Permit #2026031067
Permit Details
Status: INSPECT
| Parcel Id: 04-11-30-5571-00000-3650 |
| CONDITIONED SPACE: 1501 sqft |
| GARAGE: 419 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| OPENED PORCH (WITH ROOF) : 115 sqft |
| Total Square Footage: 2107 sqft |
| Subdivision: 2366 - SOMERSET SUBDIVISION PH 2 |
| Job Phone: 904-596-6645 |
| Location Address: 92 GOLDEN BELL AVE |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/08/2026 |
| NOC: RECORDED |
| Applicant name: MICHAEL T HOLDER |
| Owner: KB HOME JACKSONVILLE LLC |
|
Address 10475 FORTUNE PARKWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 100 JACKSONVILLE, FL 32256 |
| Lot: 365 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
KB HOME JACKSONVILLE, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
10475 FORTUNE PKWY JACKSONVILLE, FL 32256 |
SUITE 100 JACKSONVILLE, FL 32256 |
CGC1509034 (Exp: 08/31/2026) | 904-596-6645 |
Sub Contractors
BOBBY WAYNE CAMPBELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
117 GUTHRIE ROAD GREEN COVE SPRINGS, FL 32043 |
CCC1326752 (Exp: 08/31/2026) | 904-200-1600 |
LARRY WILLIAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1750 EMERSON ST JACKSONVILLE, FL 32207 |
LI45034 (Exp: 08/31/2026) | 904-721-5431 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
COREY MICHAEL TENNANT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3370 AGRICULTURAL CNETER DR ST AUGUSTINE, FL 32092 |
CAC1819063 (Exp: 08/31/2026) | 904-829-8898 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
Inspection History
| Type | Request Date | Result | Inspector |
| DRYWALL NAILING | 06/09/2026 | APPROVED | JSTEWART |
| INSULATION | 06/04/2026 | APPROVED | JSTEWART |
| Note: 6/3/2026 - PREVIOUS INSPECTION NOTES Please repair air baffles, installed upside down, impeding maximum air flow. per manufacturer. | |||
| INSULATION | 06/03/2026 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/3/2026 2:13:56 PM *** Please seal spare bath exhaust duct at roof penetration. FBCR M1601.4.1 Please repair air baffles, installed upside down, impeding maximum air flow. per manufacturer. | |||
| LATH/BRICK/ WATER BARRIER | 06/03/2026 | APPROVED | JSTEWART |
| Note: 6/1/2026 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 06/01/2026 | CANCELLED BY APPLICANT | JSTEWART |
| ELECTRIC-TUG | 05/29/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email | |||
| ALL ROUGH | 05/29/2026 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/27/2026 | APPROVED | JSTEWART |
| Note: 5/22/2026 - PREVIOUS INSPECTION NOTES 1. Htt5 on garage left side is not nailed. 2. Missing all the straps on the front porch column and back porch column. 3. Missing all the engineering on the trusses. Need to check all. | |||
| ROOF VALLEY & METAL | 05/22/2026 | APPROVED | HCAMACHO |
| WALL SHEATHING | 05/22/2026 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/22/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Htt5 on garage left side is not nailed. 2. Missing all the straps on the front porch column and back porch column. 3. Missing all the engineering on the trusses. Need to check all. | |||
| GRAVITY SEWER TEST | 05/05/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/5/26 Via virtual --Main supply was hooked into meter at time of virtual inspection Inspector Notes from Inspection 2060 Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection 5/5/26 Via virtual --Main supply was hooked into meter at time of virtual inspection Inspector Notes from Inspection 2060 Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection 5/5/26 Via virtual --Main supply was hooked into meter at time of virtual inspection | |||
| SEWER TIE IN | 05/05/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/5/26 Via virtual --Main supply was hooked into meter at time of virtual inspection Inspector Notes from Inspection 2060 Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection | |||
| MONOLITHIC SLAB | 04/30/2026 | APPROVED | JSTEWART |
| Note: Footing depth is at 22" | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/24/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Main water supply line from utility connection to house shut off not installed, will need to be open for inspection at either sewer tie inspection / All Rough inspection | |||
| WATER METER INSTALLATION REQUEST | 04/24/2026 | APPROVED | ISANDERSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/23/2026 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | |||
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/23/2026 | 04/23/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/23/2026 | 04/23/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/27/2026 | 04/01/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/27/2026 | 04/02/2026 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 03/27/2026 | 03/31/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/27/2026 | 03/30/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/27/2026 | 03/30/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/27/2026 | 03/27/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 03/27/2026 | 03/30/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/27/2026 | 04/01/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/27/2026 | 03/30/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 03/27/2026 | 04/07/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤874.47 | 04/08/2026 |
| WATER- TURN ON | ¤50.00 | 04/08/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/08/2026 |
| INSPECTION - RESIDENTIAL | ¤822.25 | 04/08/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤233.22 | 04/08/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 04/08/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/08/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/08/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 04/08/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 04/08/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 04/08/2026 |
| RECLAIM WATER PERMIT INSPECTIO | ¤40.00 | 04/08/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 04/08/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 04/08/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 04/08/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 04/08/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 04/08/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 04/08/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 04/08/2026 |
| SURCHARGE FS 533.721 | ¤10.85 | 04/08/2026 |
| SURCHARGE - FS 468.631 | ¤16.28 | 04/08/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤5,658.77 | 04/08/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 04/08/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 04/08/2026 |
| SEWER CAPITAL FACILITY | ¤3,628.86 | 04/08/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,091.14 | 04/08/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 04/08/2026 |
| SITE PLAN 30 | ¤30.00 | 04/08/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤25,863.62 |