I want to search for...

Permit #2026030205

Permit Details

Status: INSPECT

Parcel Id: 21-12-31-5565-00000-0610
CONDITIONED SPACE: 1466 sqft
GARAGE: 248 sqft
OPENED PORCH (WITH ROOF) : 31 sqft
Total Square Footage: 1745 sqft
Subdivision: 2340 - SEMINOLE PALMS TOWN HOMES
Job Phone: 407-717-5418
Location Address: 38 ALEXANDER LN
Type: TH - TOWNHOUSE
Issue Date: 04/06/2026
NOC: RECORDED
Applicant name: CARLOS ANTONIO SERRANO
Owner: NVR INC

Address

8649 BAYPINE ROAD

JACKSONVILLE, FL 32256

Address

BUILDING 5 SUITE 202

JACKSONVILLE, FL 32256

Lot: 61
Contracted Stated Job Value: ¤129,388.00
Job Description: New Construction Townhome
Type: CN

Contractor

RYAN HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

8649 BAYPINE RD

JACKSONVILLE, FL 32256

BLDG 7, STE 202

JACKSONVILLE, FL 32256

CBC1256450 (Exp: 08/31/2026) 407-717-5418

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
BRITT MICHAEL JENKINS
Status Location Address State License Number Phone
ACTIVE

86 COLUMBIA DR

POOLER, GA 31322

CFC1430770 (Exp: 08/31/2026) 912-330-8151

Inspection History

Type Request Date Result Inspector
FIREWALL DRYWALL NAILING 05/26/2026 APPROVED KSANDOE
Note: 5/22/2026 - PREVIOUS INSPECTION NOTES 5/22/26: Cancelled by Applicant in person. Contractor still completing.
DRYWALL NAILING 05/26/2026 APPROVED KSANDOE
Note: 5/22/2026 - PREVIOUS INSPECTION NOTES 5/22/26: Cancelled by Applicant in person. Contractor still completing.
DRYWALL NAILING 05/22/2026 CANCELLED BY APPLICANT RSIMS
Note: 5/22/26: Cancelled by Applicant in person. Contractor still completing.
FIREWALL DRYWALL NAILING 05/22/2026 CANCELLED BY APPLICANT RSIMS
Note: 5/22/26: Cancelled by Applicant in person. Contractor still completing.
INSULATION 05/20/2026 APPROVED KSANDOE
Note: 5/19/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 5/14/26: Check at Insulation. 1). wires in breaker panel need to be phased out. NEC 200.6(B) 2). Fireblocking at top of breaker panel is required. FBC-R302.11 > (2" x _ top plate of breaker panel frame out needs to be turned flat and wires drilled through to reduce firestop annular space to 1/2" ).
INSULATION 05/19/2026 CANCELLED BY APPLICANT KSANDOE
Note: Inspector Notes from Inspection 2420 5/14/26: Check at Insulation. 1). wires in breaker panel need to be phased out. NEC 200.6(B) 2). Fireblocking at top of breaker panel is required. FBC-R302.11 > (2" x _ top plate of breaker panel frame out needs to be turned flat and wires drilled through to reduce firestop annular space to 1/2" ).
FIREWALL PENETRATIONS 05/14/2026 APPROVED RSIMS
Note: 5/14/26: Visually confirmed there are no penetrations through the firewall.
LATH/BRICK/ WATER BARRIER 05/14/2026 APPROVED RSIMS
ALL ROUGH 05/14/2026 APPROVED - AS NOTED RSIMS
Note: 5/14/26: Check at Insulation. 1). wires in breaker panel need to be phased out. NEC 200.6(B) 2). Fireblocking at top of breaker panel is required. FBC-R302.11 > (2" x _ top plate of breaker panel frame out needs to be turned flat and wires drilled through to reduce firestop annular space to 1/2" ).
ELECTRIC-TUG 05/11/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/11/2026 1:47:21 PM *** 5/11/26: FPL emailed > Approved for TUG.
FIREWALL FRAMING 05/06/2026 APPROVED RSIMS
Note: 5/4/2026 - PREVIOUS INSPECTION NOTES 5/4/26: Partial for front porches only.
WALL SHEATHING 05/06/2026 APPROVED RSIMS
Note: 5/4/2026 - PREVIOUS INSPECTION NOTES 5/4/26: Partially approved due to missing sheathing (in order to expose Firewall). 1). exterior sheathing needs to be complete at entry.
ROOF VALLEY & METAL 05/06/2026 APPROVED RSIMS
Note: 5/4/2026 - PREVIOUS INSPECTION NOTES 5/4/26: 2). Flashing at front entry needs to be sealed to exterior plywood
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/06/2026 APPROVED RSIMS
Note: 5/4/2026 - PREVIOUS INSPECTION NOTES 5/4/26: 1). All truss engineering still needs to be complete. 2). straps on exterior corners above patio roofs are not nailed as required. 3). 2-ply trusses need to be connected at OC measurements as required in truss packet.
ROOF VALLEY & METAL 05/04/2026 PARTIALLY APPROVED RSIMS
Note: 5/4/26: 2). Flashing at front entry needs to be sealed to exterior plywood
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/04/2026 PARTIALLY APPROVED RSIMS
Note: 5/4/26: 1). All truss engineering still needs to be complete. 2). straps on exterior corners above patio roofs are not nailed as required. 3). 2-ply trusses need to be connected at OC measurements as required in truss packet.
WALL SHEATHING 05/04/2026 PARTIALLY APPROVED RSIMS
Note: 5/4/26: Partially approved due to missing sheathing (in order to expose Firewall). 1). exterior sheathing needs to be complete at entry.
FIREWALL FRAMING 05/04/2026 PARTIALLY APPROVED RSIMS
Note: 5/4/26: Partial for fronr porches only.
MONOLITHIC SLAB 04/10/2026 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 04/08/2026 APPROVED KSANDOE
GRAVITY SEWER TEST 04/07/2026 APPROVED KSANDOE
SEWER TIE IN 04/07/2026 APPROVED KSANDOE
FORMBOARD SURVEY (OFFICE USE ONLY) 04/06/2026 APPROVED DLEAP
ELECTRIC - EARLY POWER
BLD - BUILDING FINAL
LDSC- LANDSCAPE FINAL
WATER METER INSTALLATION REQUEST
U-CROSS CONNECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
PLENG COMPLETE 04/06/2026 04/06/2026
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
DSD COMPLETE 03/30/2026 03/31/2026
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLENG COMPLETE 03/30/2026 03/31/2026
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLENG HOLD 03/19/2026 03/19/2026
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
DSD HOLD 03/19/2026 03/19/2026
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Cannot accept from board until proposed site plan is approved REPEAT COMMENTS: Lots incorrect on site plan in description should be Lots 59-62 Please provide walkway width and material Survey has incorrect lot number this is lot 61 Need grading plan approval
PLLA COMPLETE 03/19/2026 03/27/2026
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
PLLA HOLD 03/11/2026 03/12/2026
Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM Privide screening for all a/c units at rear of builiding
ARCHR COMPLETE 03/05/2026 03/12/2026
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD COMPLETE 03/05/2026 03/11/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
DSD HOLD 03/05/2026 03/09/2026
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Lots incorrect on site plan in description should be Lots 59-62 Please provide walkway width and material Survey has incorrect lot number this is lot 61
ELEC COMPLETE 03/05/2026 03/09/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 CANCEL 03/05/2026 03/09/2026
GAS CANCEL 03/05/2026 03/06/2026
MECH COMPLETE 03/05/2026 03/09/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLENG HOLD 03/05/2026 03/06/2026
Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Provide Grading Plan
PLLA HOLD 03/05/2026 03/12/2026
Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM Provide screen plantings at air conditioning units at rear of builiding
PLUM COMPLETE 03/05/2026 03/06/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
UD1 COMPLETE 03/05/2026 03/09/2026
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/06/2026
INSPECTION - RESIDENTIAL ¤742.50 04/06/2026
PLAN REVIEW - RESIDENTIAL ¤210.60 04/06/2026
FC IMPACT FEE EMS ¤62.00 04/06/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/06/2026
FC IMPACT FEE LIBRARY ¤268.00 04/06/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 04/06/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 04/06/2026
SURCHARGE FS 533.721 ¤9.83 04/06/2026
SURCHARGE - FS 468.631 ¤14.75 04/06/2026
TRANSP MULTI IMPACT FEE 10-25 ¤6,410.82 04/06/2026
TRANSP MULTI IMPACT FEE 10-25 (¤6,410.82) 04/06/2026
WASTEWATER PERM INSPECTION ¤80.00 04/06/2026
WASTEWATER PERM REVIEW ¤25.00 04/06/2026
WATER PERMIT REVIEW ¤25.00 04/06/2026
SITE PLAN 30 ¤30.00 04/06/2026
Fees Total Due: ¤0.00 Total Paid: ¤5,821.68