Permit #2026031156
Permit Details
Status: INSPECT
| Parcel Id: 04-11-30-5571-00000-1820 |
| CONDITIONED SPACE: 2003 sqft |
| CONDITIONED SPACE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2616 sqft |
| Subdivision: 2366 - SOMERSET SUBDIVISION PH 2 |
| Job Phone: 904-596-6645 |
| Location Address: 110 TEA OLIVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/13/2026 |
| NOC: RECORDED |
| Applicant name: MICHAEL T HOLDER |
| Owner: KB HOME JACKSONVILLE LLC |
|
Address 10475 FORTUNE PARKWAY JACKSONVILLE, FL 32256 |
|
Address SUITE 100 JACKSONVILLE, FL 32256 |
| Lot: 182 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
KB HOME JACKSONVILLE, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
10475 FORTUNE PKWY JACKSONVILLE, FL 32256 |
SUITE 100 JACKSONVILLE, FL 32256 |
CGC1509034 (Exp: 08/31/2026) | 904-596-6645 |
Sub Contractors
BOBBY WAYNE CAMPBELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
117 GUTHRIE ROAD GREEN COVE SPRINGS, FL 32043 |
CCC1326752 (Exp: 08/31/2026) | 904-200-1600 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
LARRY WILLIAMS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1750 EMERSON ST JACKSONVILLE, FL 32207 |
LI45034 (Exp: 08/31/2026) | 904-721-5431 |
COREY MICHAEL TENNANT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3370 AGRICULTURAL CNETER DR ST AUGUSTINE, FL 32092 |
CAC1819063 (Exp: 08/31/2026) | 904-829-8898 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - DRAINAGE | 05/29/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/22/26 WHILE CONDUCTING THE ROW STORMWATER FINAL OBSERVED EROSION AND SEDIMENT CONTROL ISSUES ON THIS ADJACENT PROPERTY OF 110 TEA OLIVE DR. ** SILT FENCE DOWN OR NOT IN EXISTENCE ALONG LEFT SIDE PROPERTY LINE ** CONSTRUCTION ENTRANCE HAS BEEN TORN UP MATTING IS NOT IN PLACE **BETWEEN THE LEFT FRONT CORNER OF STRUCTURE AND PROPERTY LINE LARGE MOND OF MATERIAL THAT WILL OBSTRUCT THE POSITIVE FLOW OF WATER TO THE CURB ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION OF 05/29/26 | |||
| ROW - DRAINAGE | 05/29/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: 05-29-26 TPOLACEK*** THEY ARE POURING DRIVEWAY TODAY APRON AREA IS HOLDING WATER FROM STORMS YESTERDAY. SILT FENCE IS NOW INTACT AND ALL OTHER ISSUES CORRECTED AT THIS TIME. 5/22/2026 - PREVIOUS INSPECTION NOTES ** 05/22/26 WHILE CONDUCTING THE ROW STORMWATER FINAL OBSERVED EROSION AND SEDIMENT CONTROL ISSUES ON THIS ADJACENT PROPERTY OF 110 TEA OLIVE DR. ** SILT FENCE DOWN OR NOT IN EXISTENCE ALONG LEFT SIDE PROPERTY LINE ** CONSTRUCTION ENTRANCE HAS BEEN TORN UP MATTING IS NOT IN PLACE **BETWEEN THE LEFT FRONT CORNER OF STRUCTURE AND PROPERTY LINE LARGE MOND OF MATERIAL THAT WILL OBSTRUCT THE POSITIVE FLOW OF WATER TO THE CURB ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION OF 05/29/26 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/27/2026 | APPROVED | EMADISON |
| Note: ** 05/27/26 ** READY TO POUR ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| DRYWALL NAILING | 05/22/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Master shower is not done. | |||
| DRYWALL NAILING | 05/22/2026 | APPROVED | HCAMACHO |
| Note: 5/22/2026 - PREVIOUS INSPECTION NOTES 1. Master shower is not done. | |||
| INSULATION | 05/20/2026 | APPROVED | HCAMACHO |
| Note: 5/19/2026 - PREVIOUS INSPECTION NOTES Roof needs to be shingled and vent boots installed to seal finish from weather. Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2467 Inspector Notes from Inspection 2450 On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| INSULATION | 05/19/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Roof needs to be shingled and vent boots installed to seal finish from weather. Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2467 Inspector Notes from Inspection 2450 On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| ELECTRIC-TUG | 05/15/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email. | |||
| LATH/BRICK/ WATER BARRIER | 05/15/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2467 Inspector Notes from Inspection 2450 On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| ALL ROUGH | 05/15/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: 1. Spare bath tub/shower insert needs 2x backing at the edges of the liner on both sides. (exterior wall no backing screws into 1/4" fiberboard sheathing, interior wall multiple screws miss the 2x). per manufacturer 2. No water preassure test (main water line at shut off broken). FBCR P2503.7 3. Seal dryer duct at roof penetration. FBCR M1601.4.1 4. seal spare bath exhaust duct at roof penetration. FBCR M1601.4.1 5. seal Hood exhaust duct at roof penetration. FBCR M1601.4.1 Will need completed prior to Insulation approval. Inspector Notes from Inspection 2467 Inspector Notes from Inspection 2450 On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Previous Note not rectified.....3. No truss packet onsite (engineering). FBC [A]107.3.1 Will need to have the paperwork onsite prior to All Rough approval. Inspector Notes from Inspection 2450 On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| ROOF VALLEY & METAL | 05/13/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2450 On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| WALL SHEATHING | 05/11/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: On the right side 10th stud from front needs nails.(shiners were removed, but no replacemment of fasteners). Will check at next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/11/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Unable to see HTT attachement at shearwall, tub is installed. [A]110.1 General 2. Back porch support post not installed (dry bottom post and straps). Per plan 3. No truss packet onsite (engineering). FBC [A]107.3.1 | |||
| GRAVITY SEWER TEST | 05/05/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/5/26 Via Virtual Supply connected but no water meter at time of virtual Inspection Inspector Notes from Inspection 2060 Supply not connected | |||
| SEWER TIE IN | 05/05/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/5/26 Via Virtual Supply connected but no water meter at time of virtual Inspection Inspector Notes from Inspection 2060 Supply not connected | |||
| MONOLITHIC SLAB | 04/22/2026 | APPROVED | JSTEWART |
| Note: Footing depth 21". | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/20/2026 | APPROVED - AS NOTED | KSANDOE |
| Note: Supply not connected | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/16/2026 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 04/15/2026 | APPROVED | ISANDERSON |
| U-CROSS CONNECTION | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| ELECTRIC - EARLY POWER | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/16/2026 | 04/16/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/16/2026 | 04/16/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/15/2026 | 04/15/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Site benchmark 15 does not match approved grading plan. Please confirm and revise accordingly. | |||
| ZON | COMPLETE | 04/15/2026 | 04/15/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 03/31/2026 | 04/08/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2026 | 04/06/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 03/30/2026 | 04/02/2026 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 03/30/2026 | 04/06/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/30/2026 | 04/02/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/30/2026 | 03/31/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤874.47 | 04/13/2026 |
| WATER- TURN ON | ¤50.00 | 04/13/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/13/2026 |
| INSPECTION - RESIDENTIAL | ¤1,179.75 | 04/13/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤334.62 | 04/13/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 04/13/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/13/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/13/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 04/13/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 04/13/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 04/13/2026 |
| RECLAIM WATER PERMIT INSPECTIO | ¤40.00 | 04/13/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 04/13/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 04/13/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 04/13/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 04/13/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 04/13/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 04/13/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 04/13/2026 |
| SURCHARGE FS 533.721 | ¤15.44 | 04/13/2026 |
| SURCHARGE - FS 468.631 | ¤23.17 | 04/13/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤9,187.49 | 04/13/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 04/13/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 04/13/2026 |
| SEWER CAPITAL FACILITY | ¤3,628.86 | 04/13/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,091.14 | 04/13/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 04/13/2026 |
| SITE PLAN 30 | ¤30.00 | 04/13/2026 |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| Fees | Total Due: ¤70.00 | Total Paid: ¤29,862.72 |