Permit #2025120615
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7003-00120-0100 |
| Block: 00120 |
| Subdivision: - |
| Job Phone: 386-627-8289 |
| Location Address: 20 CORAL REEF CT S |
| Type: SW - SEAWALL |
| Issue Date: 01/14/2026 |
| NOC: RECORDED |
| Applicant name: ROBERT E WILLIAMS |
| Owner: KATHLEEN O'CONNOR |
|
Address 20 CORAL REEF CT S PALM COAST, FL 32137 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤45,000.00 |
| Job Description: Remove and replace 80' of seawall with 1 return |
| Type: CN |
Contractor
ELITE MARINE CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
14 UTILITY DR SUITE9 PALM COAST, FL 32137 |
SCC131152486 (Exp: 08/31/2026) | 386-627-8289 |
Inspection History
| Type | Request Date | Result | Inspector |
| SEAWALL FINAL | 04/16/2026 | FINAL APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2570 3/19/26 Electrical and water lines will be buried back in the ground and anchored back into fencing that was taken down for the seawall to be made. Irrigation line will not be moved and will be in front of wall as before 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 1. Upon inspection electrical, water, and irrigation lines were visible throughout the wall. Please revise the plans to show where these lines are going to be placed or removed | |||
| ROW - STORMWATER FINAL | 04/15/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 4/14/2026 - PREVIOUS INSPECTION NOTES 4/14/26 TURBIDITY BARRIER IS STILL IN PLACE AND HAS NOT BEEN REMOVED AT THE TIME OF THIS INSPECTION. ____________________________________________________________________________________________________________________________ 4/13/2026 - PREVIOUS INSPECTION NOTES 04-13-26 TPOLACEK*** INSPECTOR RANG VIDEO DOORBELL HOWEVER THERE WAS NO ANSWER. INSPECTOR NEEDS PERMISSION TO ENTER THROUGH GATE TO COMPLETE INSPECTION. I WILL CANCEL THE OTHER INSPECTION AS WELL UNTIL PERMISSION IS GRANTED BY EITHER A NOT IN APPLICANT NOTE SECTION OR A NOTE AT FRONT DOOR. Inspector Notes from Inspection 9215 TALKED WITH CONTRACTOR ON SITE AND TOLD THE TO PULL THE TURBIDITY BARRER TOGETHER TO MAKE ONE BARRER PASSING AS NOTED THAT THE WORKERS STATED THAT THEY WOULD CORRECT THE ISSUE. IT'S YOUR RESPONSIBILITY TO KEEP TURBIDITY BARRER OPERATING CORRECTLY THROUGH OUT CONSTRUCTION OF SEAWALL. | |||
| ROW - STORMWATER FINAL | 04/14/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 4/14/26 TURBIDITY BARRIER IS STILL IN PLACE AND HAS NOT BEEN REMOVED AT THE TIME OF THIS INSPECTION. ____________________________________________________________________________________________________________________________ 4/13/2026 - PREVIOUS INSPECTION NOTES 04-13-26 TPOLACEK*** INSPECTOR RANG VIDEO DOORBELL HOWEVER THERE WAS NO ANSWER. INSPECTOR NEEDS PERMISSION TO ENTER THROUGH GATE TO COMPLETE INSPECTION. I WILL CANCEL THE OTHER INSPECTION AS WELL UNTIL PERMISSION IS GRANTED BY EITHER A NOT IN APPLICANT NOTE SECTION OR A NOTE AT FRONT DOOR. Inspector Notes from Inspection 9215 TALKED WITH CONTRACTOR ON SITE AND TOLD THE TO PULL THE TURBIDITY BARRER TOGETHER TO MAKE ONE BARRER PASSING AS NOTED THAT THE WORKERS STATED THAT THEY WOULD CORRECT THE ISSUE. IT'S YOUR RESPONSIBILITY TO KEEP TURBIDITY BARRER OPERATING CORRECTLY THROUGH OUT CONSTRUCTION OF SEAWALL. | |||
| ROW - FINAL INSPECTION | 04/14/2026 | APPROVED | FSLADISH |
| Note: 4/14/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _______________________________________________________________________________________________________________________________ 4/13/2026 - PREVIOUS INSPECTION NOTES 04-13-26 TPOLACEK*** INSPECTOR RANG VIDEO DOORBELL HOWEVER THERE WAS NO ANSWER. INSPECTOR NEEDS PERMISSION TO ENTER THROUGH GATE TO COMPLETE INSPECTION. I WILL CANCEL THE OTHER INSPECTION AS WELL UNTIL PERMISSION IS GRANTED BY EITHER A NOT IN APPLICANT NOTE SECTION OR A NOTE AT FRONT DOOR. Inspector Notes from Inspection 9215 TALKED WITH CONTRACTOR ON SITE AND TOLD THE TO PULL THE TURBIDITY BARRER TOGETHER TO MAKE ONE BARRER PASSING AS NOTED THAT THE WORKERS STATED THAT THEY WOULD CORRECT THE ISSUE. IT'S YOUR RESPONSIBILITY TO KEEP TURBIDITY BARRER OPERATING CORRECTLY THROUGH OUT CONSTRUCTION OF SEAWALL. | |||
| ROW - STORMWATER FINAL | 04/13/2026 | Disapproved - NO FEE | TPOLACEK |
| Note: 04-13-26 TPOLACEK*** INSPECTOR RANG VIDEO DOORBELL HOWEVER THERE WAS NO ANSWER. INSPECTOR NEEDS PERMISSION TO ENTER THROUGH GATE TO COMPLETE INSPECTION. I WILL CANCEL THE OTHER INSPECTION AS WELL UNTIL PERMISSION IS GRANTED BY EITHER A NOT IN APPLICANT NOTE SECTION OR A NOTE AT FRONT DOOR. Inspector Notes from Inspection 9215 TALKED WITH CONTRACTOR ON SITE AND TOLD THE TO PULL THE TURBIDITY BARRER TOGETHER TO MAKE ONE BARRER PASSING AS NOTED THAT THE WORKERS STATED THAT THEY WOULD CORRECT THE ISSUE. IT'S YOUR RESPONSIBILITY TO KEEP TURBIDITY BARRER OPERATING CORRECTLY THROUGH OUT CONSTRUCTION OF SEAWALL. | |||
| ROW - FINAL INSPECTION | 04/13/2026 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 04-13-26 TPOLACEK*** INSPECTOR RANG VIDEO DOORBELL HOWEVER THERE WAS NO ANSWER. INSPECTOR NEEDS PERMISSION TO ENTER THROUGH GATE TO COMPLETE INSPECTION. I WILL CANCEL THE OTHER INSPECTION AS WELL UNTIL PERMISSION IS GRANTED BY EITHER A NOT IN APPLICANT NOTE SECTION OR A NOTE AT FRONT DOOR. Inspector Notes from Inspection 9215 TALKED WITH CONTRACTOR ON SITE AND TOLD THE TO PULL THE TURBIDITY BARRER TOGETHER TO MAKE ONE BARRER PASSING AS NOTED THAT THE WORKERS STATED THAT THEY WOULD CORRECT THE ISSUE. IT'S YOUR RESPONSIBILITY TO KEEP TURBIDITY BARRER OPERATING CORRECTLY THROUGH OUT CONSTRUCTION OF SEAWALL. | |||
| SEAWALL DEADMAN CAP | 03/19/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/19/26 Electrical and water lines will be buried back in the ground and anchored back into fencing that was taken down for the seawall to be made. Irrigation line will not be moved and will be in front of wall as before 3/17/2026 - PREVIOUS INSPECTION NOTES 3/17/26 1. Upon inspection electrical, water, and irrigation lines were visible throughout the wall. Please revise the plans to show where these lines are going to be placed or removed | |||
| SEAWALL DEADMAN CAP | 03/17/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 3/17/26 1. Upon inspection electrical, water, and irrigation lines were visible throughout the wall. Please revise the plans to show where these lines are going to be placed or removed | |||
| ROW -TURBIDITY BARRER | 02/12/2026 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED WITH CONTRACTOR ON SITE AND TOLD THE TO PULL THE TURBIDITY BARRER TOGETHER TO MAKE ONE BARRER PASSING AS NOTED THAT THE WORKERS STATED THAT THEY WOULD CORRECT THE ISSUE. IT'S YOUR RESPONSIBILITY TO KEEP TURBIDITY BARRER OPERATING CORRECTLY THROUGH OUT CONSTRUCTION OF SEAWALL. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/08/2026 | 01/09/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/18/2025 | 12/22/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1.Only one side shows a seawall return. Provide structural connection of seawall cap to adjacent seawall cap or provide a seawall return. Seawall returns to extend a minimum of 10 Feet into the property and constructed in the same manner as other parts of the seawall. The seawall return may need to extend further into the lot a sufficient distance to ensure the completed post-construction grading can be completedin a manner so that the lot stormwater drainage remains on the lot until it flows over the seawall and does not top or circumvent the return and impact adjacent lot owner. COPCTM SECTION 1100.09, DRAWING #1100.G. | |||
| ENGIN1 | COMPLETE | 12/18/2025 | 12/19/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/18/2025 | 12/18/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 04/15/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 01/14/2026 |
| RSI ROW STORMWATER FINAL INSP | ¤32.50 | 01/14/2026 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/14/2026 |
| SURCHARGE - FS 468.631 | ¤2.79 | 01/14/2026 |
| SITE PLAN 15 | ¤15.00 | 01/14/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/14/2026 |
| INSPECTION - RESIDENTIAL | ¤123.75 | 01/14/2026 |
| PLAN REVIEW - MISC 32.50 | ¤32.50 | 01/14/2026 |
| RSI GENERAL INSPECTION 16.25 | ¤16.25 | 01/14/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤306.04 |