I want to search for...

Permit #2026031013

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7024-00390-0060
CONDITIONED SPACE: 1780 sqft
GARAGE: 391 sqft
OPENED PORCH (WITH ROOF) : 209 sqft
Total Square Footage: 2380 sqft
Block: 00390
Subdivision: 2167 - SECTION 24-PINE GROVE
Job Phone: 386-254-5081
Location Address: 129 PRITCHARD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/04/2026
NOC: RECORDED
Applicant name: WILLIAM BRYAN ADAMS SR
Owner: ADAMS HOMES OF NORTHWEST FLORIDA INC

Address

100 WEST GARDEN STREET

PENSACOLA, FL 32502

Address

SECOND FLOOR

PENSACOLA, FL 32502

Lot: 0060
Contracted Stated Job Value: ¤172,500.00
Job Description: Single Family Residence
Type: CN

Contractor

ADAMS HOMES OF NORTHWEST FLORIDA, INC
Status Location Address State License Number Phone
ACTIVE

3000 GULF BREEZE PARKWAY

GULD BREEZE, FL 32563

CRC1330146 (Exp: 08/31/2026) 386-254-5081

Sub Contractors

TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
ROBERTO F GONZALEZ
Status Location Address State License Number Phone
ACTIVE

212 PALMETTO AVE

CRESCENT CITY, FL 32112

RF11067887 (Exp: 08/31/2027) 286-559-2885
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
MONOLITHIC SLAB 06/10/2026 APPROVED MCONTRYMAN
Note: 6/9/2026 - PREVIOUS INSPECTION NOTES 6/9/26: NOT READY! NO FOOTERS OR STEEL INSTALLED. STILL BACKFILLING PLUMBING TRENCHES. NO NOTIFICATION TO CANCEL.
MONOLITHIC SLAB 06/09/2026 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/9/2026 9:34:00 AM *** 6/9/26: NOT READY! NO FOOTERS OR STEEL INSTALLED. STILL BACKFILLING PLUMBING TRENCHES. NO NOTIFICATION TO CANCEL.
PLUMBING 1ST ROUGH UNDERGROUND 06/05/2026 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 6/5/2026 1:07:01 PM *** This inspection was resulted in error. The inspection should have been approved. 6/5/26: 1). FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45 2). Main water line is not exposed and is not pressurized for inspection. Trench will need to be opened so piping is fully exposed and piping pressurized from meter or with a gauge if no meter by All Rough inspection at the latest.
PLUMBING 1ST ROUGH UNDERGROUND 06/05/2026 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 6/5/2026 1:08:44 PM *** 6/5/26: Plumbing 1st Rough Underground > Main underground water service pipe is not connected to the meter valve or ran to meter location as of today's inspection. Please complete prior to All Rough Inspection with the entire trench open for visual inspection during All Rough Inspection 2420.
FORMBOARD SURVEY (OFFICE USE ONLY) 06/04/2026 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/02/2026 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 05/14/2026 APPROVED ISANDERSON
Note: Tap 24 CL
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
LATH/BRICK/ WATER BARRIER
ALL ROUGH
Note: 6/5/26: From Inspection 2060 Plumbing 1st Rough Underground > Main underground water service pipe is not connected to the meter valve or ran to meter location as of today's inspection. Please complete prior to All Rough Inspection with the entire trench open for visual inspection during All Rough Inspection 2420.
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
DRYWALL NAILING
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
SW1 COMPLETE 06/04/2026 06/04/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/04/2026 06/04/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 06/01/2026 06/02/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/12/2026 05/12/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 04/20/2026 04/22/2026
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BLD COMPLETE 04/14/2026 04/17/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON HOLD 04/13/2026 04/14/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM 3rd request FRONT Porch is not shown on site plan. only an Entry way
SW1 COMPLETE 04/10/2026 04/10/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/06/2026 04/08/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
MECH COMPLETE 04/06/2026 04/06/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 04/06/2026 04/07/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM 2nd request Site plan: Porch not shown on site plan.
SW1 HOLD 04/06/2026 04/10/2026
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM 1) The right drinage pattern must have .30 from the toe of the drinage pattern to the top or the 10' off set on lot 7. 2) Grading plan must have existing elevations on a 20' grid at edge of pavement and centerline of road.
BLD CANCEL 04/06/2026 04/10/2026
SWALE COMPLETE 03/26/2026 04/01/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BLD HOLD 03/25/2026 03/31/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Soffits are larger that 12 inches wide. Provide soffit construction detail in accordance with Section R704.2.1 through R704.2.4.
CUSVC COMPLETE 03/25/2026 04/01/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 03/25/2026 03/30/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 03/25/2026 03/26/2026
Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Need to include FFE of home, garage, and patios.
GAS CANCEL 03/25/2026 03/26/2026
LOCATE COMPLETE 03/25/2026 03/26/2026
Note: Released By: IVAN SANDERSON - -
MECH HOLD 03/25/2026 03/27/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State Card needs to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 HOLD 03/25/2026 03/27/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please provide proposed elevations on grading plan.
ZON HOLD 03/25/2026 03/27/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Porch not shown on site plan. Walkway missing the width

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 05/04/2026
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/04/2026
FC IMPACT FEE LIBRARY ¤268.00 05/04/2026
FIRE RES IMPACT FEE 10-25 ¤942.00 05/04/2026
PARKS IMPACT FEE 10-25 ¤3,164.00 05/04/2026
RSI DRIVEWAY AFTER POUR ¤16.25 05/04/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 05/04/2026
RSI FORMBOARD REVIEW ¤16.25 05/04/2026
RSI PLAN REVIEW NEW ¤48.75 05/04/2026
RSI FNL SURVEY/GRADING CERT ¤48.75 05/04/2026
RSI ROW FINAL INSPECTION ¤16.25 05/04/2026
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 05/04/2026
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 05/04/2026
SURCHARGE FS 533.721 ¤12.51 05/04/2026
SURCHARGE - FS 468.631 ¤18.77 05/04/2026
SW ENG RES REVIEW 240 ¤240.00 05/04/2026
WATER METER W/ TAP ¤2,326.93 05/04/2026
TRANSP RES IMPACT FEE 10-25 ¤6,710.60 05/04/2026
WASTEWATER PERM INSPECTION ¤80.00 05/04/2026
WASTEWATER PERM REVIEW ¤25.00 05/04/2026
SEWER CAPITAL FACILITY ¤4,415.00 05/04/2026
WATER CAPITAL FACILITY FEE ¤3,790.49 05/04/2026
WATER PERMIT REVIEW ¤25.00 05/04/2026
WATER MAIN EXTENSION IMPACT ¤917.27 05/04/2026
SITE PLAN 30 ¤30.00 05/04/2026
WATER- TURN ON ¤50.00 05/04/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/04/2026
INSPECTION - RESIDENTIAL ¤951.50 05/04/2026
PLAN REVIEW - RESIDENTIAL ¤269.88 05/04/2026
REINSPECTION RESIDENTIAL ¤40.00
CONTRACTOR CHANGE ¤20.00
Fees Total Due: ¤60.00 Total Paid: ¤32,560.70