I want to search for...
Permit #2026010483
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7030-00300-0260 |
| CONDITIONED SPACE: 1654 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 12 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| Total Square Footage: 2162 sqft |
| Block: 00300 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 40 RADFORD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/02/2026 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LAND LLC |
|
Address 7380 WEST SAND LAKE ROAD ORLANDO, FL 32819 |
|
Address SUITE 600 ORLANDO, FL 32819 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| DRYWALL NAILING | 06/12/2026 | CVANSTRAHLEN | |
| INSULATION | 06/09/2026 | APPROVED | CVANSTRAHLEN |
| PEP TANK INSTALLATION REQUEST | 06/09/2026 | APPROVED | ISANDERSON |
| LATH/BRICK/ WATER BARRIER | 06/02/2026 | APPROVED | CVANSTRAHLEN |
| ALL ROUGH | 06/02/2026 | APPROVED | CVANSTRAHLEN |
| Note: 5/29/2026 - PREVIOUS INSPECTION NOTES Please fix item before next inspection #1-Missing E-cals #2-Missing Fl approval sheet | |||
| ALL ROUGH | 05/29/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix item before next inspection #1-Missing E-cals #2-Missing Fl approval sheet | |||
| ELECTRIC-TUG | 05/28/2026 | APPROVED | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 05/26/2026 | APPROVED | CVANSTRAHLEN |
| WALL SHEATHING | 05/22/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/22/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING | 05/14/2026 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 05/06/2026 | APPROVED | CVANSTRAHLEN |
| Note: 5/4/2026 - PREVIOUS INSPECTION NOTES Please fix item before next inspection ( Back by portch ) Item #2 from previous inspection is been fix , item #1 not fix , not tie in to the down cell , rebard came out after gentle pull ! 4/30/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBCR 606.3.4-COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL) on back side , mark with orange spray ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS ( Left side wall , mark with orange spray ) | |||
| TIE BEAM / LINTEL | 05/04/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix item before next inspection ( Back by portch ) Item #2 from previous inspection is been fix , item #1 not fix , not tie in to the down cell , rebard came out after gentle pull ! 4/30/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBCR 606.3.4-COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL) on back side , mark with orange spray ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS ( Left side wall , mark with orange spray ) | |||
| TIE BEAM / LINTEL | 04/30/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBCR 606.3.4-COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL) on back side , mark with orange spray ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS ( Left side wall , mark with orange spray ) | |||
| GRAVITY SEWER TEST | 04/28/2026 | APPROVED | CVANSTRAHLEN |
| MONOLITHIC SLAB | 04/23/2026 | APPROVED | KSANDOE |
| Note: 4/22/2026 - PREVIOUS INSPECTION NOTES Vapor barrier must cover entirety of living space exxtending into footer. R506.2.3 Minimum coverage for reinforcing steel must be 3". R404.1.3.3.7.4 Support and cover | |||
| MONOLITHIC SLAB | 04/22/2026 | Disapproved - NO FEE | KSANDOE |
| Note: Vapor barrier must cover entirety of living space exxtending into footer. R506.2.3 Minimum coverage for reinforcing steel must be 3". R404.1.3.3.7.4 Support and cover | |||
| ELECTRIC UNDERGROUND | 04/22/2026 | CANCELLED BY INSPECTOR | KSANDOE |
| Note: Not required for this project | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/17/2026 | APPROVED | CVANSTRAHLEN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/15/2026 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/15/2026 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/31/2026 | APPROVED | ISANDERSON |
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/15/2026 | 04/15/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/15/2026 | 04/15/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2026 | 04/15/2026 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/07/2026 | 04/08/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please upload geotech certification letter. | |||
| SW1 | COMPLETE | 02/05/2026 | 02/05/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM I've spoke with SWA and compared elevations to our survey team notes. The front property line elevation on the right side will be adrdressed out in the field. All 3 surveys have the edge of pavement different but within 0.2'. | |||
| ZON | COMPLETE | 02/05/2026 | 02/05/2026 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/20/2026 | 01/27/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/16/2026 | 01/23/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/16/2026 | 01/23/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/16/2026 | 01/22/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/16/2026 | 01/20/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/16/2026 | 01/20/2026 |
| LOCATE | COMPLETE | 01/16/2026 | 01/22/2026 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/16/2026 | 01/21/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/16/2026 | 01/23/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Lot 27 is approved and is under construction. I've attached the approved grading plan, please ensure the proposed common swale matches the approved grading to ensure there are no issues later. | |||
| ZON | HOLD | 01/16/2026 | 01/16/2026 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please correct the number of crepe myrtle trees on the landscape plan. The legend shows 6 however there are only 4 drawn on the plan itself. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 03/02/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/02/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/02/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 03/02/2026 |
| PEP TANK INSTALL | ¤756.74 | 03/02/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 03/02/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 03/02/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 03/02/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 03/02/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 03/02/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 03/02/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 03/02/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 03/02/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 03/02/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 03/02/2026 |
| SURCHARGE FS 533.721 | ¤11.53 | 03/02/2026 |
| SURCHARGE - FS 468.631 | ¤17.29 | 03/02/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 03/02/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 03/02/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤6,235.58 | 03/02/2026 |
| SEWER CREDIT | (¤1,147.00) | 03/02/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 03/02/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 03/02/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 03/02/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 03/02/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 03/02/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 03/02/2026 |
| SITE PLAN 30 | ¤30.00 | 03/02/2026 |
| WATER- TURN ON | ¤50.00 | 03/02/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/02/2026 |
| INSPECTION - RESIDENTIAL | ¤874.50 | 03/02/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤248.04 | 03/02/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤80.00 | Total Paid: ¤31,642.87 |