Permit #2026050347

Permit Details

Status: READY

Parcel Id: 07-11-31-7033-00140-0190
CONDITIONED SPACE: 2800 sqft
GARAGE: 1006 sqft
OPENED PORCH (WITH ROOF) : 136 sqft
ENCLOSE EXISTING PORCH TO LIVING : 290 sqft
Total Square Footage: 4232 sqft
Block: 00140
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 904-888-6443
Location Address: 40 RED MILL DR
Type: DU - DUPLEX
NOC: NO DOCUMENTATION
Applicant name: AMIR BENTOV
Owner: WILD FERN GROUP LLC

Address

324 WINDLEY DR

ST AUGUSTINE, FL 32092

Lot: 0190
Contracted Stated Job Value: ¤380,000.00
Job Description: DUPLEX
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Sub Contractors

GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
FORMBOARD SURVEY (OFFICE USE ONLY)
GEOTECHNICAL REPORT APPROVAL (OFFICE USE)
PLUMBING 1ST ROUGH UNDERGROUND
GRAVITY SEWER TEST
SEWER TIE IN
ELECTRIC - EARLY POWER
MONOLITHIC SLAB
LATH/BRICK/ WATER BARRIER
TIE BEAM / LINTEL
ALL ROUGH
FIREWALL FRAMING
FIREWALL DRYWALL NAILING
FIREWALL FINAL
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
DRYWALL NAILING
BLD - BUILDING FINAL
WATER METER INSTALLATION REQUEST
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL

Review History

Department Status Date In Date Out
ENGIN1 HOLD 06/11/2026 06/11/2026
Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM COPC Survey crew states that the benchmark nail in power pole is missing.
MECH COMPLETE 06/01/2026 06/05/2026
Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM
ELEC COMPLETE 05/26/2026 06/01/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 05/26/2026 05/28/2026
Note: Held By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM Submit updated state card for right side.
SWALE PENDING 05/12/2026
BLD COMPLETE 05/11/2026 05/15/2026
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 05/11/2026 05/14/2026
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/11/2026 05/14/2026
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 2. NEC 2020 210.52 2. DW outlet can not be located behind the DW. NEC 2020 422.16
ENGIN1 COMPLETE 05/11/2026 05/12/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 05/11/2026 05/11/2026
LOCATE COMPLETE 05/11/2026 05/11/2026
Note: Released By: IVAN SANDERSON - -
MECH HOLD 05/11/2026 05/12/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Design location on Energy calcs and Heatload need to be Daytona Beach 3. Plans show 3/4 in foam board on walls R5. Energy Calcs say R7. Revise When resubmitting, provide updated state cards
SW1 COMPLETE 05/11/2026 05/15/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/11/2026 05/13/2026
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
MECH HOLD 05/11/2026 05/12/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THIS IS THE CORRECT REVIEW. PREVIOUS HAD AN INCORRECT COMMENT 1. Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition 2. Design location on Energy calcs and Heatload need to be Daytona Beach 3. Plans show 3/4 in foam board on walls R5. Energy Calcs say R7. Revise When resubmitting, provide updated state cards
ENGIN1 PENDING

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤100.00
ADMINISTRATIVE RESIDENTIAL ¤30.00
ADMINISTRATIVE - RESID PP ¤225.00
PLAN REVIEW - RESIDENTIAL ¤450.84
FC IMPACT FEE EMS ¤124.00
FC IMPACT FEE LAW ENFORCEMENT ¤436.00
FC IMPACT FEE LIBRARY ¤536.00
FIRE RES IMPACT FEE 10-25 ¤1,884.00
PEP TANK INSTALL ¤1,513.48
PARKS IMPACT FEE 10-25 ¤6,328.00
RSI DRIVEWAY AFTER POUR ¤16.25
RSE DRIVE PRE POUR INSPECTION ¤32.50
RSI FORMBOARD REVIEW ¤16.25
RSI PLAN REVIEW NEW ¤48.75
RSI FNL SURVEY/GRADING CERT ¤48.75
RSI ROW FINAL INSPECTION ¤16.25
SCHOOL BOARD IMPACT FEE RES ¤10,900.00
WASTEWATER MAIN EXTENSION IMPA ¤4,770.00
SURCHARGE FS 533.721 ¤7.06
SURCHARGE - FS 468.631 ¤10.59
SW ENG RES REVIEW 240 ¤240.00
WATER METER W/ TAP ¤4,653.86
TRANS DUPLEX 10-25 ¤10,707.20
SEWER CREDIT (¤1,420.00)
WASTEWATER PERM INSPECTION ¤80.00
WASTEWATER PERM REVIEW ¤100.00
SEWER CAPITAL FACILITY ¤8,830.00
WATER CAPITAL FACILITY FEE ¤8,168.50
WATER PERMIT INSPECTION ¤80.00
WATER MAIN EXTENSION IMPACT ¤1,960.26
SITE PLAN 30 ¤30.00
Fees Total Due: ¤60,923.54 Total Paid: ¤0.00