I want to search for...

Permit #2026030023

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7010-00150-0130
Block: 00150
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 386-627-1357
Location Address: 9 FLANDERS LN
Type: DR - DRIVEWAY
Issue Date: 03/12/2026
NOC: RECORDED
Applicant name: MITCHELL REED
Owner: DACOSTA VICTOR & GINA H&W

Address

9 FLANDERS LN

PALM COAST, FL 32137

Lot: 0130
Contracted Stated Job Value: ¤10,000.00
Job Description: Paver driveway
Type: CN

Contractor

ROYAL PAVING LLC
Status Location Address Phone
ACTIVE

4 LEWISTON COURT

PALM COAST, FL 32137

386-237-7516

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 03/27/2026 APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL INSPECTION 03/27/2026 APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 03/27/2026 FINAL APPROVED BWRIGHT
ROW- PRE-APRON (PRE-POUR) 03/23/2026 APPROVED TPOLACEK
Note: 03-23-26 TPOLACEK*** READY TO LAY PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 3/19/2026 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9271 ** 03/18/26 READY TO POUR PAVER RESTRAINTS ONLY ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE _________________________________________________________________________________________________________________________ 3/16/2026 - PREVIOUS INSPECTION NOTES 03-16-26 TPOLACEK** RECIEVED CALL FROM CONTRACTOR ASKING TO CANCEL INSPECTION
ROW- PRE-APRON (PRE-POUR) 03/19/2026 PARTIALLY APPROVED TPOLACEK
Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS Inspector Notes from Inspection 9271 ** 03/18/26 READY TO POUR PAVER RESTRAINTS ONLY ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE _________________________________________________________________________________________________________________________ 3/16/2026 - PREVIOUS INSPECTION NOTES 03-16-26 TPOLACEK** RECIEVED CALL FROM CONTRACTOR ASKING TO CANCEL INSPECTION
ROW- PAVER RESTRAINTS 03/18/2026 APPROVED - AS NOTED EMADISON
Note: ** 03/18/26 READY TO POUR PAVER RESTRAINTS ONLY ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE _________________________________________________________________________________________________________________________ 3/16/2026 - PREVIOUS INSPECTION NOTES 03-16-26 TPOLACEK** RECIEVED CALL FROM CONTRACTOR ASKING TO CANCEL INSPECTION
ROW- PRE-APRON (PRE-POUR) 03/18/2026 Disapproved -FEE REQUIRED EMADISON
Note: ** 03/18/26 CULVERT PIPE FILLED WITH WATER FROM MITERED END TO MITERED END. ** AREA ON EITHER SIDE OF CULVERT PIPE IS TOO SOFT FOOT SINKS 5 - 7 INCHES INTO MUD ** APRON TOO SOFT ** SEE ATTACHED PHOTOS __________________________________________________________________________________________________________________________ 3/16/2026 - PREVIOUS INSPECTION NOTES 03-16-26 TPOLACEK** RECIEVED CALL FROM CONTRACTOR ASKING TO CANCEL INSPECTION
ROW- PRE-APRON (PRE-POUR) 03/16/2026 CANCELLED BY APPLICANT TPOLACEK
Note: 03-16-26 TPOLACEK** RECIEVED CALL FROM CONTRACTOR ASKING TO CANCEL INSPECTION
ROW- PAVER RESTRAINTS 03/16/2026 CANCELLED BY APPLICANT TPOLACEK
Note: 03-16-26 TPOLACEK** RECIEVED CALL FROM CONTRACTOR ASKING TO CANCEL INSPECTION

Review History

Department Status Date In Date Out
ZON COMPLETE 03/09/2026 03/09/2026
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
SWALE COMPLETE 03/03/2026 03/06/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/02/2026 03/03/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI COMPLETE 03/02/2026 03/02/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
UTL COMPLETE 03/02/2026 03/03/2026
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 03/02/2026 03/02/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Bring in original ROW agreement for processing.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 03/26/2026
RSI ROW FINAL INSPECTION ¤16.25 03/12/2026
RSI SITE PLAN REVIEW ¤16.25 03/12/2026
SW ENG RES REVIEW 240 ¤240.00 03/12/2026
SITE PLAN 15 ¤15.00 03/12/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/12/2026
RECORDING FEE REIMBURSE DOC ¤8.50 03/12/2026
RECORDING FEE REIMBURSE DOC ¤44.00 03/12/2026
RSI DRIVEWAY AFTER POUR ¤16.25 03/12/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 03/12/2026
Fees Total Due: ¤0.00 Total Paid: ¤453.75