Permit #2026030150

Permit Details

Status: INSPECT

Parcel Id: 04-11-30-5571-00000-3430
CONDITIONED SPACE: 2568 sqft
GARAGE: 430 sqft
OPENED PORCH (WITH ROOF) : 79 sqft
OPENED PORCH (WITH ROOF) : 240 sqft
Total Square Footage: 3317 sqft
Subdivision: 2366 - SOMERSET SUBDIVISION PH 2
Job Phone: 904-596-6645
Location Address: 55 SOMERSET AVE
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/18/2026
NOC: RECORDED
Applicant name: MICHAEL T HOLDER
Owner: KB HOME JACKSONVILLE LLC

Address

10475 FORTUNE PARKWAY

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 343
Contracted Stated Job Value: ¤140,000.00
Job Description: NEW SINGLE FAMILY DWELLING
Type: CN

Contractor

KB HOME JACKSONVILLE, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

10475 FORTUNE PKWY

JACKSONVILLE, FL 32256

SUITE 100

JACKSONVILLE, FL 32256

CGC1509034 (Exp: 08/31/2026) 904-596-6645

Sub Contractors

LARRY WILLIAMS
Status Location Address State License Number Phone
ACTIVE

1750 EMERSON ST

JACKSONVILLE, FL 32207

LI45034 (Exp: 08/31/2026) 904-721-5431
BOBBY WAYNE CAMPBELL
Status Location Address State License Number Phone
ACTIVE

117 GUTHRIE ROAD

GREEN COVE SPRINGS, FL 32043

CCC1326752 (Exp: 08/31/2026) 904-200-1600
JAMES E LINTON
Status Location Address State License Number Phone
ACTIVE

200 COLLEGE DR

ORANGE PARK, FL 32065

EC0001152 (Exp: 08/31/2026) 904-272-0272
COREY MICHAEL TENNANT
Status Location Address State License Number Phone
ACTIVE

3370 AGRICULTURAL CNETER DR

ST AUGUSTINE, FL 32092

CAC1819063 (Exp: 08/31/2026) 904-829-8898
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426

Inspection History

Type Request Date Result Inspector
ROW- PRE-APRON (PRE-POUR) 06/04/2026 APPROVED - AS NOTED EMADISON
Note: ** 06/04/26 ** READY TO POUR ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
DRYWALL NAILING 05/26/2026 APPROVED HCAMACHO
INSULATION 05/22/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2420 This inspection is for the Bath room adding shower/tub Inspector Notes from Inspection 2250 1. This is for the Bath room downstairs adding a bath tub. Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Previous Note not rectified.....1. Gable End Bracing on 2nd floor missing brackets (HGA 10's at bottom chord per detail A pg s6) Per plan. 1. Missing Nail shields for electric thru out the 1st floor. (to many to list) NEC 300.4 2. Master toilet exhaust duct needs sealed and mechanically fastened at the fan assembly. FBCR M1601.4.1 3. All bath exhaust ducts 1st and 2nd floor need Mechanical fasteners at duct to fan assembly. FBCR M1601.4.1 Will need all repairs prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
LATH/BRICK/ WATER BARRIER 05/22/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2250 1. This is for the Bath room downstairs adding a bath tub. Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Previous Note not rectified.....1. Gable End Bracing on 2nd floor missing brackets (HGA 10's at bottom chord per detail A pg s6) Per plan. 1. Missing Nail shields for electric thru out the 1st floor. (to many to list) NEC 300.4 2. Master toilet exhaust duct needs sealed and mechanically fastened at the fan assembly. FBCR M1601.4.1 3. All bath exhaust ducts 1st and 2nd floor need Mechanical fasteners at duct to fan assembly. FBCR M1601.4.1 Will need all repairs prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
ALL ROUGH 05/22/2026 APPROVED - AS NOTED HCAMACHO
Note: This inspection is for the Bath room adding shower/tub Inspector Notes from Inspection 2250 1. This is for the Bath room downstairs adding a bath tub. Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Previous Note not rectified.....1. Gable End Bracing on 2nd floor missing brackets (HGA 10's at bottom chord per detail A pg s6) Per plan. 1. Missing Nail shields for electric thru out the 1st floor. (to many to list) NEC 300.4 2. Master toilet exhaust duct needs sealed and mechanically fastened at the fan assembly. FBCR M1601.4.1 3. All bath exhaust ducts 1st and 2nd floor need Mechanical fasteners at duct to fan assembly. FBCR M1601.4.1 Will need all repairs prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
MONOLITHIC SLAB 05/21/2026 APPROVED - AS NOTED HCAMACHO
Note: 1. This is for the Bath room downstairs adding a bath tub. Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Previous Note not rectified.....1. Gable End Bracing on 2nd floor missing brackets (HGA 10's at bottom chord per detail A pg s6) Per plan. 1. Missing Nail shields for electric thru out the 1st floor. (to many to list) NEC 300.4 2. Master toilet exhaust duct needs sealed and mechanically fastened at the fan assembly. FBCR M1601.4.1 3. All bath exhaust ducts 1st and 2nd floor need Mechanical fasteners at duct to fan assembly. FBCR M1601.4.1 Will need all repairs prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
PLUMBING 1ST ROUGH UNDERGROUND 05/20/2026 APPROVED - AS NOTED HCAMACHO
Note: Note- Changing bath from 1/2 to full, adding bath tube.
LATH/BRICK/ WATER BARRIER 04/30/2026 APPROVED - AS NOTED JSTEWART
Note: Inspector Notes from Inspection 2420 Previous Note not rectified.....1. Gable End Bracing on 2nd floor missing brackets (HGA 10's at bottom chord per detail A pg s6) Per plan. 1. Missing Nail shields for electric thru out the 1st floor. (to many to list) NEC 300.4 2. Master toilet exhaust duct needs sealed and mechanically fastened at the fan assembly. FBCR M1601.4.1 3. All bath exhaust ducts 1st and 2nd floor need Mechanical fasteners at duct to fan assembly. FBCR M1601.4.1 Will need all repairs prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
ELECTRIC-TUG 04/24/2026 APPROVED - AS NOTED JSTEWART
Note: this inspection was approved prior on 4/21/26. Inspector Notes from Inspection 2200 Authorize release of email.
ALL ROUGH 04/21/2026 APPROVED - AS NOTED JSTEWART
Note: Previous Note not rectified.....1. Gable End Bracing on 2nd floor missing brackets (HGA 10's at bottom chord per detail A pg s6) Per plan. 1. Missing Nail shields for electric thru out the 1st floor. (to many to list) NEC 300.4 2. Master toilet exhaust duct needs sealed and mechanically fastened at the fan assembly. FBCR M1601.4.1 3. All bath exhaust ducts 1st and 2nd floor need Mechanical fasteners at duct to fan assembly. FBCR M1601.4.1 Will need all repairs prior to Insulation inspection approval. Inspector Notes from Inspection 2460 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
ELECTRIC-TUG 04/21/2026 APPROVED - AS NOTED JSTEWART
Note: Authorize release of email.
ROOF VALLEY & METAL 04/20/2026 APPROVED HCAMACHO
Note: 4/16/2026 - PREVIOUS INSPECTION NOTES Roof sheathing/braces/ties need prior approval.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/20/2026 APPROVED - AS NOTED HCAMACHO
Note: 1. Gable End Bracing on 2nd floor missing brackets. Box is there but nothing was used. See Plans. 2. Missing CS16 Between Floors at built up posts 4 locations. See Plans 3. Missing (2) 2x4 post under B2 truss. See plans. 4. Missing 2x4 blocking @12" O.C. along Shearwall to I-Joinst. See Plans. *Will check at Rough Inspection*. 4/16/2026 - PREVIOUS INSPECTION NOTES No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
ROOF VALLEY & METAL 04/16/2026 Disapproved - NO FEE JSTEWART
Note: Roof sheathing/braces/ties need prior approval.
WALL SHEATHING 04/16/2026 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/16/2026 Disapproved -FEE REQUIRED JSTEWART
Note: No plans onsite. FBC [A]107.3.1 No truss drawings onsite. Trades are in the building working, Please reschedule when trades are not working over head, and floor is free of debri.
GRAVITY SEWER TEST 04/02/2026 APPROVED JSTEWART
Note: Main water line installed from house shut off to utility location, snubbed up. Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
SEWER TIE IN 04/02/2026 APPROVED JSTEWART
Note: Main water line installed from house shut off to utility location, snubbed up. Inspector Notes from Inspection 2060 Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
MONOLITHIC SLAB 03/27/2026 APPROVED JSTEWART
PLUMBING 1ST ROUGH UNDERGROUND 03/24/2026 APPROVED - AS NOTED JSTEWART
Note: Main water supply line from utlility to house not installed, will require inspection at either All Rough or Sewer tie in.
WATER METER INSTALLATION REQUEST 03/24/2026 APPROVED ISANDERSON
FORMBOARD SURVEY (OFFICE USE ONLY) 03/23/2026 APPROVED RRICKS
ELECTRIC - EARLY POWER
U-CROSS CONNECTION
BLD - BUILDING FINAL
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 05/07/2026 05/07/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 05/07/2026 05/07/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 05/07/2026 05/08/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 05/07/2026 05/11/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 03/20/2026 03/23/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/20/2026 03/20/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
ELEC COMPLETE 03/10/2026 03/16/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 03/05/2026 03/05/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2026 03/09/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 03/04/2026 03/09/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 03/04/2026 03/09/2026
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations
ENGIN1 COMPLETE 03/04/2026 03/06/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS COMPLETE 03/04/2026 03/05/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 03/04/2026 03/06/2026
Note: Released By: IVAN SANDERSON - -
MECH COMPLETE 03/04/2026 03/05/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/04/2026 03/06/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 03/18/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/18/2026
FC IMPACT FEE LIBRARY ¤268.00 03/18/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 03/18/2026
WATER METER W/OUT TAP ¤965.03 03/18/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 03/18/2026
RECLAIM WATER PERMIT INSPECTIO ¤40.00 03/18/2026
RSI DRIVEWAY AFTER POUR ¤16.25 03/18/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 03/18/2026
RSI FIELD SURVEY INSPECTION ¤48.75 03/18/2026
RSI FORMBOARD REVIEW ¤16.25 03/18/2026
RSI PLAN REVIEW NEW ¤48.75 03/18/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 03/18/2026
RSI ROW FINAL INSPECTION ¤16.25 03/18/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 03/18/2026
SURCHARGE FS 533.721 ¤17.63 03/18/2026
SURCHARGE - FS 468.631 ¤26.45 03/18/2026
TRANSP RES IMPACT FEE 10-25 ¤9,681.36 03/18/2026
WASTEWATER PERM INSPECTION ¤80.00 03/18/2026
WASTEWATER PERM REVIEW ¤25.00 03/18/2026
SEWER CAPITAL FACILITY ¤3,628.86 03/18/2026
WATER CAPITAL FACILITY FEE ¤3,091.14 03/18/2026
WATER PERMIT REVIEW ¤25.00 03/18/2026
SITE PLAN 30 ¤30.00 03/18/2026
WATER-METER ¤874.47 03/18/2026
WATER- TURN ON ¤50.00 03/18/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/18/2026
INSPECTION - RESIDENTIAL ¤1,350.25 03/18/2026
PLAN REVIEW - RESIDENTIAL ¤382.98 03/18/2026
REINSPECTION RESIDENTIAL ¤40.00
Fees Total Due: ¤40.00 Total Paid: ¤30,629.67