I want to search for...
Permit #2007090229
Permit Details
Status: FINAL
| Parcel Id: 29-10-31-5540-01010-0640 |
| Block: 1010 |
| Subdivision: 1005 - SANCTUARY |
| Job Phone: (386)585-4045 |
| Location Address: 2 RACHEL CT |
| Type: DK - DOCK |
| Issue Date: 10/08/2007 |
| NOC: RECORDED |
| Applicant name: KEN ERICKSEN |
| Owner: ROSS, FRANK J & EVELYN M |
|
Address 2 RACHEL CT PALM COAST, FL 32137 |
| Lot: 0640 |
| Contracted Stated Job Value: ¤38,000.00 |
| Job Description: DOCK AND WALKWAYS |
| Type: CN |
Contractor
ERIKSEN MARINE CONSTRUCTION, INC.
| Status | Location Address | Phone | Fax |
| CANCEL |
P.O. BOX 352918 PALM COAST, FL 32135 |
(386)445-7466 | (386)445-0926 |
Sub Contractors
KURT A UMBACH
| Status | Location Address | State License Number | Phone | Fax |
| HOLD |
110 Foster Lane Palm Coast, FL 32137 |
EC13003356 (Exp: 08/31/2020) | (386) 446-3616 | (386)446-3548 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL INSPECTION (MISC) | 02/14/2008 | FINAL APPROVED | DROCKWELL |
| STORMWATER FINAL INSPECTION | 02/11/2008 | APPROVED - AS NOTED | DRANDALL |
| Note: THIS IS A REINSPECTION Regrading, seed and straw will be on seawall permit.\\wk | |||
| STORMWATER FINAL INSPECTION | 02/07/2008 | Disapproved - NO FEE | DRANDALL |
| Note: seed & straw all exposed earth on left adj. property.....due to more loads of rock brought onto site damage has accurred to left side vacant lot |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/27/2007 | 09/28/2007 |
| Note: Released By: FREODICA Reviewed by Auba. | |||
| ZON | COMPLETE | 09/25/2007 | 09/25/2007 |
| Note: Released By: ECOYNE | |||
| BLD | HOLD | 09/25/2007 | 09/26/2007 |
| Note: Held By: JJOSEPH Need to submit the master file copies of the plan approved by th city of Palm coast. | |||
| PLENV | COMPLETE | 09/24/2007 | 09/24/2007 |
| Note: Released By: DBEVAN No comments. | |||
| ZON | HOLD | 09/21/2007 | 09/24/2007 |
| Note: Held By: ECOYNE sent to enviromental planner for review | |||
| SW1 | COMPLETE | 09/18/2007 | 09/21/2007 |
| Note: Released By: LAPTEKAR received current site plan with dock ///per MB approve site as noted: approved per ACOE and DEP restrictions. | |||
| SW1 | HOLD | 09/13/2007 | 09/18/2007 |
| Note: Held By: LAPTEKAR Released By: LAPTEKAR Proposed dock needs to be on a current site plan. A copy of the final survey is available. Hold for MB to check. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PERMIT FEE | ¤228.00 | 10/08/2007 |
| PLAN CHECK FEE | ¤40.00 | 10/08/2007 |
| STORM WATER PERMIT FEES | ¤50.00 | 10/08/2007 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤318.00 |