Permit #2021090510
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7023-00080-0150 |
| Block: 00080 |
| Subdivision: 2191 - SECTION 23-WYNNFIELD |
| Job Phone: 904-235-5224 |
| Location Address: 13 WHITCOCK LN |
| Type: RF - REROOF |
| Issue Date: 09/13/2021 |
| NOC: RECORDED |
| Applicant name: DENNIS JAMES ALTON JR |
| Owner: GRANRUTH KENNETH W JR & DEBORAH J GRANRUTH H&W |
|
Address 736 HIGH PLAIN DRIVE BEL AIR, MD 21014 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤11,825.00 |
| Job Description: REROOF FL10674.1-R12 |
| Type: CN |
Contractor
ALTON ROOFING SERVICES
| Status | Location Address | State License Number | Phone |
| CANCEL |
532 LOCUST STREET JACKSONVILLE, FL 32254 |
RC29027510 (Exp: 08/31/2023) | 904-235-5224 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 09/23/2021 | FINAL APPROVED | FWILLIS |
| ROOF AFFIDAVIT | 09/22/2021 | APPROVED | STHOMAS |
| ROOF IN PROGRESS- MIDROOF | 09/20/2021 | APPROVED | KSANDOE |
| Note: THIS IS A REINSPECTION New inspection due to canceled inspection THIS IS A REINSPECTION 9/17/21 Stopped at job 2 times. Roof is not ready for a midroof some underlayment installed no drip edge. The purpose of the in-progress / dry-in inspection is primarily so inspectors can check underlayment installation, to verify roof deck condition and spot check roof sheathing re-nailing but to also check materials in use match what is shown on roofing worksheets. The in-progress / dry-in inspection must be scheduled at a point where installation of roofing underlayment is at least 50% to 100% complete and the roof covering installation is not more than 25% complete. All drip edge flashings complete. There is some flexibility to these parameters and inspectors will work to coordinate inspection times throughout the day to keep re-roofing projects moving. | |||
| ROOF IN PROGRESS- MIDROOF | 09/17/2021 | CANCELLED BY APPLICANT | WEB |
| Note: THIS IS A REINSPECTION | |||
| ROOF IN PROGRESS- MIDROOF | 09/17/2021 | Disapproved - NO FEE | JWALKER |
| Note: New inspection due to canceled inspection THIS IS A REINSPECTION 9/17/21 Stopped at job 2 times. Roof is not ready for a midroof some underlayment installed no drip edge. The purpose of the in-progress / dry-in inspection is primarily so inspectors can check underlayment installation, to verify roof deck condition and spot check roof sheathing re-nailing but to also check materials in use match what is shown on roofing worksheets. The in-progress / dry-in inspection must be scheduled at a point where installation of roofing underlayment is at least 50% to 100% complete and the roof covering installation is not more than 25% complete. All drip edge flashings complete. There is some flexibility to these parameters and inspectors will work to coordinate inspection times throughout the day to keep re-roofing projects moving. | |||
| ROOF IN PROGRESS- MIDROOF | 09/16/2021 | CANCELLED BY APPLICANT | KSANDOE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/13/2021 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 09/13/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 09/13/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 09/13/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤94.00 |