD MAP NUMBER NOTED
PLENV COMPLETE 03/02/2026 03/03/2026
Note: Released By: DYLAN RODRIGUEZ - (386)986-2320 - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent gopher tortoises from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. In future submittals, acceptance email for after action report is required to be submitted.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤100.00 03/24/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/24/2026
INSPECTION - RESIDENTIAL ¤1,300.75 03/24/2026
PLAN REVIEW - RESIDENTIAL ¤368.94 03/24/2026
FC IMPACT FEE EMS ¤124.00 03/24/2026
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 03/24/2026
FC IMPACT FEE LIBRARY ¤536.00 03/24/2026
FIRE RES IMPACT FEE 10-25 ¤1,884.00 03/24/2026
PARKS IMPACT FEE 10-25 ¤6,328.00 03/24/2026
RSI DRIVEWAY AFTER POUR ¤16.25 03/24/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 03/24/2026
RSI FIELD SURVEY INSPECTION ¤48.75 03/24/2026
RSI FORMBOARD REVIEW ¤16.25 03/24/2026
RSI PLAN REVIEW NEW ¤48.75 03/24/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 03/24/2026
RSI ROW FINAL INSPECTION ¤16.25 03/24/2026
SCHOOL BOARD IMPACT FEE RES ¤10,900.00 03/24/2026
WASTEWATER MAIN EXTENSION IMPA ¤4,770.00 03/24/2026
SURCHARGE FS 533.721 ¤17.00 03/24/2026
SURCHARGE - FS 468.631 ¤25.50 03/24/2026
SW ENG RES REVIEW 240 ¤240.00 03/24/2026
WATER METER W/ TAP ¤4,653.86 03/24/2026
TRANS DUPLEX 10-25 ¤9,162.30 03/24/2026
SEWER CREDIT (¤1,700.00) 03/24/2026
WASTEWATER PERM INSPECTION ¤80.00 03/24/2026
WASTEWATER PERM REVIEW ¤100.00 03/24/2026
SEWER CAPITAL FACILITY ¤8,830.00 03/24/2026
WATER CAPITAL FACILITY FEE ¤7,580.98 03/24/2026
WATER PERMIT INSPECTION ¤80.00 03/24/2026
WATER MAIN EXTENSION IMPACT ¤1,834.54 03/24/2026
SITE PLAN 30 ¤30.00 03/24/2026
Fees Total Due: ¤0.00 Total Paid: ¤57,939.37