Permit #2022040319

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7014-00060-0270
Block: 00060
Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE
Job Phone: 386-313-1897
Location Address: 19 CEDARWOOD CT
Type: DR - DRIVEWAY
Issue Date: 05/26/2022
NOC: RECORDED
Applicant name: ERIC KACHNYCZ
Owner: WELLS JOHN FARNHAM & LINDA TERECH WELLS TRUSTEES

Address

19 CEDARWOOD CT

PALM COAST, FL 32137

Lot: 0270
Contracted Stated Job Value: ¤10,000.00
Job Description: PAVER DRIVEWAY
Type: CN

Contractor

DONE RIGHT SINCE 1985
Status Location Address Phone
ACTIVE

1405 KINGS ESTATE RD

ST AUGUSTINE, FL 32086

(904) 533-6373

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 12/13/2022 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 07/13/2022 APPROVED - AS NOTED EMADISON
Note: ** EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION.. ** DRIVEWAY REPAIR HOT PATCH HAS NOT BEEN INSTALLED AT THE TIME OF THE INSPECTION ** AT THE TIME OIF THE INSPECTION EVRYTHING LOOKS GOOD, PAVER BASE HAS BEEN SPREAD AND COMPACTED. ** NOT READY FOR INSPECTION AS PAVER BASE HAS NOT BEEN SPREAD OR COMPACTED AT THE TIME OF MY INSPECTION. EM ** APRON POURED NEED PAVER BASE SPREAD AND COMPACTED AND INSPECTED BEFORE FINAL WILL BE APPROVED.. ** CONCRETE IS NOT THICK ENOUGH OVER PIPE CONCRETE IN FRONT HALF OF APRON IS MOSTLY A SKIM OF PROB BROKE THROUGH WHEN TESTED, ALONG WITH IMPRINTED TIRE TRACKS THAT BROKE APART CONCRETE. ATTEMPTED TO CONTACT BUILDER WITH NO SUCCESS. ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW - FINAL INSPECTION 07/13/2022 APPROVED - AS NOTED EMADISON
Note: ** EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION
ROW - FINAL APRON (AFTER POUR) 06/21/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** DRIVEWAY REPAIR HOT PATCH HAS NOT BEEN INSTALLED AT THE TIME OF THE INSPECTION ** AT THE TIME OIF THE INSPECTION EVRYTHING LOOKS GOOD, PAVER BASE HAS BEEN SPREAD AND COMPACTED. ** NOT READY FOR INSPECTION AS PAVER BASE HAS NOT BEEN SPREAD OR COMPACTED AT THE TIME OF MY INSPECTION. EM ** APRON POURED NEED PAVER BASE SPREAD AND COMPACTED AND INSPECTED BEFORE FINAL WILL BE APPROVED.. ** CONCRETE IS NOT THICK ENOUGH OVER PIPE CONCRETE IN FRONT HALF OF APRON IS MOSTLY A SKIM OF PROB BROKE THROUGH WHEN TESTED, ALONG WITH IMPRINTED TIRE TRACKS THAT BROKE APART CONCRETE. ATTEMPTED TO CONTACT BUILDER WITH NO SUCCESS. ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW- PRE-APRON (PRE-POUR) 06/16/2022 APPROVED - AS NOTED EMADISON
Note: ** AT THE TIME OIF THE INSPECTION EVRYTHING LOOKS GOOD, PAVER BASE HAS BEEN SPREAD AND COMPACTED. ** NOT READY FOR INSPECTION AS PAVER BASE HAS NOT BEEN SPREAD OR COMPACTED AT THE TIME OF MY INSPECTION. EM ** APRON POURED NEED PAVER BASE SPREAD AND COMPACTED AND INSPECTED BEFORE FINAL WILL BE APPROVED.. ** CONCRETE IS NOT THICK ENOUGH OVER PIPE CONCRETE IN FRONT HALF OF APRON IS MOSTLY A SKIM OF PROB BROKE THROUGH WHEN TESTED, ALONG WITH IMPRINTED TIRE TRACKS THAT BROKE APART CONCRETE. ATTEMPTED TO CONTACT BUILDER WITH NO SUCCESS. ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW- PRE-APRON (PRE-POUR) 06/14/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** NOT READY FOR INSPECTION AS PAVER BASE HAS NOT BEEN SPREAD OR COMPACTED AT THE TIME OF MY INSPECTION. EM ** APRON POURED NEED PAVER BASE SPREAD AND COMPACTED AND INSPECTED BEFORE FINAL WILL BE APPROVED.. ** CONCRETE IS NOT THICK ENOUGH OVER PIPE CONCRETE IN FRONT HALF OF APRON IS MOSTLY A SKIM OF PROB BROKE THROUGH WHEN TESTED, ALONG WITH IMPRINTED TIRE TRACKS THAT BROKE APART CONCRETE. ATTEMPTED TO CONTACT BUILDER WITH NO SUCCESS. ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW- PRE-APRON (PRE-POUR) 06/13/2022 PARTIALLY APPROVED EMADISON
Note: ** APRON POURED NEED PAVER BASE SPREAD AND COMPACTED AND INSPECTED BEFORE FINAL WILL BE APPROVED.. ** CONCRETE IS NOT THICK ENOUGH OVER PIPE CONCRETE IN FRONT HALF OF APRON IS MOSTLY A SKIM OF PROB BROKE THROUGH WHEN TESTED, ALONG WITH IMPRINTED TIRE TRACKS THAT BROKE APART CONCRETE. ATTEMPTED TO CONTACT BUILDER WITH NO SUCCESS. ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW- PAVER RESTRAINTS 06/13/2022 APPROVED - AS NOTED EMADISON
Note: * EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION * PAVER RESTRAINTS ARE READY TO POUR * NEED TO HAVE PAVER BASE ON SITE AND COMPACTED FOR FINAL APPROVAL * PAVER RESTRAINTS NEED TO BE 8" DEEP BY 4" WIDE CURRENTLY NOT WITHIN THE TOERANCES
ROW- PRE-APRON (PRE-POUR) 06/08/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** CONCRETE IS NOT THICK ENOUGH OVER PIPE CONCRETE IN FRONT HALF OF APRON IS MOSTLY A SKIM, PROB BROKE THROUGH WHEN TESTED, ALONG WITH IMPRINTED TIRE TRACKS THAT BROKE APART CONCRETE. ATTEMPTED TO CONTACT BUILDER WITH NO SUCCESS. ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW- PRE-APRON (PRE-POUR) 06/06/2022 PARTIALLY APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD IN THE EVENT OF RAIN RECHECK ELEVATIONS AND ENSURE POUR AREA IS NOT TO SOFT. ** NEED PAVER BASE ON SITE AND COMPACTED BEFORE FINAL IS APPROVED * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.
ROW- PAVER RESTRAINTS 06/06/2022 PARTIALLY APPROVED EMADISON
Note: * PAVER RESTRAINTS ARE READY TO POUR * NEED TO HAVE PAVER BASE ON SITE AND COMPACTED FOR FINAL APPROVAL * PAVER RESTRAINTS NEED TO BE 8" DEEP BY 4" WIDE CURRENTLY NOT WITHIN THE TOERANCES
ROW- PAVER RESTRAINTS 06/03/2022 Disapproved - NO FEE EMADISON
Note: * PAVER RESTRAINTS NEED TO BE 8" DEEP BY 4" WIDE CURRENTLY NOT WITHIN THE TOERANCES
ROW- PRE-APRON (PRE-POUR) 06/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: * FORM BOARDS ARE NOT SET AND ATTACHED LEFT SIDE WING, IS OUT OF TO,LERANCE.

Review History

Department Status Date In Date Out
ZON COMPLETE 04/26/2022 04/26/2022
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/07/2022 04/12/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 04/07/2022 04/08/2022
Note: Released By: DON HANEY - - DHANEY@PALMCOASTGOV.COM
ZON HOLD 04/07/2022 04/08/2022
Note: Held By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM Please submit the ORIGINAL ROW agreement to complete this review.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 07/13/2022
SW ENG REINSPECTION 30 ¤30.00 07/13/2022
SW ENG REINSPECTION 30 ¤30.00 07/13/2022
SW ENG REINSPECTION 30 ¤30.00 07/13/2022
SW ENG RES REVIEW 200 ¤200.00 05/26/2022
SITE PLAN 15 ¤15.00 05/26/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/26/2022
SW ENG INSPECTION 40 ¤40.00 05/26/2022
SW ENG PRE APRON ¤30.00 05/26/2022
RECORDING FEE REIMBURSE DOC ¤44.00 04/26/2022
Fees Total Due: ¤0.00 Total Paid: ¤469.00