
Water Treatment Plants
The three City of Palm Coast water treatment plants have a total permitted capacity of 16.584 million gallons per day (MGD). The three water treatment plants supply water to the water distribution system which includes approximately 70 miles of water mains, 4,000 fire hydrants, and two (2) elevated storage tanks with capacities of 0.75 MG and 0.4 MG.
Navigation Menu
Learn More About Each Water Treatment Plant:
Water Treatment Plant #1
Water Treatment Plant #1 was built in 1977 and expanded in 1982. It is classified as a conventional lime softening & filtration plant.
WTP #1Water Treatment Plant #2
Water Treatment Plant #2 is located in the southern portion of the city. Water Treatment Plant #2 was designed, permitted and built in the early 1990’s.
WTP #2Water Treatment Plant #3
Water Treatment Plant #3 was designed, permitted, and ultimately constructed from 2006-2008, and placed in operation in July 2008.
WTP #3