I want to search for...
Permit #2026030356
Permit Details
Status: APPLY
| Parcel Id: 07-11-31-7013-00150-0160 |
| Total Square Footage: 1707 sqft |
| Block: 00150 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 904-315-7776 |
| Location Address: 51 BRITTANY LN |
| Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION |
| NOC: RECORDED |
| Applicant name: ROBERT CHARLES RUSSELL |
| Owner: RUPCHAND ESSARROY & CHANDRAWATIE H&W & RUDRA R RUP |
|
Address 49 BRITTANY LANE PALM COAST, FL 32137 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤181,381.00 |
| Job Description: Fire restoration and minor roof repair |
| Type: CN |
Contractor
TRITON ROOFING & RESTORATION LLC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
450 STATE RD 13 NORTH JACKSONVILLE, FL 32216 |
STE 106 ST JOHNS, FL 32259 |
CBC034391 (Exp: 08/31/2026) | 904-619-8212 | 904-683-3823 |
Inspection History
| Type | Request Date | Result | Inspector |
| PROJECT STATUS (OFFICE USE) | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| FIREWALL PENETRATIONS | |||
| FIREWALL DRYWALL NAILING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| MECH | PENDING | 06/08/2026 | |
| PLUM | PENDING | 06/08/2026 | |
| BLD | COMPLETE | 06/08/2026 | 06/10/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/08/2026 | 06/10/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 4. List electrical sub contractor 2nd REQUEST | |||
| BADMIN | INFORMATION | 06/08/2026 | 06/08/2026 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RENAME PLANS TO A1.PDF, A2.PDF, A3.PDF | |||
| MECH | HOLD | 04/15/2026 | 04/16/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Are you replacing the AC system? If so provide AHRI document 2. List mechanical subcontractor in portal 3. All plan pages need to be uploaded separately. All engineered pages need to have a verifiable digital seal. All contractor design pages need to have company name and license number of subcontractor. | |||
| PLUM | HOLD | 04/15/2026 | 04/16/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plumbing scope of work needs to be applied for on this permit. Remove note saying that the plumbing work by separate permit. 2. Provide manufacturers specs on shower pan. 3. Provide plumbing riser diagram 4. List subcontractor in portal | |||
| BLD | HOLD | 04/15/2026 | 04/16/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. All plan pages need to be uploaded separately. All engineered pages need to have a verifiable digital seal. 2. Insulation needs to be a minimum of R38 or provide energy calcs showing R19 insulation passes energy code 3. Provide completed city of Palm Coast roofing worksheet | |||
| ELEC | HOLD | 04/15/2026 | 04/21/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Plans need to be seperated 2. Need correct outlet spacing in all bedrooms. NEC 2020 210.52 3. All outlets in garage need to be GFCI protected. NEC 2020 210.8 4. List electrical sub contractor | |||
| BLD | HOLD | 03/10/2026 | 03/11/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Engineering for truss repair/ replacement 2. Provide Completed Coit of Palm Coast Florida product approval worksheet from portal. 3. Provide Completed City of Palm Coast Roofing worksheet from portal | |||
| ELEC | HOLD | 03/10/2026 | 03/16/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Give a better scope of work for electrical and areas that will be worked on. 2. List electrical sub contractor | |||
| MECH | HOLD | 03/10/2026 | 03/11/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide scope of work and duct layout 2. List mechanical subcontractor | |||
| ZON | COMPLETE | 03/10/2026 | 03/10/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM no zoning review required | |||
| PLUM | HOLD | 03/10/2026 | 03/11/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide scope of work if any | |||
| ELEC | PENDING |