I want to search for...
Permit #2026040169
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7025-00360-0080 |
| Block: 00360 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 301-543-3860 |
| Location Address: 1 PEYTON PL |
| Type: PO - POOL |
| Issue Date: 05/12/2026 |
| NOC: RECORDED |
| Applicant name: ALAN KENDRICK WALKER |
| Owner: HOLBROOK WAYNE WILLARD & DAMARIS H&W |
|
Address 1 PEYTON PL PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤75,600.00 |
| Job Description: POOL, AND ENCLOSURE BY OTHERS |
| Type: CN |
Contractor
ANTHONY & SYLVAN CORP.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3739 N. EASTON ROAD DOYLESTOWN, PA 18902 |
CPC1459629 (Exp: 08/31/2026) | 301-543-3860 |
Sub Contractors
TIMOTHY ALLAN VOELZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
11630-2 COLUMBIA PARK DR E JACKSONVILLE, FL 32258 |
EC13008060 (Exp: 08/31/2026) | 904-575-0939 |
Inspection History
| Type | Request Date | Result | Inspector |
| STEEL AND GROUND | 06/01/2026 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/1/2026 10:38:13 AM *** 6/1/26: At the time of Inspection all of the Florida Building Code & City Code requirements along with any Plan requirements related to this inspection have been met. It is the sole responsibility of the Contractor to assure that everything remains in complete compliance as rain is imminent today. 5/29/2026 - PREVIOUS INSPECTION NOTES 5/29/26: 1). Excessive cave-in at multiple points has minimized rebar clearance to below the 3" minimum required. FBC-R404.1.3.3.7.4 / FBC [A]107.4 2). House side gauge is only reading 30psi at the time of the inspection. 35psi is required for inspection. FBC-R4101.12.1 5/28/2026 - PREVIOUS INSPECTION NOTES Double floor drains, and associated underground plumbing requires a preassure test. R4501.12.1 Pressure test. | |||
| STEEL AND GROUND | 05/29/2026 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/29/2026 12:57:43 PM *** 5/29/26: 1). Excessive cave-in at multiple points has minimized rebar clearance to below the 3" minimum required. FBC-R404.1.3.3.7.4 / FBC [A]107.4 2). House side gauge is only reading 30psi at the time of the inspection. 35psi is required for inspection. FBC-R4101.12.1 5/28/2026 - PREVIOUS INSPECTION NOTES Double floor drains, and associated underground plumbing requires a preassure test. R4501.12.1 Pressure test. | |||
| STEEL AND GROUND | 05/28/2026 | Disapproved - NO FEE | JSTEWART |
| Note: Double floor drains, and associated underground plumbing requires a preassure test. R4501.12.1 Pressure test. | |||
| POOL DECK | |||
| ELECTRIC AND ALARM | |||
| POOL FINAL | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 05/11/2026 | 05/12/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/30/2026 | 05/05/2026 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM Cannot release until enclosure is applied for | |||
| RSI | COMPLETE | 04/30/2026 | 05/06/2026 |
| Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM SEE NOTES LEFT ON YOUR PROPOSED SITE PLAN YOU CAN DRAIN THE LEFT SIDE INTO THE CITIES DRAINAGE EASEMENTAS IT WAS WAS DONE WHEN THE PROPOERTY CLOSED. | |||
| ELEC | COMPLETE | 04/30/2026 | 05/04/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/22/2026 | 04/23/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Cannot release until enclosure is applied for | |||
| ELEC | HOLD | 04/22/2026 | 04/27/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Bonding detail needs to include wire sizes, connections and what else would be bonded. NEC 2020 680.26 2. You dont give any deatils. | |||
| RSI | HOLD | 04/22/2026 | 04/27/2026 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Must show how you will drain the water behind the pool. need more arrows to show the drainage behind pool. | |||
| BLD | COMPLETE | 04/22/2026 | 04/27/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/10/2026 | 04/13/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Bonding detail needs to be on your engineered plans. | |||
| ZON | HOLD | 04/10/2026 | 04/13/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM 1- cannot upload site plan/pool plan all as one, need to separate. 2-site plan missing pool equipment pad/location 3- Cannot release until enclosure is applied for | |||
| RSI | HOLD | 04/10/2026 | 04/16/2026 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM The new site plan needs to be an old survey that shows area where pool will be constructed and must have flow arrows to show the new drainage of the lot. | |||
| BFLOOD | CANCEL | 04/05/2026 | 04/06/2026 |
| BLD | COMPLETE | 04/05/2026 | 04/08/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/05/2026 | 04/06/2026 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical bonding detail. NEC 2020 680.26 | |||
| MECH | COMPLETE | 04/05/2026 | 04/06/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| RSI | HOLD | 04/05/2026 | 04/09/2026 |
| Note: Held By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM 4/9/26 YOU ARE REQUIRED TO SHOW FLOW ARROWS FOR YOUR DRAINAGE PATTERN OFF OFF ALL SIDE OF YOUR POO TO ENSURE IT MEETS COPC STANDARDS. | |||
| ZON | HOLD | 04/05/2026 | 04/07/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM 1-site plan missing pool equipment pad/location 2-application says enclosure but site plan says enclosure by others? 3-upload new application or screen enclosure plans to complete review |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/29/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 05/12/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 05/12/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 05/12/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 05/12/2026 |
| SURCHARGE FS 533.721 | ¤2.55 | 05/12/2026 |
| SURCHARGE - FS 468.631 | ¤3.83 | 05/12/2026 |
| SITE PLAN 30 | ¤30.00 | 05/12/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/12/2026 |
| INSPECTION- POOL | ¤160.00 | 05/12/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 05/12/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤493.88 |