Permit #2026040321

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7012-00160-0510
Block: 00160
Subdivision: 2187 - SECTION 12-BELLE TERRE
Job Phone: 386-931-9006
Location Address: 40 BASSETT LN
Type: DR - DRIVEWAY
Issue Date: 04/16/2026
NOC: RECORDED
Applicant name: JOSE CARLOS AZEVEDO
Owner: CALHOUN JIMMIE L SR & TRACY H&W & JIMMIE L JR JTWR

Address

40 BASSETT LN

PALM COAST, FL 32137

Lot: 0510
Contracted Stated Job Value: ¤12,400.00
Job Description: Remove and Replace Concrete Driveway
Type: CN

Contractor

S & D CONSTRUCTION AND MAINTENANCE
Status Location Address Phone
ACTIVE

37 PRICE LANE

PALM COAST, FL 32164

386-931-9006

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 06/11/2026 APPROVED - AS NOTED TPOLACEK
Note: 06-11-26 TPOLACEK*** CULVERT PIPE NEEDS TO BE CLEANED OUT, ALL BARE GROUND MUST BE STABILIZED WITH SOD. I WILL HOLD THIS ON THE FINAL ROW INSPECTION. APPROVING AFTER POUR AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9270 ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW - FINAL INSPECTION 06/11/2026 Disapproved - NO FEE TPOLACEK
Note: 06-11-26 TPOLACEK*** CULVERT PIPE NEEDS TO BE CLEANED OUT, ALL BARE GROUND MUST BE STABILIZED WITH SOD. I WILL HOLD THIS ON THE FINAL ROW INSPECTION. APPROVING AFTER POUR AS NOTED. Inspector Notes from Inspection 9270 ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
U -UTILITY RESIDENTIAL FINAL 06/11/2026 APPROVED BVEIGA
ROW- PRE-APRON (PRE-POUR) 05/14/2026 APPROVED - AS NOTED EMADISON
Note: ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW- PRE-APRON (PRE-POUR) 05/13/2026 CANCELLED BY APPLICANT TPOLACEK
Note: RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW- PRE-APRON (PRE-POUR) 05/12/2026 Disapproved -FEE REQUIRED TPOLACEK
Note: PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW - FINAL INSPECTION
Note: 6/11/2026 - PREVIOUS INSPECTION NOTES 06-11-26 TPOLACEK*** CULVERT PIPE NEEDS TO BE CLEANED OUT, ALL BARE GROUND MUST BE STABILIZED WITH SOD. I WILL HOLD THIS ON THE FINAL ROW INSPECTION. APPROVING AFTER POUR AS NOTED. Inspector Notes from Inspection 9270 ** 05/14/26 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________________ 5/13/2026 - PREVIOUS INSPECTION NOTES RECIEVED TEXT FROM CARLOS ASKING TO CANCEL INSPECTION 5/12/2026 - PREVIOUS INSPECTION NOTES PIPE IS PITCHED IN THE WRONG DIRECTION. 11 Culvert cannot flow more than a tenth in the right direction Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/08/2026 04/10/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
RSI COMPLETE 04/08/2026 04/08/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
UTL COMPLETE 04/08/2026 04/08/2026
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 04/08/2026 04/09/2026
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
SWALE COMPLETE 04/08/2026 04/10/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 06/10/2026
RSI ROW FINAL INSPECTION ¤16.25 04/16/2026
RSI SITE PLAN REVIEW ¤16.25 04/16/2026
SW ENG RES REVIEW 240 ¤240.00 04/16/2026
SITE PLAN 15 ¤15.00 04/16/2026
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/16/2026
RSI DRIVEWAY AFTER POUR ¤16.25 04/16/2026
RSE DRIVE PRE POUR INSPECTION ¤32.50 04/16/2026
Fees Total Due: ¤0.00 Total Paid: ¤401.25