I want to search for...
Permit #2015010295
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7033-00450-0080 |
| CONDITIONED SPACE: 940 sqft |
| Total Square Footage: 940 sqft |
| Block: 00450 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-437-2997 |
| Location Address: 117 RED MILL DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 02/04/2015 |
| NOC: RECORDED |
| Applicant name: THOMAS CHARLES TALLAKSEN JR. |
| Owner: RHODES, DEBRA |
|
Address 1 LAKE PLACID PLACE PALM COAST, FL 32137 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤80,000.00 |
| Job Description: REAR ADDITION |
| Type: CN |
Contractor
TALLY'S CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
503 SOUTH OLD DIXIE HWY BUNNELL, FL 32110 |
CRC1330234 (Exp: 08/31/2024) | 386-931-2990 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
THOMAS CHARLES TALLAKSEN JR.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
503 SOUTH OLD DIXIE HWY BUNNELL, FL 32110 |
CCC1327743 (Exp: 08/31/2024) | 386-931-2990 | (386)437-2279 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 08/21/2015 | FINAL APPROVED | MBACON |
| BLD - BUILDING FINAL | 08/19/2015 | APPROVED | JHINDMAN |
| FINAL SURVEY (OFFICE USE ONLY) | 08/13/2015 | APPROVED | DREWIS |
| ALL ROUGH | 05/22/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 05/22/2015 | APPROVED | DROCKWELL |
| ALL ROUGH | 05/07/2015 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Inspection Resulted at 5/7/2015 10:22:21 AM REVISE PLAN TO SHOW WATER HEATER LOCATION AND PROVIDE ELECT NOTATION/PROVIDE ACCESS TO ATTIC WITH LIGHT/ANCHOR ALL WINDOWS TO BLOCK/ADD POCKET DOOR TO REVISED PLAN | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2015 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 03/24/2015 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 03/23/2015 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/09/2015 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 03/05/2015 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: Inspection Resulted at 3/5/2015 11:36:15 AM MINIMUM DEPTH ON FOOTERS UNDISTURBED SOIL..FBC..403.1.4 (SHOWN ON DETAIL). DETAIL SHOWS 24" #4 BARS ACCROSS @ 36" OC FOR FM APPLICATIONS. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/23/2015 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 08/20/2015 | 08/20/2015 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 08/12/2015 | 08/13/2015 |
| Note: Released By: DREWIS FINAL SURVEY | |||
| ELEC | HOLD | 06/02/2015 | 06/09/2015 |
| Note: 1. The fire alarm must be submitted as a separate permit.. The permit submission must include battery calculations and manufacturers specifications on the panel and devices. | |||
| ELEC | COMPLETE | 05/21/2015 | 05/21/2015 |
| BLD | COMPLETE | 05/20/2015 | 05/21/2015 |
| ELEC | HOLD | 05/20/2015 | 05/21/2015 |
| Note: 1. Provide a separate permit for the fire alarm | |||
| PLUM | COMPLETE | 05/20/2015 | 05/21/2015 |
| Note: Revision - added water heater. | |||
| SW1 | COMPLETE | 03/20/2015 | 03/23/2015 |
| Note: Released By: JHINDMAN foundation s | |||
| PLUM | COMPLETE | 02/03/2015 | 02/03/2015 |
| MECH | COMPLETE | 01/29/2015 | 02/02/2015 |
| PLUM | HOLD | 01/29/2015 | 02/02/2015 |
| Note: Previous comment dated 1-26-15 shall be addressed - Submitted correction of riser diagram using individual venting shall comply also with 2010 FBCR P3104.4 which states- Every dry vent shall rise vertically to the minimum of 6 inches above the flood level rim of the highest trap or trap fixture being vented. Unfortunately, the vent of lavatories (common vented) is located below the flood level rim of the highest trap being vented. | |||
| ELEC | COMPLETE | 01/21/2015 | 01/23/2015 |
| PLUM | HOLD | 01/21/2015 | 01/26/2015 |
| Note: Submitted correction of riser diagram using individual venting shall comply also with 2010 FBCR P3104.4 which states- Every dry vent shall rise vertically to the minimum of 6 inches above the flood level rim of the highest trap or trap fixture being vented. Unfortunately, the vent of lavatories (common vented) is located below the flood level rim of the highest trap being vented. | |||
| MECH | HOLD | 01/21/2015 | 01/26/2015 |
| Note: Energy Performance Level (EPL) Display Card shall be signed by builder per 2020 FBCEC 405.4.3. | |||
| BLD | COMPLETE | 01/15/2015 | 01/16/2015 |
| ELEC | HOLD | 01/15/2015 | 01/15/2015 |
| Note: 1. Provide a disconnect for the Air Handler unit 2008 NEC art 422. | |||
| MECH | HOLD | 01/15/2015 | 01/16/2015 |
| Note: Provide energy calculation, equipment sizing calculation and duct system layout per 2010 FBC 107.2.1/FBCEC 403.6. | |||
| PLUM | HOLD | 01/15/2015 | 01/16/2015 |
| Note: Revise the venting system of the new bathroom to comply either per 2010 FBCR P3106 (individual vent) or P3108 (wet venting). | |||
| SW1 | COMPLETE | 01/15/2015 | 01/15/2015 |
| ZON | COMPLETE | 01/15/2015 | 01/16/2015 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 08/13/2015 |
| REVISION | ¤40.00 | 08/13/2015 |
| REINSPECTION FEE | ¤40.00 | 08/13/2015 |
| REINSPECTION FEE | ¤40.00 | 03/23/2015 |
| REMODEL/ADDITION/ACCES INSPECT | ¤41.60 | 02/04/2015 |
| SITE PLAN 20 | ¤20.00 | 02/04/2015 |
| SURCHARGE FS 533.721 | ¤7.06 | 02/04/2015 |
| SURCHARGE - FS 468.631 | ¤7.06 | 02/04/2015 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/04/2015 |
| ADMIN FEE | ¤20.00 | 02/04/2015 |
| ELECTRIC FEE | ¤122.40 | 02/04/2015 |
| MECHANICAL FEE | ¤122.40 | 02/04/2015 |
| PLAN CHECK FEE | ¤41.60 | 02/04/2015 |
| PLUMBING FEE | ¤122.40 | 02/04/2015 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤744.52 |