I want to search for...
Permit #2026040321
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7012-00160-0510 |
| Block: 00160 |
| Subdivision: 2187 - SECTION 12-BELLE TERRE |
| Job Phone: 386-931-9006 |
| Location Address: 40 BASSETT LN |
| Type: DR - DRIVEWAY |
| Issue Date: 04/16/2026 |
| NOC: RECORDED |
| Applicant name: JOSE CARLOS AZEVEDO |
| Owner: CALHOUN JIMMIE L SR & TRACY H&W & JIMMIE L JR JTWR |
|
Address 40 BASSETT LN PALM COAST, FL 32137 |
| Lot: 0510 |
| Contracted Stated Job Value: ¤12,400.00 |
| Job Description: Remove and Replace Concrete Driveway |
| Type: CN |
Contractor
S & D CONSTRUCTION AND MAINTENANCE
| Status | Location Address | Phone |
| ACTIVE |
37 PRICE LANE PALM COAST, FL 32164 |
386-931-9006 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 06/11/2026 | APPROVED - AS NOTED | TPOLACEK |
| Note: 06-11-26 TPOLACEK*** CULVERT PIPE NEEDS TO BE CLEANED OUT, ALL BARE GROUND MUST BE STABILIZED WITH SOD. I WILL HOLD THIS ON THE FINAL ROW INSPECTION. APPROVING AFTER POUR AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9270 ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW - FINAL INSPECTION | 06/11/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 06-11-26 TPOLACEK*** CULVERT PIPE NEEDS TO BE CLEANED OUT, ALL BARE GROUND MUST BE STABILIZED WITH SOD. I WILL HOLD THIS ON THE FINAL ROW INSPECTION. APPROVING AFTER POUR AS NOTED. Inspector Notes from Inspection 9270 ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/11/2026 | APPROVED | BVEIGA |
| ROW- PRE-APRON (PRE-POUR) | 05/14/2026 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/13/2026 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/12/2026 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW - FINAL INSPECTION | |||
| Note: 6/11/2026 - PREVIOUS INSPECTION NOTES 06-11-26 TPOLACEK*** CULVERT PIPE NEEDS TO BE CLEANED OUT, ALL BARE GROUND MUST BE STABILIZED WITH SOD. I WILL HOLD THIS ON THE FINAL ROW INSPECTION. APPROVING AFTER POUR AS NOTED. Inspector Notes from Inspection 9270 ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/08/2026 | 04/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 04/08/2026 | 04/08/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 04/08/2026 | 04/08/2026 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/08/2026 | 04/09/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/08/2026 | 04/10/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 06/10/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 04/16/2026 |
| RSI SITE PLAN REVIEW | ¤16.25 | 04/16/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 04/16/2026 |
| SITE PLAN 15 | ¤15.00 | 04/16/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/16/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 04/16/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 04/16/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤401.25 |