Permit #2026040093
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7017-00010-0430 |
| Block: 00010 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: 386-986-0603 |
| Location Address: 115 BOULDER ROCK DR |
| Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION |
| Issue Date: 04/21/2026 |
| NOC: RECORDED |
| Applicant name: KENNETH MARTIN REED |
| Owner: REIFER LIANE W LIFE ESTATE |
|
Address 115 BOULDER ROCK DRIVE PALM COAST, FL 32137 |
| Lot: 0430 |
| Contracted Stated Job Value: ¤15,500.00 |
| Job Description: ROOF REPAIR |
| Type: CN |
Contractor
R & K CERTIFIED ROOFING OF FLORIDA INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
83 LANCELOT BUNNELL, FL 32110 |
CGC1526358 (Exp: 08/31/2026) | 386-446-3100 | 386-445-6074 |
Sub Contractors
KENNETH MARTIN REED
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
83 LANCELOT DRIVE BUNNELL , FL 32110 |
CCC1328712 (Exp: 08/31/2026) | 386-446-3100 | 386-445-6074 |
Inspection History
| Type | Request Date | Result | Inspector |
| ALL ROUGH | 04/30/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. HVAC incomplete. Distribution box is damaged (crushed) and missing duct work, and ceiling boots. Needs to be replaced and duct work installed, supported, and sealed. FBCR M1601.4.4 / FBCR M1601.4.1 2. Existing romex line for ceiling outlet (currently connected to a ceiling fan, hanging from rafters) needs to be installed and fastened to code. NEC 314.23(B / NEC 334.30 NOTE: At insulation inspection Air baffles will need to be installed to code, and any Top plate Penetrations will need to be fire stopped. Inspector Notes from Inspection 2467 1st visit, new underlament was ran overlapping existing shingles, new underlayment is required to extend under existing shigles and overlap existing underlayment. 2nd re inspection was a live virtual with contractor to show corrections. 4/28/2026 - PREVIOUS INSPECTION NOTES Not ready, still installing framing, and roof sheathing not installed, no underlayment, no metal. Reschedule when 100% ready. | |||
| ROOF VALLEY & METAL | 04/29/2026 | APPROVED - AS NOTED | JSTEWART |
| Note: 1st visit, new underlament was ran overlapping existing shingles, new underlayment is required to extend under existing shigles and overlap existing underlayment. 2nd re inspection was a live virtual with contractor to show corrections. 4/28/2026 - PREVIOUS INSPECTION NOTES Not ready, still installing framing, and roof sheathing not installed, no underlayment, no metal. Reschedule when 100% ready. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/29/2026 | APPROVED | JSTEWART |
| Note: 4/28/2026 - PREVIOUS INSPECTION NOTES Not Ready, till framing, and plywood gussets need installed and screw pattern per plan. Reschedule when 100% ready. | |||
| ROOF VALLEY & METAL | 04/28/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Not ready, still installing framing, and roof sheathing not installed, no underlayment, no metal. Reschedule when 100% ready. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/28/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Not Ready, till framing, and plywood gussets need installed and screw pattern per plan. Reschedule when 100% ready. | |||
| PROJECT STATUS (OFFICE USE) | 04/27/2026 | APPROVED - AS NOTED | RMARTIN |
| Note: First thing in the morning - Requested by applicant. They want to start work that day. 4/27/26 Work being done in master bed room. Drywall and insulation is out of the ceiling, two supply ducts off boots in two pieces. No electrical done. will need to schedule all inspections on permit, do not cover until inspections pass. | |||
| ALL ROUGH | |||
| Note: 4/30/2026 - PREVIOUS INSPECTION NOTES 1. HVAC incomplete. Distribution box is damaged (crushed) and missing duct work, and ceiling boots. Needs to be replaced and duct work installed, supported, and sealed. FBCR M1601.4.4 / FBCR M1601.4.1 2. Existing romex line for ceiling outlet (currently connected to a ceiling fan, hanging from rafters) needs to be installed and fastened to code. NEC 314.23(B / NEC 334.30 NOTE: At insulation inspection Air baffles will need to be installed to code, and any Top plate Penetrations will need to be fire stopped. Inspector Notes from Inspection 2467 1st visit, new underlament was ran overlapping existing shingles, new underlayment is required to extend under existing shigles and overlap existing underlayment. 2nd re inspection was a live virtual with contractor to show corrections. 4/28/2026 - PREVIOUS INSPECTION NOTES Not ready, still installing framing, and roof sheathing not installed, no underlayment, no metal. Reschedule when 100% ready. | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/17/2026 | 04/21/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 04/13/2026 | 04/14/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/13/2026 | 04/14/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/13/2026 | 04/14/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM House plan submitted for layout does not match plan page CS. Picture is of a duplex | |||
| BLD | HOLD | 04/02/2026 | 04/10/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please provide truss layout and floor plan indicating section to be repaired. | |||
| ELEC | CANCEL | 04/02/2026 | 04/06/2026 |
| PLUM | HOLD | 04/02/2026 | 04/06/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM List subcontractor | |||
| ZON | COMPLETE | 04/02/2026 | 04/06/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/02/2026 | 04/06/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout showing ductwork being replaced List subcontractor |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/21/2026 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 04/21/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 04/21/2026 |
| SURCHARGE FS 533.721 | ¤2.00 | 04/21/2026 |
| SURCHARGE - FS 468.631 | ¤2.33 | 04/21/2026 |
| SITE PLAN 30 | ¤30.00 | 04/21/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤189.33 |