Permit #2026040403
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7025-00210-0380 |
| Total Square Footage: 861 sqft |
| Block: 00210 |
| Subdivision: 2189 - SECTION 25-PINE GROVE |
| Job Phone: 386-503-0666 |
| Location Address: 62 PENNSYLVANIA LN |
| Type: DR - DRIVEWAY |
| Issue Date: 04/14/2026 |
| NOC: Unknown |
| Applicant name: ANTONIO M PAIVA |
| Owner: 62 PENNSYLVANIA LANE LLC |
|
Address 11 CEDARDALE CT PALM COAST, FL 32137 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤4,500.00 |
| Job Description: Replace existing driveway from 16ft to 21ft - Concrete |
| Type: CN |
Contractor
AVANTI CONCRETE PUMPING INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 351743 SATSUMA, FL 32189 |
386-503-0666 | 386-586-7687 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 05/11/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 5/11/26 I AM GOING TO PASS YOUR AFTERPOUR INSPECTION, BUT YOU ARE REQUIRED TO ADD DIRT AND BRING UP THE LEFT SIDE OUT OF THE CULVERT TO FLOWABLE GRADE. YOUR SOD IS CURRENTLY BELOW THE BOTTOM OF THE CULVERT PIPE. YOU NEED TO PUMP OUT WATER ADD AND COMPACT DIRT TO FLUSH WITH CULVERT PIPE BOTTOM AND ADD SOD ON TOP BEFORE FINAL WILL BE PASSED. SEE PHOTO FOR REFERENCE. | |||
| ROW - FINAL INSPECTION | 05/11/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 5/11/26 YOU ARE REQUIRED TO ADD DIRT AND BRING UP THE LEFT SIDE OUT OF THE CULVERT TO FLOWABLE GRADE. YOUR SOD IS CURRENTLY BELOW THE BOTTOM OF THE CULVERT PIPE. YOU NEED TO PUMP OUT WATER ADD AND COMPACT DIRT TO FLUSH WITH CULVERT PIPE BOTTOM AND ADD SOD ON TOP BEFORE FINAL WILL BE PASSED. SEE PHOTO FOR REFERENCE | |||
| U -UTILITY RESIDENTIAL FINAL | 05/11/2026 | FINAL APPROVED | BHAINES |
| ROW- PRE-APRON (PRE-POUR) | 04/27/2026 | APPROVED | FSLADISH |
| Note: 4/27/26 PIPE INVERT IS GOOD AT TIME OF THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED. DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER AND VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW - FINAL INSPECTION | |||
| Note: 5/11/2026 - PREVIOUS INSPECTION NOTES 5/11/26 YOU ARE REQUIRED TO ADD DIRT AND BRING UP THE LEFT SIDE OUT OF THE CULVERT TO FLOWABLE GRADE. YOUR SOD IS CURRENTLY BELOW THE BOTTOM OF THE CULVERT PIPE. YOU NEED TO PUMP OUT WATER ADD AND COMPACT DIRT TO FLUSH WITH CULVERT PIPE BOTTOM AND ADD SOD ON TOP BEFORE FINAL WILL BE PASSED. SEE PHOTO FOR REFERENCE |
Review History
| Department | Status | Date In | Date Out |
| SWALE | COMPLETE | 04/10/2026 | 04/14/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/09/2026 | 04/14/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 04/09/2026 | 04/09/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 04/09/2026 | 04/10/2026 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/09/2026 | 04/10/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/14/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 04/14/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 04/14/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 04/14/2026 |
| RSI SITE PLAN REVIEW | ¤16.25 | 04/14/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 04/14/2026 |
| SITE PLAN 15 | ¤15.00 | 04/14/2026 |
| RSI REINSPECTION 1 | ¤35.00 | |