I want to search for...

Permit #2026040804

Permit Details

Status: INSPECT

Parcel Id: 48-11-31-1700-00000-0330
CONDITIONED SPACE: 530 sqft
Total Square Footage: 530 sqft
Block: 00000
Subdivision: 2086 - ESTATES AT GRAND HAVEN PHASE I
Job Phone: 386-527-5887
Location Address: 142 WILLOW OAK WAY
Type: BA - BUILDING ADDITION
Issue Date: 05/20/2026
NOC: RECORDED
Applicant name: DAVID A DIXON
Owner: CAPPS CHRISTINE MARIE & TYLER KRISTOPHER W&H

Address

142 WILLOW OAK WAY

PALM COAST, FL 32137

Lot: 0330
Contracted Stated Job Value: ¤125,000.00
Job Description: Bonus Room Addition
Type: CN

Contractor

DAVID DIXON CUSTOM HOMES & REMODELING INC
Status Location Address Mailing Address State License Number Phone
ACTIVE

DAVID A DIXON

PALM COAST, FL 32137

263 BEACHWAY DRIVE

PALM COAST, FL 32137

CBC1258501 (Exp: 08/31/2026) 386-527-5887

Sub Contractors

STEVEN DUANE DENSLOW
Status Location Address State License Number Phone Fax
ACTIVE

317 RIO PINR DR

Ormond Beach, FL 32174

EC0001678 (Exp: 08/31/2026) 386-233-1553 386-673-5994
HEATH EDWARD SANFORD
Status Location Address State License Number Phone Fax
ACTIVE

20 SEA SERPENT TRAIL E

PALM COAST, FL 32164

CFC1434086 (Exp: 08/31/2026) 386-451-1897 386-445-5575
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280

Inspection History

Type Request Date Result Inspector
MONOLITHIC SLAB 06/05/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 6/5/26 1. Footer for addition is okay. There was another footer prepped for a screen enclosure beam that was not on the plans. Contractor said he was waiting on the engineer for the plans and permit. Cannot pour the screen enclosure footer until a permit has been issued and inspected
PLUMBING 1ST ROUGH UNDERGROUND 06/03/2026 APPROVED - AS NOTED HCAMACHO
Note: 1. sink drain for the new room inn the rear. Note: Using a lift pump and 2" connection to the main sewer. Please don't forget to call for a Sewer Tie In when ready.
SEWER TIE IN
ELEV CERT-FOUNDATION APPROVAL
ELEVATION CERTIFICATE-FINAL APPROVAL
FOUND SURVEY APPROVED (OFFICE)
DOWN CELL
LATH/BRICK/ WATER BARRIER
TIE BEAM / LINTEL
ALL ROUGH
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
DRYWALL NAILING
BLD - BUILDING FINAL
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
PLFM COMPLETE 05/20/2026 05/20/2026
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction Elevation Certificate has been approved. Please provide Foundation and Final prior to CO.
BADMIN INFORMATION 05/20/2026 05/20/2026
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM ELEVATION CERTIFICATE NOT UPLOADED
PLFM HOLD 05/19/2026 05/20/2026
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A9b should be No, A9c-e should be 0. B5 the suffix is E not F. B9 has to be to the tenth. C2b and c cannot be left blank, they should say N/A if there is no elevation. C2e is missing the measurement box checked. C2f and g, there are no elevations shown adjacent to the addition with those elevations. Please review the submitted grading plan and revise.
PLFM HOLD 05/13/2026 05/13/2026
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Due to the close proximity of the Flood Zone line to the structure, elevation certificates will be required at construction drawings and foundation. If at foundation, the structure remains outside of the SFHA, a final elevation certificate will not be required.
ENGIN1 COMPLETE 05/13/2026 05/19/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
RSI COMPLETE 05/13/2026 05/19/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
PLFM HOLD 05/07/2026 05/12/2026
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Revise site plan to show flood zone lines and elevations, both existing and proposed. Additional comments may apply when revision is received.
BLD COMPLETE 05/05/2026 05/07/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 05/05/2026 05/07/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 04/27/2026 04/28/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 04/27/2026 04/29/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM rejected plans: sides of the plans are labeled incorrectly proposed rightside is the left and left is the right side.
BLD HOLD 04/27/2026 04/28/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Upload all plan pages individually. Missing pages. AHJ 2. Each plan page needs to be digitally signed and sealed and have a verifiable digital signature F.S.471.025
ELEC COMPLETE 04/27/2026 05/04/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLUM COMPLETE 04/27/2026 04/28/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 04/20/2026 04/20/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Plans need to be uploaded in single format
ELEC HOLD 04/20/2026 04/20/2026
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Plans need to be uploaded in single format
ENGIN1 COMPLETE 04/20/2026 04/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
MECH HOLD 04/20/2026 04/21/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide energy calcs, heatload and duct layout
PLUM CANCEL 04/20/2026 04/21/2026
RSI COMPLETE 04/20/2026 04/22/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM This permit needs a final survey due to addition is 300sqft or more. Note to contractor if the addition obstructs the drainage in any way then you will need to fix so grade meets city standards.
ZON HOLD 04/20/2026 04/22/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM plans: sides of the plans are labeled incorrectly proposed rightside is the left and left is the right side. Color sheet missing provide a color sheet make sure to state it will match exiisting for the color of the home
BLD HOLD 04/20/2026 04/23/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Roofing worksheet FL# 101626 not valid.
PLUM HOLD 04/20/2026 04/21/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THIS IS CORRECT REVIEW. PREVIOUS WAS CANCELED IN ERROR Provide plumbing scope of work for plumbing

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/20/2026
INSPECTION - RESIDENTIAL ¤343.75 05/20/2026
PLAN REVIEW - RESIDENTIAL ¤97.50 05/20/2026
RSI PLAN REVIEW NEW ¤48.75 05/20/2026
RSI ROW FINAL INSPECTION ¤16.25 05/20/2026
SURCHARGE FS 533.721 ¤4.71 05/20/2026
SURCHARGE - FS 468.631 ¤7.07 05/20/2026
TRANSP RES IMPACT FEE 10-25 ¤1,998.10 05/20/2026
SITE PLAN 30 ¤30.00 05/20/2026
Fees Total Due: ¤0.00 Total Paid: ¤2,576.13