Permit #2026050228
Permit Details
Status: INSPECT
| Parcel Id: 21-12-31-5560-00000-0860 |
| CONDITIONED SPACE: 1501 sqft |
| GARAGE: 403 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| Total Square Footage: 2023 sqft |
| Subdivision: 2336 - SEMINOLE PALMS SUBDIVISION PHASE 1 |
| Job Phone: 407-717-5418 |
| Location Address: 272 MONTGOMERY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/18/2026 |
| NOC: RECORDED |
| Applicant name: CARLOS ANTONIO SERRANO |
| Owner: NVR INC |
|
Address 8649 BAYPINE ROAD JACKSONVILLE, FL 32256 |
|
Address BUILDING 5 SUITE 202 JACKSONVILLE, FL 32256 |
| Lot: 86 |
| Contracted Stated Job Value: ¤161,536.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
RYAN HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
8649 BAYPINE RD JACKSONVILLE, FL 32256 |
BLDG 7, STE 202 JACKSONVILLE, FL 32256 |
CBC1256450 (Exp: 08/31/2026) | 407-717-5418 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
BRITT MICHAEL JENKINS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
86 COLUMBIA DR POOLER, GA 31322 |
CFC1430770 (Exp: 08/31/2026) | 912-330-8151 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF SHEATHING | 06/11/2026 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 06/11/2026 | APPROVED | RSIMS |
| WALL SHEATHING | 06/10/2026 | APPROVED - AS NOTED | RSIMS |
| Note: 6/10/26: 1). finish removing shiners and re-nail where needed. (in progress at time of inspection). | |||
| SEWER TIE IN | 05/28/2026 | APPROVED | RSIMS |
| Note: 5/28/26: ***Main underground water service piping is installed from house to meter location and a pressure test with gauge has been applied. Only the Meter connection will need to be checked prior to Final Inspection. 5/27/2026 - PREVIOUS INSPECTION NOTES 5/27/26: Cancelled by Applicant in person. Not ready yet. Inspector Notes from Inspection 2060 5/26/26: Rain has caused excessive cave-in which has buried the tie-in connection. 1). Please have sewer tie-in exposed for inspection. FBC [A]110.1 NOTE: Main water line is run from meter to house but will require a gauge and pressure test. FBCR P2503.7 ***** Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| MONOLITHIC SLAB | 05/28/2026 | APPROVED | RSIMS |
| SEWER TIE IN | 05/27/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: 5/27/26: Cancelled by Applicant in person. Not ready yet. Inspector Notes from Inspection 2060 5/26/26: Rain has caused excessive cave-in which has buried the tie-in connection. 1). Please have sewer tie-in exposed for inspection. FBC [A]110.1 NOTE: Main water line is run from meter to house but will require a gauge and pressure test. FBCR P2503.7 ***** Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/26/2026 | APPROVED - AS NOTED | RSIMS |
| Note: 5/26/26: Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| GRAVITY SEWER TEST | 05/26/2026 | APPROVED | RSIMS |
| SEWER TIE IN | 05/26/2026 | Disapproved - NO FEE | RSIMS |
| Note: 5/26/26: Rain has caused excessive cave-in which has buried the tie-in connection. 1). Please have sewer tie-in exposed for inspection. FBC [A]110.1 NOTE: Main water line is run from meter to house but will require a gauge and pressure test. FBCR P2503.7 | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 05/22/2026 | APPROVED | PFLANAGAN |
| WATER METER INSTALLATION REQUEST | 05/20/2026 | APPROVED | ISANDERSON |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| INSULATION | |||
| DRYWALL NAILING | |||
| BLD - BUILDING FINAL | |||
| Note: 5/28/26: Main underground water service piping is installed from house to meter location and a pressure test with gauge has been applied. Only the Meter connection will need to be checked prior to Final Inspection. | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| Note: 5/28/26: Main underground water service piping is installed from house to meter location and a pressure test with gauge has been applied. Only the Meter connection will need to be checked prior to Final Inspection. | |||
| ELECTRIC - EARLY POWER | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 05/21/2026 | 05/22/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/21/2026 | 05/21/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/14/2026 | 05/15/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/14/2026 | 05/14/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: At the front on both sides of the home, there shall be a minimum of 24 inches from the top of the formboard to the bottom of the footer. The footers shall gradually transition along adjacent sides of the home to accommodate the proposed grading and ensure compliance. Please ensure there are no slopes greater than 4:1. | |||
| BADMIN | INFORMATION | 05/14/2026 | 05/14/2026 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM PDf file name needs to match what your actually submitting landscape plan= landscape plan same for the grading plan | |||
| BLD | COMPLETE | 05/06/2026 | 05/11/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/06/2026 | 05/13/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/06/2026 | 05/11/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/06/2026 | 05/07/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/06/2026 | 05/07/2026 |
| LOCATE | COMPLETE | 05/06/2026 | 05/08/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 05/06/2026 | 05/07/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/06/2026 | 05/12/2026 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM Must have a onsite benchmark | |||
| ZON | HOLD | 05/06/2026 | 05/08/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape dooesn't match all other plans | |||
| URB | COMPLETE | 05/06/2026 | 05/11/2026 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤874.47 | 05/18/2026 |
| WATER- TURN ON | ¤50.00 | 05/18/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/18/2026 |
| INSPECTION - RESIDENTIAL | ¤805.75 | 05/18/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤228.54 | 05/18/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 05/18/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/18/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/18/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 05/18/2026 |
| WATER METER W/OUT TAP | ¤965.03 | 05/18/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 05/18/2026 |
| RECLAIM WATER PERMIT INSPECTIO | ¤40.00 | 05/18/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 05/18/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 05/18/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 05/18/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 05/18/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 05/18/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 05/18/2026 |
| SURCHARGE FS 533.721 | ¤10.64 | 05/18/2026 |
| SURCHARGE - FS 468.631 | ¤15.96 | 05/18/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤5,658.77 | 05/18/2026 |
| TRANSP RES IMPACT FEE 10-25 | (¤5,658.77) | 05/18/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 05/18/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 05/18/2026 |
| SEWER CAPITAL FACILITY | ¤2,368.69 | 05/18/2026 |
| WATER CAPITAL FACILITY FEE | ¤2,037.94 | 05/18/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 05/18/2026 |
| SITE PLAN 30 | ¤30.00 | 05/18/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,419.77 |