I want to search for...
Permit #2026041306
Permit Details
Status: APPLY
| Parcel Id: 22-10-30-3755-00000-0490 |
| CONDITIONED SPACE: 1808 sqft |
| GARAGE: 579 sqft |
| OPENED PORCH (WITH ROOF) : 386 sqft |
| Total Square Footage: 2773 sqft |
| Subdivision: 2357 - LAKEVIEW ESTATES TRACT 1 |
| Job Phone: 904-422-5276 |
| Location Address: 82 LAKE MANATEE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| NOC: NO DOCUMENTATION |
| Applicant name: MATTHEW JAMES HENSON |
| Owner: PULTE HOME COMPANY LLC |
|
Address 12724 GRAN BAY PARKWAY WEST JACKSONVILLE, FL 32258 |
|
Address SUITE 200 JACKSONVILLE, FL 32258 |
| Lot: 49 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: New SFD |
| Type: CN |
Contractor
PULTE HOME COMPANY LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
12724 GRAN BAY DRIVE PKWAY W , |
SUITE 140 JACKSONVILLE, FL 32258 |
CGC1514865 (Exp: 08/31/2026) | 904-422-5276 |
Sub Contractors
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
BRITT MICHAEL JENKINS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
86 COLUMBIA DR POOLER, GA 31322 |
CFC1430770 (Exp: 08/31/2026) | 912-330-8151 |
PHILLIP F GABY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 56726 JACKSONVILLE, FL 32256 |
CCC1330190 (Exp: 08/31/2026) | 904-424-4665 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
Inspection History
| Type | Request Date | Result | Inspector |
| FORMBOARD SURVEY (OFFICE USE ONLY) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| MONOLITHIC SLAB | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| WALL SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL | |||
| WATER METER INSTALLATION REQUEST | |||
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| ZON | HOLD | 05/29/2026 | 05/29/2026 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM 2nd request 1. Site plan can't have any drainage/elevation. 2. Elevation plan missing roof pitch. | |||
| URB | COMPLETE | 05/29/2026 | 06/01/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/29/2026 | 06/04/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Structural plans does not agree with drainage plan. From the top of foundation to the bottom of the footer shall be 22" at the front left corner, the structural plans show 20". Please revise structural plan to match grading plan. This will mitigate errors later in the construction process. | |||
| BLD | HOLD | 05/29/2026 | 06/01/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Plan sheet needs to be digitally signed, sealed, and verifiable. | |||
| BLD | COMPLETE | 04/30/2026 | 05/05/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/30/2026 | 05/01/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/30/2026 | 05/04/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/30/2026 | 05/01/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/30/2026 | 04/30/2026 |
| LOCATE | COMPLETE | 04/30/2026 | 04/30/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 04/30/2026 | 05/01/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/30/2026 | 05/07/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There are slopes greater than 4:1 on both sides of this home near the front. Please revise. | |||
| ZON | HOLD | 04/30/2026 | 05/05/2026 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Site plan can't have any drainage/elevation. 2. Elevation plan missing roof pitch. | |||
| URB | HOLD | 04/30/2026 | 05/07/2026 |
| Note: Held By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM Need to add one additional tree for this lot size. | |||
| ZON | PENDING | ||
| BLD | PENDING | ||
| SW1 | PENDING |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | |
| WATER METER W/OUT TAP | ¤965.03 | |
| SEWER CAPITAL FACILITY | ¤3,725.72 | |
| WATER CAPITAL FACILITY FEE | ¤3,150.44 | |
| Fees | Total Due: ¤7,891.19 | Total Paid: ¤0.00 |